Loading...
HomeMy WebLinkAbout2014-12-09C�VER,IDIAN CITY COUNCIL WORKSHOP MEETING AGENDA City Council Chambers 33 East Broadway Avenue Meridian, Idaho Tuesday, December 09, 2014 at 3:00 PM 1 2. 3 Roll -Call Attendance X David Zaremba O Charlie Rountree X Genesis Milam Pledge of Allegiance X Joe Borton X Keith Bird X Luke Cavener X Mayor Tammy de Weerd Adoption of the Agenda Adopted 4. Consent Agenda Approved A. Approve Minutes of November 25, 2014 City Council Meeting B. Approve Minutes of December 2, 2014 City Council Meeting C. Findings of Fact, Conclusions of Law for Approval: AZ 14-011 Jump Creek by Northside Management Located Northwest Corner of N. Black Cat Road and W. McMillan Road Request: Annexation of Approximately 86.06 Acres from RUT in Ada County to the R-8 (Medium Density Residential) (64.63 Acres) and R-15 (Medium High -Density Residential) (21.43 Acres) Zoning Districts D. Findings of Fact, Conclusions of Law for Approval: PP 14-013 Jump Creek Located Northwest Corner of N. Black Cat Road and W. McMillan Request: Preliminary Plat Approval Consisting of 318 Single Family Residential Lots, 2 Multi -Family Lots and 42 Common Lots on Approximately 85.9 Acres in the Proposed R-8 and R-15 Zoning Districts E. First Addendum to Ada County Highway District (ACHD) Interagency License Agreement F. Resolution No. 14-1035: A Resolution Approving an Extension of the Lease Agreement Between the City of Meridian (Lessor) and Congressman Raul Labrador (Lessee) for a Two Year Lease Term Extension for Approximately 1,812 Square Feet of Office Space at the Meridian City Hall, 33 East Meridian City Council Meeting Agenda — Tuesday, December 09, 2014 Page 1 of 3 All materials presented at public meetings shall become property of the City of Meridian. Anyone desiring accommodation for disabilities related to documents and/or hearing, please contact the City Clerk's Office at 888-4433 at least 48 hours prior to the public meeting. I ►I n E Broadway, Meridian, Idaho to be used for a Local Congressional Staff Office. G. FY2014 Community Development Block Grant Funding Approval Agreement Community Items/Presentations A. Idaho Smart Growth presentation: City Areas of Impact and Annexation B. Finance Department: Utility Billing Software Replacement Items Moved From Consent Agenda None Action Items A. Public Hearing: Proposed Winter 2014-2015 Fee Schedule of the Meridian Parks and Recreation Department B. Resolution No. 14-1036: A Resolution Adopting the Winter 2014-2015 Fee Schedule of the Meridian Parks and Recreation Department; Authorizing the Meridian Parks and Recreation Department to Collect Such Fees; and Providing an Effective Date Approved Department Reports A. Information Services Department: Department Update B. Fire Department Report: Compliance Engine C. Public Comment: Compliance Engine — Web Based Reporting Software D. Public Works: Meridian Floodplain Administration & Community Rating System (CRS) E. Meridian Parks and Recreation Department: Rail With Trail Arterial Crossing Design Study Presentation by Project Engineering Consultants (PEC) F. City Council Liaison/Committee Updates Ordinances A. Ordinance No. 14-1634: An Ordinance (RZ 13-010 — Three Corners Subdivision) For The Re -Zone Of A Three Parcels Of Land Located In The NW 1/40f The NW 1/40f Section 29, Township 4 North, Range 1 East, Boise Meridian City Council Meeting Agenda — Tuesday, December 09, 2014 Page 2 of 3 All materials presented at public meetings shall become property of the City of Meridian. Anyone desiring accommodation for disabilities related to documents and/or hearing, please contact the City Clerk's Office at 888-4433 at least 48 hours prior to the public meeting. Meridian; Establishing And Determining The Land Use Zoning Classification Of C -C (Community Business District), R-4 (Low Density Residential), And R-8 (Medium Density Residential) Zoning Districts In The Meridian City Code; And Providing An Effective Date Approved 10. Future Meeting Topics Adjourned at 5:52 p.m. Meridian City Council Meeting Agenda — Tuesday, December 09, 2014 Page 3 of 3 All materials presented at public meetings shall become property of the City of Meridian. Anyone desiring accommodation for disabilities related to documents and/or hearing, please contact the City Clerk's Office at 888-4433 at least 48 hours prior to the public meeting. Meridian City Council Workshop December 9, 2014 A meeting of the Meridian City Council was called to order at 3:03 p.m., Tuesday, December 9, 2014, by President Charlie Rountree. Members Present: Mayor Tammy de Weerd, Keith Bird, David Zaremba Joe Borton, Genesis Milam and Luke Cavener. Members Absent: Charlie Rountree. Others Present: Bill Nary, Jaycee Holman, Bruce Chatterton, Caleb Hood, Warren Stewart, Jeff Lavey, Mark Niemeyer, Perry Palmer, Jay Gibbons, and Dean Willis. Item 1: Roll -call Attendance: Roll call. X David Zaremba X Joe Borton Charlie Rountree X Keith Bird X Genesis Milam _X_ Lucas Cavener X Mayor Tammy de Weerd De Weerd: Okay. I will go ahead and call our meeting to order. Thank you so much for joining us today and I'd like to make a special welcome to Council Woman Clegg. It's always nice to see one of our neighboring city elected officials at our meetings. So, thank you for joining us. For the record it is Tuesday, December 9th. It's a few minutes after 3:00. We will start with roll call attendance, Madam Clerk. Item 2: Pledge of Allegiance De Weerd: Thank you. Item No. 2 is the Pledge of Allegiance. If you will all rise and join us in the pledge to our flag. (Pledge of Allegiance recited.) Item 3: Adoption of the Agenda De Weerd: Item No. 3 is adoption of the agenda. Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: On Item 4-F, the resolution -- proposed resolution number is 14-1035. We have been requested to move Item 8-A up to 5-A-2, right behind 5-A. Under 7-13 the proposed resolution is 14-1036. And under 9-A, the ordinance proposed resolution -- Ordinance number is 14-1642 and with that I move we approve the agenda as amended. Meridian City Council Workshop December 9, 2014 Page 2 of 52 Zaremba: Second. De Weerd: I have a motion and a second to adopt the agenda as amended and for the record Councilman Borton joined us. So, Council, all those in favor say aye. Any opposed? MOTION CARRIED: FIVE AYES. ONE ABSENT. Item 4: Consent Agenda A. Approve Minutes of November 25, 2014 City Council Meeting B. Approve Minutes of December 2, 2014 City Council Meeting C. Findings of Fact, Conclusions of Law for Approval: AZ 14-011 Jump Creek by Northside Management Located Northwest Corner of N. Black Cat Road and W. McMillan Road Request: Annexation of Approximately 86.06 Acres from RUT in Ada' County to the R-8 (Medium Density Residential) (64.63 Acres) and R-15 (Medium High -Density Residential) (21.43 Acres) Zoning Districts D. Findings of Fact, Conclusions of Law for Approval: PP 14-013 Jump Creek Located Northwest Corner of N. Black Cat Road and W. McMillan Request: Preliminary Plat Approval Consisting of 318 Single Family Residential Lots, 2 Multi -Family Lots and 42 Common Lots on Approximately 85.9 Acres in the Proposed R-8 and R-15 Zoning Districts E. First Addendum to Ada County Highway District (ACHD) Interagency License Agreement F. Resolution No. 14-1035: A Resolution Approving an Extension of the Lease Agreement Between the City of Meridian (Lessor) and Congressman Raul Labrador (Lessee) for a Two Year Lease Term Extension for Approximately 1,812 Square Feet of Office Space at the Meridian City Hall, 33 East Broadway, Meridian, Idaho to be used for a Local Congressional Staff Office. G. FY2014 Community Development Block Grant Funding Approval Agreement De Weerd: Item 4 is our Consent Agenda. Meridian City Council Workshop December 9, 2014 Page 3 of 52 Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: As stated earlier, Item 4-F, the resolution number is 14-1035 and with that I move we approve the Consent Agenda as published and for the Mayor to sign and the clerk to attest. Zaremba: Second. De Weerd: I have a motion and a second to approve the Consent Agenda as read. Madam Clerk, will you call roll. Roll Call: Bird, yea; Rountree, absent; Zaremba, yea; Borton, yea; Milam, yea; Cavener, yea. De Weerd: All ayes. Motion carried. MOTION CARRIED: FIVE AYES. ONE ABSENT. Item 5: Community Items/Presentations A. Idaho Smart Growth presentation: City Areas of Impact and Annexation De Weerd: Item 5-A under Community Presentation is a presentation by Idaho Smart Growth and would welcome Council Woman Clegg to the stand. Clegg: Thank you. Well, thank you for inviting me today and -- can you hear if me I -- if I do this? Okay. Council Member Zaremba asked if I could come today and talk to you about the area of city impact study and tool kit that Idaho Smart Growth produced a few years ago. I know that you all have been struggling with area of city impact boundary dispute with one of your neighbors and if it's any consolation, you're not the only one around the state. However, having said that, there is -- there is varying issues around the state. Some mirroring yours and some different. But, first of all, I'd like to just introduce the area of city impact study and tool kit that Idaho Smart Growth worked on a few years ago. So, in 2010 Idaho Smart Growth -- actually, in 2009 Idaho Smart Growth partnered with the University of Idaho and ULI and APA Idaho and some others on developing an analysis of the Local Land Use Planning Act and out of that analysis it became pretty clear that one of the things in the act that wasn't working as intended or working as well as -- as people hoped was the area of city impact and the process around it. So, Idaho Smart Growth followed up on the initial analysis by putting together another team of partners to specifically look at that area of city impact with a survey and some focus groups and some analysis beyond the Comprehensive Plan that we had already analyzed and look at how urban policy areas could better work. So, that second group -- folks that were at the table were pretty broad, you know, this is work that we know needs to have a broad look if Meridian City Council Workshop December 9, 2014 Page 4 of 52 you're going to find consensus positions that might work for everyone. We included Gem county, because they have kind of an interesting situation over there. I don't know if you all are familiar with it, but they have a planner who works for both the city of Emmett and the county. Brad job shares, essentially, between the two and because of that unique position they have a process and a relationship that's a little bit closer and less contentious than some. Kind of hard to fight with yourself. Zaremba: I would comment that he's a former planning and zoning employee of the City of Meridian -- Clegg: That's right. Zaremba: -- before he went onto that position. Very fine man. Clegg: Yeah. So, anyway, Brad -- Brad was a great resource. So, what this second analysis looked at was both the Idaho Land Use Planning Act, but also the annexation laws around it and, of course, you all know that areas of city impact are supposed to be established through trade areas, geographic factors and areas that can reasonably expect to be annexed in the city in the future. What you will notice this doesn't say is anything about providing services and as we did our analysis that factor became more apparent. So, why is this important? I'm probably preaching to the choir here. You guys know it. But it's important because we have got -- most cities in the state are surrounded by farmland. That farmland itself is a valuable resource. In many cases the farmland is developed in ways or in places where maybe it doesn't need to be and we could keep that productive resource and also have the houses. In other cases there is little thought given to the folks who are left who are continuing to farm