AIA Agreement with Alta Construction for Storey Park Development - Bid Package No. 1: Sitework, Utilities, Asphalt
AIA DocumentA132"' - 2009 Standard Form ofAgreement Between Ownerand Contractor,Construction Manageras Adviser Edition Bid Package No. 1- Site work,L811des, Asphalt Paving, and Concrete ADDITIONS AND DELETIONS: AGREEMENT made as of the day of in the year The author of this document has (!n words, indicate day, month and year.) added Information needed for Its completion. The author may also BETWEEN the Owner: have revised the text of the original (Name, legalstalas, address and other information) AIA standard form; An Additions and Deletions Report that notes added City of Meridian _ Information as well as revisions to the 33 East Broadway Avenue standard form text is available from Meridian, Idaho 83642 the author and should be reviewed. A. vertical line In the left margin of this and the Contractor: document Indicates where the author. (Name, legal status, address and other information) has added necessary Information - - and where the author has added to or Alta Construction, Inc. deleted from the: original AIA text. 619 North Cloverdale This document has Important legal Boise, Idaho 83713 consequences. Consultation with an. .Telephone Number: 208-853-1720 attorney Is encouraged with respect;. Fax Number: 208-853-6588 to Its completion or modification. This document Is Intended to be used for the following Project: g J in conjunction with AIA Documents - . '.(Name, location and detailed description) A232"-2009, General Conditions of the Contract for Construction, Storey Park Development Construction Manager as Adviser 430 East Watertower Lane Edition; 8132w-2009, Standard Meridian, Idaho 83642 Form of Agreement Between Owner and Architect; Construction Manager The Construction Manager. as Adviser Edition: and (Name, legal statas,address and other information) C132--2009, Standard Farm of Agreement Between Owner and Kreizenbeck,. LLC DBA Kreizenbeck Constructors Construction Manager as Adviser. 11724 West Executive Drive AIA Document A232TM-2009 1s 'Boise, Idaho 83713 adopted in this document by Telephone Number: (208) 336-9500 reference. Do not use with other Fax Number: (208) 336-7444 general conditions unless this document Is modified. The Architect: (Name, legal status, address and other h1formation) -. Insight Architects, P.A. .2238 South Broadway Avenue Boise, Idaho: 83706 Telephone Number: (208) 338-9080 The Owner and Contractor agree as follows. InIL I TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract, together with the s. performancebond and payment bond, if any, represent the entire and integrated agreement between the parties hereto and supersedes prior: negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents,other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully, execute the Workdescribedin the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Contract Requirements: Provide all labor, material, equipment and permits to complete the Site clearing, Earthwork, Utilities,. Asphalt paving, building concrete, and site concrete as noted on the construction documents and per the following: 'Division l— General Requirements, Complete Section 321216- Asphalt Pavement Division 31 -Es .This contract • Provid and re • Demo • Perfor all me mated • Perfor in pla • Provia Init AIA Dar Section 321313 - Site Concrete Paving Section 321723 - Pavement Markings Division 33.m Utilities, Complete ** As applicable to this scope of work ecifcallyincludes but is not limited to: III sitedemolition and site clearing in accordance with the construction documents. This includes all saw cutting wal of; asphalt, fencing, and vegetation. dremove existing trees as indicated on keynote 4/L1. 1. all cut / fill operations to establish subgrade and bring the site to proper elevations, Provide, place and compact ials as specified. Subgradetolerances shall be as noted in the construction documents (not =0) and excess :appropriately disposed of off --site. cuVflll operations to achieve proper subgrade elevations in lawn and planter areas. Topsoil (6 in lawn areas, 12' xs) will be imported and placed by others. Subgrade elevationsto be+or-.10.' :xcavation and backfill for all building concrete. This includes over excavation and installation of structural fill ce shade shelter concrete. place aggregate base for all buildi 131018W. I n1a 0•Caraenl W9e preUYCee ny AIA EO Were al salla:bU On lllJl2• resale. UserNotes: e slab on grades as indicated by the construction 0)- 1992 and 2009 by The American Institute of Architects. All rights memauonal Treaties. Unauthorized reproduction or distribution of 2. bias, and will be prosecuted to the maximum extent possible under )Ider No.8527595385_1 which expires on 01107/2015. and Is not lot (2018458889) 1 InIL • Provide and place pit run,. aggregate base and asphalt paving per construction documents. Provide patching of existing asphalt as necessary to complete all worknoted in this work package. • ' -Provide striping for all asphalt and concrete paving as indicated Include all painted symbols and stencils. • Provide and install all exterior post and panel signs as noted on the civil drawings (i.e. stop signs, handicap signs). Include excavation, backfill,: concrete footings, pipe post barticades, poles and signs, • Furnish and install all pipe bollards (pipe post barricades) complete as per the details. This includes painting as indicated • Provide excavation andbackfillfor all site concrete. - • Provide and place aggregate base for all site concrete and asphalt paving as indicated by construction documents. • Provide and place all site concrete as indicated on the construction drawings. • Construct gravel: pathways per civil drawings, - - • Provide all labor, material and equipment, to form, place, strip and finish concrete footings, foundation walls, slabs on grade, sidewalks, thickened edges and exterior concrete slabs as shown bn the construction documents. • Provide all labor,: materials and equipment to complete all work associated with the removal and replacement of the Franklin Road pedestrian ramps per GD.7 • Place concrete paving per keynote 5/1,1.1 and civil drawings. • Provide 8" thickened edge at synthetic turf per 3/L1.2 • Install concrete: curb at synthetic turf per keynote 6/Ll.I • Complete concrete work for Owner installed items per "Furnishings Schedule" on Ll.I and LI.2. • Furnish and installtruncated detectable domes in sidewalks as indicated by the construction documents. • Furnish and install all vapor barriers and rigid insulation under slab at restroom building as indicated by the construction documents. • Furnish and install all concrete reinforcing steel and welded wire fabric as indicated by the construction documents. • Provide caulking for all "concrete joints as indicated by the construction documents. • include pumping for concrete in this package as required by site conditions. • Provide all add mixtures and additives for concrete as required and as conditions dictate for your work. • Sawcutting joints as shown in construction documents. • Grinding of concrete slabs as necessary to meet flatness specifications. • Provide concretecontainment and remove offsite all washout concrete and other concrete debris created by this work. • Provide labor and insulated blankets to protect the ground and concrete from freezing as required for your work. • Provide excavation, trenching and backfill for work within this work package. • Furnish and install a complete domestic water service line as indicated in the construction documents. Stub water service line to within 5' of building. • Complete all site utilities indicated. Include drinking fountain service/drain and frost free hydrants complete as detailed • Furnish and install a complete sanitary sewer system for the restroom building as indicated in the construction documents. Stub sewer line to. within 5': of building. • Furnish and install a complete storm drainage system as indicated in the construction documents. • Complete gravity irrigation modifications is indicated on construction documents. This includes, but is not limited to; cast:in place irrigation boxes, expanded metal covers,tiling, and removal of existing pipe materials. • Complete pot holing, marking and CCTV per Keynote 23/GD.2 • Provide and install dewatering systems as required to complete work for this work package. • Furnish and install all concrete related to utility work in this work package. This includes concrete callers. • Provide temporary. power and lighting as required to complete this scope of work. • Maintain, protect and repairexisting surfaces and utilities which are to remain. • Provide and maintain all erosion and control and SWPPP requirements for this scope of work in accordance with the construction documents. Monitor and maintain until final stabilization is in place. This includes street sweeping and dust control as it pertains to thisscopewhile on site. • Contractor to provide all water required to complete work operations under this work. package. • Include all applicable permits and fees required to complete work within this bid package, including R.O.W. permits. • Provide traffic control as required for all work within this work package. • Furnish all survey work required for this work package. Surveyor to be registered in the State of Idaho. • All submittals are due within 10 days of notice to proceed.. • All construction shall follow. OSHA standards and requirements. • Include a $10,000 allowance in the base bid to be used at the sole discretion of the Construction Manager. This contract specifically excludes: • Light pole bases. • Concrete associated with the installation of fences. • Temporary heaters and fuel i Institute of Architects. All rights rized reproduction or distribution of :. 