or use their lands productively and the impact it has on them to have nearby residents. You all know that providing services for these areas is an expensive deal. Planning for providing those services is an expensive deal and it probably won't surprise you that what we found was that especially sewer service is one of those things that ends up becoming a bone of contention and ends up becoming an investment that someone has made that they think they need to recoup on in order to make it worthwhile, which is true, but without -- without joint planning, then, those areas become disputed and I think that's what you're facing. We also know it's important to plan for orderly growth, so that our citizens have a good quality of life, have a place where people can get around safely and where destinations are near enough by that we don't create more traffic congestion, more air quality problems. So, for all of these reasons areas of city impact are important. So, what did we do? Well, we looked at the frame of the code that says encourage urban and urban type development to occur within incorporated cities. We see across the state that in some cases that's not happening. We compiled examples in a database of areas of city impact agreements. We began that work and, then, the University of Idaho law school took it over, the third year students that are here in Boise, and I -- I didn't include the link to that study, but if you go on Idaho Smart Growth's site there is a link to the study of all of the area of city impact agreements that they looked at. We also identified some policy outcomes that we think are important and, again, this was through surreys and focus groups and a look at all of those AOI agreements. So, providing predictability to landowners in relation to future growth and Meridian City Council Workshop December 9, 2014 Page 5 of 52 timing and location of that growth is certainly an important factor. Urban growth should occur where city services are available to be provided. The cost of services, if -- you know, if growth happens in places where it wasn't originally planned for it's probably not going to be very sustainable from a cost benefit analysis. If done well and done right we found that area of city impact agreements can act as a disincentive for development in unincorporated areas and have development occur in a more orderly way only within incorporated areas and we can better align land use and transportation planning, as well as other service provision planning. There is more accountability and consistency between regional and city plans and you can protect important resources like agriculture on critical lands. One of the things that we identified really needs some work is the responsibilities for planning and decision making in AOI's, which is not very clear today and needs to be clarified. And, then, finally, preservation of agricultural land came up again and again, so we pulled it out as a final thing. This -- none of this is news to you, but maybe it helps to know that you're not the only one. So, what did we hear? We heard that the majority feel state law is not adequate in its intent or direction to cities and counties. So, again, no surprises, but, you know, you're not -- you're in the same boat with a lot of other folks. That process is filled with a lot of conflict for a lot of jurisdictions. I don't know how these ended up out of order. Sorry. There is a lot of issues and tensions around area of city impact and especially around annexation. There is a wide range of how -- how expansions are planned around the state. The majority felt that annexation shouldn't happen outside areas of city impact, although that's happening. It's important to include affected land owners in the decision making process and if we can find agreement that developed -- urban development belongs in cities and it's helpful for planning overall and, then, finally, areas of city impact should be based on the ability to provide services within a realistic time frame. So, we talked about sewer and often sewer becomes a contentious thing and the reason that people abrogate area of city impact boundaries and this has happened in various ways across the state. What isn't real clear is the other service provisions. So, I'm going to give you some examples of what's happening in other places how that's being affected. First I will talk about some of the options that we came up with for how to impact this. We believe there should be a review of the Local Land Use Planning Act for any potential changes, clarification, examine, maybe, for instance, what should go into the area of city impact criteria beyond those three that we talked about. At APA Idaho this year there was a broad agreement among the groups who came to the session on this that, in fact, that was something we should do and they are interested in pursuing some kind of a process to do that over the next year or so. We also felt like it was important to compile the cost of community services data and any fiscal impact analysis that's been done across the state and see if there is anything there to be gained that would inform how to make these decisions and I will get back to that in just a minute about how that might help you. Sorry. And, then, finally, review annexation laws for any potential changes and clarification. I think that's in part why I'm here today, because you all have determined that maybe that's -- that's the place that you would like to go first and, who knows, maybe that's possible. So, hopefully, this is clear enough that you can see it. This is Idaho Falls. Idaho Falls and Ammon, Iona, Ucon, Lincoln are all surrounded by Bonneville county. Bonneville county has its own sewer system, which is pretty unusual around the state, but because it has its own sewer system it has been approving development outside of city limits in many places where the cities Meridian City Council Workshop December 9, 2014 Page 6 of 52 weren't ready to provide services yet. Well, Bonneville county doesn't have water service, they don't have police service, although they have a sheriffs department, we know that they are probably using city taxpayer dollars to help service the sheriffs department to serve these areas. They don't have a library system. The fire service is somewhat spotty depending on what district it's in and so while they are able to provide sewer service, the rest of what you consider municipal services are particularly available, at least as a package. So, as a result the areas in gray, as you see them here, are the southwestern boundary of Idaho Falls. Everything in gray is inside the city limits. The green line is the area of city impact boundary and everything in red is -- has approved development by the county on it. Now, the county would like to see Idaho Falls go ahead and annex the lands that they have already approved for development and if you follow southwest Boise you know how difficult that has been. Bonneville county is also unwilling to talk to Idaho Falls about expanding its area of city impact boundary and, in fact, would like to do a trunk, so that they can provide even more of the sewer service and yet the sewer itself is proving not to be very sustainable, because they have to extend lines so far that the fees that they are charging, which has now been capped, are really unable to keep up with the long-term maintenance needs on those lines. So, Idaho Falls is feeling really boxed in and, frankly, right now are annexing outside of their area of city impact boundary, because those are the lands that make the most sense for them to annex. So, any change in the law that would prohibit them from doing that would make it very difficult for them to respond in any sensible way to the conditions that they are facing right now. They feel like that would be a really -- really tough thing for them. The county -- they had a dispute, if you look on their eastern boundary, with Ammon, at one time they did ultimately figure out a solution to that short of going to court, but it came very close to that. They ended up with an agreement that they are both willing to abide by and they have since. Go to another B county, Bonner county way up north, we have a little bit different situation. So, we have the cities of Sandpoint, Dover, and Pend Orielle, Kootenai all side by side. The bottom slide with the red lines is the area of city impact boundaries. The city of Dover only has 549 people. If you look at the area that it encompasses compared to the area of the city of Sandpoint, which has about 7,000 people, you can see that it is pretty sparsely populated and almost none of it has urban services. Dover annexed much of this in an attempt to stop Sandpoint from growing to the west and ultimately Sandpoint did take them to court and ultimately the judge did order mediation. They were able to come to an agreement that at least they have both been able to live with it. It's not a great agreement, but all of them tell me that it's better than what they had previously, which was no agreement and everybody just annexing willy-nilly to try and get the -- their foot in the door first. I'm not suggesting that litigation is the best solution, but it is a solution that's been tried in Idaho. It did ultimately work and at least for now the -- the cities there, instead of fighting each other, have decided to band together and go to the county collectively and try to come up with some more sensible area of city impact boundaries that they can all jointly agree on. So, it was a long, contentious process. Ultimately it's -- it's led to them cooperating more closely than they did previously. So, now we have area -- and I -- if I have this wrongly outlined I apologize. I tried to call Bruce today. I think I have it about right and so I wasn't able to double-check it. But here is the area that you guys have in dispute with Kuna -- at least one of the waterways that runs through it in blue. I know there is at least one more waterway that runs through it. I wasn't sure which one you were all talking about for Meridian City Council Workshop December 9, 2014 Page 7 of 52 potentially using as a boundary. So, I guess I'd like to suggest that while changes to the annexation law at the state level might solve your problem in the short term, it might have unintended consequences for some other folks and I'm not sure will solve everybody's problem in the long term. I think long term we are going to have to have this larger conversation statewide, at least that's, you know, from everything -- everyone we have talked to that's probably the solution, see if we can come to some consensus changes potentially in the annexation chapter that you all have focused on, but also potentially in the local land use chapter and in the criteria that goes into creating an area of city impact boundary. In the short term I guess, you know, what's the way forward for you? I think you have some choices. One of the things I know you use as an impact analysis tool -- and I wonder if there is maybe a potential if there would be agreement on Kuna's part to use it -- to use that tool to do an analysis of that disputed area, do some scenarios assigning various parts of it either way and see what the outcome is and see if that would help inform anybody and make for a better decision. I -- you know, again, I don't know, but I'm just suggesting that might be a path forward. Mediation, if there is a way to come to mediation short of court would be I think a great solution if -- if Kuna would -- would agree to it. Of course you could go the route of Sandpoint. I don't know if that's a great solution, but -- but also that there was an example of that having happened in the state and changes to the annexation law. I think, you know, those are rightly on the table. You should be thinking about ways to protect your own