3. P the maximum extent possible under xpfes on 0110712016; and Is not for (2016466699) to • Masomyreller • V2" minus crushed rock under synthetic turf • Landscape rock - 3/3" washed aggregate per detail 4/L1.2 ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION -§ 3.1 The date of commencement of the Work shall be the date ofthis Agreement unless a different date is stated .below or provision. is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date gfcommencement,.ifit difersf oin the date ofthisAgreement or, Ifapplicab/e, state that the date will be f xed in a notice to proceed.) sThe commencement date will be fixed in a notice to proceed. If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as fellows: § 3.2 The Contract Time shall be measured from the dale of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or follows: (Insert number ofcalendor days. Alternatively, a calendar date may be used when coordinated with the date of commencement. Ifappropriate, insert requilementsfor earlier Substantial Completion ofcerlain portions ofthe Work.) The work shall be substantially complete by July 2, 2015. (Table deleted) , subjectto adjustments'ofthis Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time orfor banIis paymen/s for early comp le it an of the Work). In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the Contractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars ($1,000.00). or Y4% of the Contract Value (whichever is greater) for each and every calendar day following the end of the Contract Time until Substantial Completion is achieved; provided that the Contractor shall not be liable for ;liquidated damages for day, or days of the excusabledelayoccurring during such period following the end of the ContractTime. ARTICLE 4 CONTRACT SUM § 4,1 The Owner shalt pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the following: (Check the cppropriate box.) ' [ X ] Stipulated Sum, in accordance with Section 4.2 below [. j.Cost of the Work. plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance ,with Section 4.3below [ ]Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below (Based on the selection above, complete Section 4.2, 4.3 or• 4.4 below. Based on the selection above,also complete either Section 5.1,4, 5.1.5 or 5.1.6 below.) Inti AIA Document A132TM— 2009 trormerly A101-CMa— 19921: Copyright m 1975,1960,1992 and 2009 by The American lns9lute of Architects. All rights reserved. WARNING: This AIA Document Is protected by U.S.Copyright Law and International Trestles. Unauthorized reproduction or distribution of 4 this AIA . Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under / the law. This document was produced by AIA software at 09:15:50 on 12131/2014 under Order No.65275953961. which explies an 01/0712015; and is not for mews. dw UserNoleni - (2016455689) § 4.2Stipulated Sum § 4.2.1 Ile Stipulated Sum shall be Four Hundred Thousand Two Hundred Thirty-three Dollars and Sixty-six Cents ,($ 400,233.66 ), subject to additions and deletions as provided in the Contract Documents. Base Bide $270,772.88 Alternate No. l NOT ACCEPTED Alternate No. 2 $74,387.90 Alternate No. 3 $9,469.00 Alternate No. 4 $18;525.06 Alternate No. 5 $7,289.43 Alternate No.6 $19,789.39 Total Contract Amount $400,233.66 § 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification ofaccepted alternates. Ifthe bidding orproposal documents permit the -Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule grsuch other alternates showing the amount for each and the date when that amount expires.) Alternate No. 2 - Road Connection with Additional Parking: Refer to Sheets 1-1.3, GD.2.2, GD.3.1, and SD. LL Alternate No.3 - Restroom Building: Refer to Sheets Ll. 1, AL1, A2.1, A2.2, A2.3, A3.1, A4.1, MG0.0, MG0.1, M 1.0, M2.0, M3.0, EG0.0, E0.1, El. 1, E1.2, and E2.0. Alternate No.4 - Large Shelters Refer to Sheet Lt.I and Spec Section 107300 Shade Shelters. Alternate No.5 - Synthetic Turf: Refer to Sheet LLI and Spec Section 321813 Synthetic Turf Surfacing. _ Alternate No. 6 — Irrigation Pipeline Replacement: Refer to Sheet GIRRA. § 4.2.3 Unit prices, if any: (/dent f and stale the unit price, and state the quantity limitations, if airy, to which the unit price will be applicable.) Item Units and Limitations Price per Unit ($0.00) § 4.2.4 Allowances included in the Stipulated Sum, if any: (Identify allowance and state exclusions, ifany from the allowance price.) Item Allowance As identified in Article 2 (Paragraphs deleted) (Table deleted) ;. (Paragraphs deleted): (Table deleted) (Paragraphs deleted) (Table deleted) ;(Paragraphs, deleted) ARTICLE 5 '' PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment properly submitted to the Construction Manager by the Contractor,. and ;upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuanceby the Architect, the Owner shall make progress payments on account of the Contract Sum to the, Contractor as provided below. and elsewhere in the Contract Documents. AIA Document A132--2009 formorly A1101-CNLe -1992). Copydght ®1975; 1980, 1992 and 2009 by The American Instate or Archllecls.All rights Init.reserved, WARNING: This AIA Document Is protected by U.S, Copyright Low and International Trestles. Unauthorized reproduction ordlsidbutlon of 5 this AIA` Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by ALA software at 09:15:50 an 12/31/2014 under Order Nm6527595385 1:which expires on 01/07/2015, and la not for 644 resale. User Notes: (2018458889) Init. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an ApplicationforPayment is received by the Construction Manager not later than the Twenty-fifth day of a month, the Owner shall make payment of the certified amount in the Application for Payment to -the Contractor not later than the Twenty-fifth day of the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than ..Thirty ( 30 )days after. the Construction Manager receives the Application for Payment. ` (Federal, state or local laws may require payment within a certain period oftime) § MA Progress Payments Where the Contract Sum is Based on a Stipulated Sum '.