investments, recognize that those changes at least right now are not widely supported across the state and may likely have some opposition. Don't know for sure. And, then, finally, offer that ultimately over the long term, if you use the tool kit that you receive, Idaho and ISG and ULI develop together or some other method to come to a broader, longer term conversation with both the county and Kuna and yourself, ultimately maybe Boise and Eagle as part of that, you know, maybe -- maybe that's a better longer term solution. So, you know, I don't know that there is a lot of new information here, but maybe information that at least gets you thinking in ways that potentially you hadn't been thinking so far. With that I would stand for questions. De Weerd: Thank you, Elaine. Any questions from Council? Cavener: Madam Mayor? Zaremba: Madam Mayor? De Weerd: Mr. Cavener. Cavener: Elaine, you have mentioned a suggestion or maybe alluded to that it's going to take a lot of municipalities across the state to come together to discuss this. What's that trigger point going to be to get people to come together to talk bit it? I mean you have provided here some great examples that I would say, boy, that seems to be the reason we all need to get together and yet it hasn't happened and so I'm curious, based on your expertise, why has this not happened and what's it going to take before we are willing to get together and talk about it? Meridian City Council Workshop December 9, 2014 Page 8 of 52 Clegg: Well, I would say it's been bubbling on the back burner. The surveys that we did in 2010 and 2011 we heard a lot of what I shared with you and, frankly, your action to bring forward say proposed changes in law is getting a lot of attention. I think that's a good thing, because I think that attention ultimately might lead to this process. I would also say that over the last two years, after we finished this tool kit Idaho Smart Growth and ULI and University of Idaho have offered presentations at the Association of Idaho Cities, at the Idaho Association of Counties and APA Idaho at ULI and in each of those forums the consensus was that we needed a process to come together and see if we could find a solution. I think part of what it will take to make that happen is especially AIC and the IAC making a commitment to it and making sure that it does happen. But I would say absent the other groups and absent the realtors and absent the building contractors, it's probably not likely to be successful. So, it's not short term. I think that's the other thing, it's a big undertaking and I think, you know, people rightly know that and they are, oh, boy, do I have to do this. I think -- personally I think we are at a point where we have to do it and I think our -- over the last week I have talked to six other counties and municipalities trying to gather information for this and I would say all six of them would agree that we are at the point we need to do it. Cavener: Thank you. De Weerd: Mr. Zaremba. Zaremba: Thank you. And thank you for the presentation. I -- I did learn some things from it. Clegg: Well, good Zaremba: I think one of the objections that I have heard to making any changes to the current law stem around what if one city is more ready to expand than another city is and let's say the residents that are in between -- if somebody wanted to develop property into houses or commercial instead of agriculture, this city is almost there and this city isn't -- Clegg: Yeah. Zaremba: -- almost there and they may be in the impact area of the city that's two miles away and they are saying the way the law currently is they can annex into either city and, therefore, would annex into the one that is closer to them -- has grown closer to them and I don't know if -- just throwing that out -- are there any ideas of how we could help fix that? To me it comes down to agreement between the two cities and can they talk. The law probably has to force that somehow, so -- Clegg: The conversations that I heard in those presentations I have given at the conference especially do -- do center around finding a mechanism and criteria that we find consensus around and from that point really putting some teeth in the law, so that once an area of city impact is established it means something. That that adjoining jurisdiction can't, like Kuna is going today or like Dover did previously or like Ammon at Meridian City Council Workshop December 9, 2014 Page 9 of 52 some point did. So, oh, yeah, we are ready, go ahead. Come our direction. And, you know, there is no -- I'm not trying to cast blame onto anybody, it's just, like you said, they are there and they have got their service provision and they think everything is good, but they haven't done as has to happen when you do an area of city impact agreement, they haven't done the bigger analysis of whether they can provide others services, whether it makes sense long term to provide the maintenance of the extension about a particular service, whatever it is, and other services as well and so to me the changes, at least from what I have heard, would be to agree to some realistic, more detailed criteria than what we have today and, then, put some teeth in the agreements once they are reached, so that, you know, that scenario doesn't play out. No. The mechanisms of how this can happen -- you know, those would remain to be seen right now. You know, the group of nine is not working, so there has to be some ultimate decision making body -- maybe it's the county, maybe it's a mediation process first, maybe it's -- you know, in the cases where there have been long term disputes that finally got worked out, the mediation was -- with respect if you don't decide somebody else is going to was finally what made it happen. Zaremba: Madam Mayor? De Weerd: Yes. Zaremba: And in kind of a sideways question to that, if you are -- if two cities are able to work it out and with agreement from the county, does anybody ever discuss that if a city that is giving up area of impact to another city let's say, has invested resources -- and certainly they have invested planning resources, but if they have bought property to put a future water tank on or bought property to put a future fire station in the area that they are giving up, is there any discussion of compensation or -- Clegg: You know, the discussions I have heard they haven't gotten that detailed. I would say that is certainly part of the discussion in the disputed Sandpoint -- what about the investments we have already made, what about, you know, all of that stuff and I honestly don't know the answer to how they came to a conclusion on that. I would say other than stuff that's in the ground -- you know, if you have got sewer pipe in the ground it's pretty hard to divest yourself of that, but if you have got land you can at least divest that by selling it. So, you know, I -- that's a great question. It's part of what I think needs to be on the table as you figure out what the criteria are. You know, many folks have talked about the criteria also including some analysis of critical land, some analysis of economic productivity, the existing working land, some analysis that would better inform -- does it make sense to urbanize this area or is this area better left unurbanized and if it is better left unurbanized where does it make sense to urbanize. You know, much more involvement than what we have today. You know, one thing I didn't get into -- when the Local Land Use Planning Act was passed in Idaho in 1975 it was accompanied by two other bills and those two other bills were supposed to implement it. It included an office of state planning and it included some resources for -- in the public works realm to help cities and counties make -- make the Local Land Use Planning Act actually work. Well, you know, true to form Idaho passed the act, but they didn't pass the implementing statutes Meridian City Council Workshop December 9, 2014 Page 10 of 52 and so we are left with an act that doesn't offer any technical assistance, doesn't offer any real enforcement mechanism, and it is a shortcoming and I think like Council Member Cavener alluded to, it's -- you know, what -- when does it become time to actually deal with it and I guess maybe now is the time. Hopefully. You know, whether the act that you guys are proposing goes through or not, I think -- you know, I think it's raised enough -- raised this issue enough that it's got a lot of attention, so -- I don't know if that's helpful. Zaremba: Thank you. De Weerd: Any other questions or comments? Clegg: Well, thank you. I appreciate the opportunity to come and let you know -- Idaho Smart Growth, regardless of what happens here, is going to continue to pursue ULI and APA Idaho and AIC, IAC some kind of a process, so we will be sure and keep you informed if we get anywhere with that. De Weerd: Okay. Thank you, Elaine. Clegg: You bet. Thank you. A. Information Services Department: Department Update De Weerd: Okay. We moved Item 8-A under Item 5-A, which is our Information Services Department update. Holman: Madam Mayor, Members of the Council, this is our Information Services annual department update. Services being the key word in the name our department and -- so, that's mainly what we do is provide support services to Mayor and Council, the rest of the city departments and the general public also. So, we are divided into the clerk's office, so we provide support to all of you and also through our licensing and public records requests and other things to the public. Information Technology is split into two different divisions being the network infrastructure and, then, the software engineering. So, what I have decided to do this year -- and now I'm really glad I did, because I have a bad head cold and starting on a cough, is each one of the managers of those divisions is going to present what they have worked on this last year, their accomplishments, some statistics and, then, what project they have looking ahead for next year and, then, I will wrap up the end of our presentation. So, we will start off with the IT side of things with David Tiede. De Weerd: Thank you. Hi, David. Thank you for joining us. Tiede: Absolutely. Glad to be here, Madam Mayor, Members of the Council. To get started, just to kind of give you a quick overview of my staff. We have Stephanie, who is our administrative assistant in IT. She handles purchasing, inventory, everything else you can think of in the office for us. Does a great job. Jamie Beehn is one of our support specialists. He handles MDC support, layer -- or level two support, so if it can't be addressed over the phone typically he's your guy, he's out in the field, he's on site, Meridian City Council Workshop December 9, 2014 Page 11 of 52 whatnot. Eli Daniel is also a support specialist. He joined us this last year. Does kind of the same role as Jamie. Chad Neal is our systems administrator. He handles the infrastructure side and that includes servers, storage, network, wireless, you name it. Krystal Goodman is our support technician. She is kind of the front line of support. Our help desk. Answers all the calls we get. Cases usually get passed to her. And, then, Kristy Vigil recently joined our team as our system analyst and she is helping with our Accella implementation and doing business analysis for things moving forward. So, this is kind of a snapshot of what we do. You guys probably saw this last year as well. A wide gamut of those things that we take care of. All services to the city. This is some of the statistics we have had in the last year for FY -2014. We have handled over 3,200 help desk calls. Dealt with almost 4,000 cases, which were submitted through our case management system. Processed nearly 400 purchases of technology -related items and that also includes 400 POs and 200 internal invoices, which are us billing