§ 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor and approved in writing by the Construction Manager and Architect in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions ofthe Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, when, and only when, approved in writing by the Construction Manager or Architect, shall be used as basis for reviewing the Contractor's Applications for Payment. § 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.4.3 Subject to the provisions of the Contract Documents, the amount ofeach progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share ofthetotal Contract Sum allocated to that portion of the Work in the approved schedule of values, less retainage of Five percent ( 5.00 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions, as modified; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in writing in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Five percept ( 5.001%); .3 Subtract the aggregate of previous payments made by the Owner; .4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions, as modified; and .5 Subtract amounts, if any, being withheld by the Owner or Construction Manager as provided in the Contract Documents. § 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety-five percent ( 95.00 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete or defective Work, or both and unsettled claims; and .2 Add, if finalcompletionofthe Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions, as =.;modified:_ § 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows: -:. (If it is intended, prior to Substantial Completion ofthe entire Worl4 to reduce or limit the retainage resuftingfrom the percentagesinserted in Sections 5.1.4.3.1 and 5.1.4.3.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) No reduction in retainage will be allowedprior to final completion without writtenapproval of the Owner. —6 Init. I (Paragraphs deleted) § 5.1.4.6 A condition will be included forbidding more retainage from a contractor or supplier than retained from their portion of the Work § 5.2 Final Payment §- 5.2.1 _Fina( payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the `Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009 as modified, and to satisfy other. requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A,' Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without aGuaranteed Maximum payment; and .3 - a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such ` final payment shall be made by the Owner not more than 30 days after (1) the Contractor has fully performed the Contract and (2) the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTERESOLUTION § 1.1 Initial Decision' Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009 as modified, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If the parties mutually. agree,insert the name, address and other contact information of the milia! Decision Maker, If other than the Architect.) § 6.2 Binding Dispute Resolution For any Claim subject to; but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009 as modified, the method of binding dispute resolution shall be as follows: (Check the appropriate box. Ifthe Owner and Contractor do not select a method ofbinding dispute resolution below, ' or do not subsequently agree in writing to p binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court ofcompetent jurisdiction.) [ ]'. Arbitration pursuant to Section 15.4 of AIA Document A232-2009. [ X'] Litigation in a court of competent jurisdiction. [ ] other: (Specify) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009 as modified. § 7.1.2 The Work maybe suspended by the Owner as provided in Article 14 of AIA Document A232-2009 as modified. (Paragraphs deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 as modified or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the - Contract Documents. -§ 8.2 Payments due and. unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, .at the legal rate prevailing from time to time at the place where the Project is located. User Notes: 77¢ { tmraaaeseer (Insert rate of interest agreed upon, if any.) 3/4 of 1% per month -.§ 6.3 The Owner's representative: (Name, address and other tllformation) Keith Watts, Purchasing Manager City of Meridian Purchasing Department 33 East Broadway Avenue. Meridian, Idaho 83642 ` §; 8.4 The Contractor's representative: (Name, address and other information) Justin King` Telephone Number: 208-853-1720 Mobile Number: 208-602-8125 Email Address jking©altaedge,com §: 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party.' §h 8.6 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued atter execution of this Agreement, are enumerated in the sections below. §'_ 9.1.1 The Agreement is this executed AIA Document A132-2009 as modified, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. -§ :9.1.2 The General Conditions are, AIA Document A232-2009 as modified, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages Exhibit A Contract Document Schedule 12/22/2014 2 § 9.1.4 The, Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement) Title of Specifications exhibit: Contract Document Schedule, Exhibit A, dated December 22, 2014 (Table deleted) § 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: Contract Document Schedule, Exhibit A, dated December 22, 2014 (Table deleted) §`9.1.6 The Addenda, if any: Number Date Pages One 12/15/2014 2 AIA Document Arm 132TM — 2009 foerly A101-CMa —1992). Copyright D 1975, 1980, 1992 end 2009 by The American Insfitule of Architects. All rights Init reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and Inlemational Treaties. Unauthorizedreproduction or distribution of th1sAIA! Document, or any portion of It may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under 1 the law. This document was produced by AIA software at 09:15:50 on 1213112014 under Order No,65275953851 which expires on 011072015,endisnotfor- resile. User Notes (2018456989) Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents are: .1 AIA Document Al32Tm-2009, Exhibit A, Determination of the Cost of the Work, if applicable. .2 ALA Document E20 IT" 2007, Digital Data Protocol Exhibit, if completed, or the following: N/A .3 AIA Document E202T" 2008, Building Information Modeling Protocol Exhibit, if completed, or the following: N/A .4 Other documents, if any, listed below: (List here any additional documents which are intended to form part of the Contract Documents. AIA Document A232-2009 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) All binding documents including the Invitation to Bid, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Proposal Forms, and the Project Schedule are intended to be part of the Contract Documents. AIA Document A232-2009 General Conditions Exhibit A, Contract Document Schedule dated 12/22/2014 ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A232-2009 as modified Refer to Supplemental Conditions modifying ATA Document A232-2009 for changes and additions to Article I I "Insurance and Bonds". Contractor is required to provide 100% Payment and Performance Bonds. (State bonding requirements, if any, and limits of liabilityfor insurance required in Article 11 of AIA Document A232-2009.) Type of Insurance or Bond Limit of Liability or Bond Amount ($0.00) This Agreement is entered into as of the day and year first written above. OWNER (Sign COR ignature) Tammy de Weerd , Mayor exfv- 14117+aAsaLl rraescbercr (Printed name and title) (Printed name and title) AIA Document A132-- 2009 formerly A101T"CMa-1992). Copyright®1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 9 this AIA® Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software at 09:15:50 on 1 213112 01 4 under Order No.6527595385 1 which expires on 0110 712 01 5, and is not for / , resale. V User Notes: (2018456(189) CONTRACT DOCUMENT SCHEDULE (EXHIBIT A) City of Meridian Storey Park Development 430 E Watertower Street Meridian, Idaho 83642 KC PROJECT NO. 14-085 December 22, 2014 PROJECT DOCUMENTS as issued by Insight Architects, P.A. and prepared by the following project team: Architect — Insight Architects, P.A. Structural Engineer—AHJ Engineers, PC Civil Engineer— Erickson Civil Landscape Architect - Jensen Belts Associates Mechanical Engineer—Musgrove Engineering, P.A. Electrical Engineer—Musgrove Engineering, PA. Construction Manager —Kreizenback Constructors PROJECT MANUALS Instructions to Bidders, Complete — Dated November 21, 2014 Project Manual, Complete— Dated November 21, 2014 ADDENDUMS Addendum No. One — Dated December 15, 2014 DRAWINGS— Dated November 21, 2014 A.01 Cover Sheet Civil C1.0 Cover Sheet CIA Notes - C1.2 Topographic Survey GD.0 Overall Grading Plan & Earthwork Req. GDA Grading Plan — Areal GD.2.0 .Grading &Drainage Plan — Area 2 .&Drainage GD.2.1 Grading & Dral nage Plan -Area 2 (Alt #1) GD.2,2 Grading & Drainage Plan -Area 2 (Alt #2) GO.3.0 Section Views (Base Bid) GD.3.1 Section Views (All #1 V Alt #2) GD.3.2 Internal Pathway Alignments GD.3.3 Internal Pathway Profiles -1 GD.3.4 Internal Pathway Profiles -2 GDA Roadway. Profile & Details —1 GD.5 Details -2 GDA Details -3 SDA Storm Drain Bass Bid & All #1) SDA A Storm Drain (Alt #2) SD.2 Storm Drain Details - l SD.3 Storm Drain Detalls-2 GIRRA Gravity Irrigation (Alt #B) UTA Utility Plan SPA SWPPP—Cover Sheet SP.2 SWPPP Plan Sheet SP.3 SWPPP-Details Landscape; 11.1 - Site Plan — Areal L1.2 Site Plan — Area 2 L1.3 Site Plan—Area 2 L2.1 Landscape Pian—Area 1 L2.2 Landscape Plan — Area 2 12.3 Landscape Plan —Area 2 L3.1 Irrigation Plan —Area 1 L3.2 Irrigation Plan—Area 2 L3.3 Irrigation Plan — Area 2 Architectural A1.1 Floor Plan, Roof Plan, Roof Framing Plan, Reflected Calling Plan, Foundation Plan A2.1 - BuIldingSedlons,.Detalls A2.2 Details A2:3 Details A3.1 Exterior Elevations, Interior Elevations A4.1 General Structural Notes/ Schedules Mechanical MG0.0 Mechanical Cover Sheet M1.0 Mechanical Plans M3.0Mechanical Schedules Storey Park Development MG0.1 Energy. Code Compliance M2.0 Mechanical Details Page 1 of 2 December 22, 2014 e Electrical EG0.0 Electrical Cover. Sheet & Details EG1.0 E1.1 Electrical Site Plan — Areal E1.2 E2.0 Electrical Plans & Schedules Storey Park Development Page 2 of 2 Lighting Compliance Forms Electrical Site Plan—Area 2 December 22, 2014 MI