back to the departments if we buy the item. Our big project last year was the fiber project, which you're all aware of. As you can see here, this is what we have in place now today. This is just a map of the city facilities that we have. Fire Station Six on there, obviously, but we do not have connectivity there, it just runs through that. We have redundancy up and running over the existing wireless infrastructure. It's a backup to the system. It's spills over pretty seamlessly. It's literally something we can do remotely. It takes a couple minutes if that. We also have redundancy built in, so that if we have a hardware failure somewhere in the network it will automatically spill over, so -- this will enable us to do a lot of other things down the road. Obviously, it's a lot more redundant and scalable than what we had. Some of the projects that you will be seeing here in a few minutes are actually due to us having this up. So, some of the projects we are working on are continuing to expand our Shore Tel system, which, again, goes hand in hand with the fiber project that will enable us to do that. We have been spending a lot of time on supporting new buildings coming up, so that's another project we are working on and, then, also our backup replacement. So, I will go into that in a little more detail in each of those. So, obviously, throughout the city we have varying phone systems. Usually those were put in when the building was put in. Quite a few of them are outdated and costly to support, so as we have the fiber network we have continued to expand when we put in this building and the police department and used those pooled resources. That allows us to reduce some of the costs with existing regular telephone lines that we pay a monthly fee. We are able to lump those together and reduce the cost of that. It also helps us reduce the cost of maintenance that we pay to a third party. So, good things. There is also efficiencies that we gain -- or the departments gain from being on a modern phone system. They can dial by extension across facilities and whatnot and we also have been testing out conferencing, which is a new feature that we have added on here recently, which has been pretty useful. Our -- we have started deploying at wastewater and the new admin building. We plan to expand out there as well. The water department here will be installed within the next month or so and, then, the fire stations are next to come online with the system, so -- going into a little bit more detail about our supporting new buildings, we have been involved with quite a few of the buildings you see up here, of course. With wastewater we are involved with selecting equipment, helping design some of the areas that needed infrastructure, closets, rooms for equipment, whatnot and that includes the admin building and the lab building and the office and also, which I forgot to add on here, Meridian City Council Workshop December 9, 2014 Page 12 of 52 the new maintenance building. So, keeping us busy. We also have expanded -- added wireless out at the wastewater division as part of continuing to expend -- add the network equipment and whatnot that's needed. We have been involved with the police remodel and dealing with a new server room that they are adding on, partially to support us and partially for their needs. So, that's been fantastic. It's moving along right now. We -- the room is pretty much built. They are putting racks in. Obviously, there is a new cooling system and other things that go into that as well. We have some new equipment that we will be installing as well there. I forgot to change the slide. It's supposed to say public safety training facility, so I apologize for that. We have also been involved in figuring out what equipment we will need for that and helping with design as far as where things will go and what's needed out there. So, that's moving forward. And, then, also water is doing a small remodel internally in their building and we have been helping with that a little bit for some of the SCADA needs. And also expending and adding wireless out there. The last item that's a rather large project on our plate this year is the backup replacement. For many many years -- probably -- well, since I have been alive we have used tapes for backup and tapes work great, but they introduce a lot of problems. Some of those problems are the reliability of the tape. If we back it up is it going to be good when we go back to it. There is the cost of the tape. As we grow bigger and bigger and get more and more data we have to have more and more capacity. We also have to have more time to back those up, so that's one of the key factors that goes into this making a decision to move away from this was we are running into problems with how quickly we can back up our data. Right.now it's taking us almost a full week to complete a whole backup, which presents a problem, because we can't guarantee the integrity of the data that we have for the city. So, we have replaced it with a new system. It's actually in process right now and our backup window that normally takes just under seven days goes down to about six hours. So, we are able to get backups more regularly, get the data protected that we need to protect. It is also being replicated off site to our police department. In the future we may look at doing the co -lo facility for that redundancy, but right now that's where it's being backed up to. So, that gives us a little bit more resiliency in case we do lose something. And that pretty much covers our new projects. I think the next slide is moving on to the next segment. But I guess I wanted to open up if there are any questions or comments about anything I have mentioned. De Weerd: Thank you, Dave. Any questions from Council? Bird: I have none. Cavener: Madam Mayor? De Weerd: Mr. Cavener. Cavener: Dave, thanks for your part of the report. I'm just curious of the -- of the 3,200 calls that you received, the help desk calls, how many of those get escalated to level two and how many of them is Krystal able to provide support for right away? Meridian City Council Workshop December 9, 2014 Page 13 of 52 Tiede: Councilman Cavener, Members of the Council, Madam Mayor, I do not have those statistics on me right now, but off the top of my head, since I looked at the numbers last week, the calls that were directly to tier one were about a third of those. Now, those are inbound calls. That doesn't mean that resolution happens with her necessarily -- Cavener: Sure Tiede: -- but I would say probably closer to about 40 percent get resolved at tier one, so -- Cavener: Thank you. De Weerd: Thank you. And the baton has been passed to Mike. Tanner: Madam Mayor, Members of the Council, talk about our software engineering side. I think it's the more exciting part, but that's just me. De Weerd: Oh, yeah. Tanner: As you know, we support a lot of different projects. This is kind of a slide -- essentially all the different apps that we currently support and, actually, the list goes even beyond what have here. De Weerd: I guess a more interesting PowerPoint slide. It had action, Dave. Tanner: I'm going to talk about some of our -- the structure I have for my direct reports right now. On the GIS side we have Doug Green, who is our GIS developer, so rather than just normal GIS functions he also performs some of the developments and actually creating apps based on GIS, which I think is really cool. We have Matt Tenold, our GIS analyst. Porter Merrill is our current graphics intern we have. Does an amazing job. Has helped a lot of people out in different departments. Nick Phares, our software engineer, has done some pretty cool apps in the last few years. We have an org change. We used to have a part-time person, Summer White, she is no longer with us, but we are replacing her and going full time, we now have Ryan Schafer, our new software engineer full time and we also now also have Dwain Nells, software engineer, giving us, basically, at this point three full-time software engineers. Apparently it looks like Ryan and Dwain are going to be helping a lot with Accella implementation that we have, trying to go with three full ones, better and more efficient. Looking at some of our accomplishments that we had for this last year, one of the big apps that Nick Phares ended up doing -- this was an app called contract management. Started out really -- oh, here is a screen shot of it. Started out really as a finance app and it's going really as a citywide type application. It was really created to organize all the different contracts within the city into, basically, a central point. Also lines for file attachments and basically a central organization place for all contracts in the city. So, anybody can find it and come up with what they are looking for and really is being expanded and being used by all the different departments and we have organized these things through. Here is another screen shot. This is actually drilling into a contract. You can kind of see some of the information they have on there. Being able to -- it will Meridian City Council Workshop December 9, 2014 Page 14 of 52 find milestones and dates -- different parts of the contracts and notifications have been built into it to allow people to see when something is coming due and when it's done, so on and so on. And I had mentioned we had a milestone system to -- for the obligations on it and the requirements for it. We are also looking at tying it directly to our MIT, which is our city finance system that we have to be able to track payments against it and for PO changes and change orders. He did a fantastic job on this application. Another app that we developed this year -- again, Nick Phares did -- called City Asset Tracking or nicknamed CAT, we needed a way in IT really to be able to track all the different pieces of hardware that we have, whether it's assets, along with licensing, maintenance of all the stuff that we try to support, so kind of know where it's at and where it's been. Provides ways for us to -- to inventory, so -- you have all seen the symbol on the computers, that way we know where every single asset is at, along with knowing what's been disposed of and what we need to get rid of, along with the whole life of that asset. Along with that we are also having connection information in there for how we relate back to the county on their network and what IP addresses get assigned to what equipment. Here is a screen shot of it, for example, listing out all our -- for example, our switches. If you drill into one of those items it gives you a lot more detail on it, giving you when you purchased it, whether -- basically when the warranty date is on it, when it's going to expire, what the current location is. Serial number. All the important information that we try to keep track of of all this equipment that we have. It's been a huge benefit for the IT Department for this year. Especially for Stephanie. The last thing I want to talk about is addressing for utility billings. As you know, we are replacing our utility billing system. One of the big efforts that we did on this was a combined effort between IT, Desk Service, Aspire and MUBs, basically, try to go through all our addressing that we had in Coselle, which is our current utility billing system to try and correct, because a lot of the addresses were bad in there and just really messy. We started off within that system with about 32,000 addresses. Created an automated, got that down to about 5,000 and, then, on top of that created a little app for them to go through -- with that 5,000 to be able to associate those addresses in Coselle to our MEAD addressing in our enterprise data, enterprise addressing layer for the entire city and be able to relate those two together and find all the ones that were missing. And we have this little app that comes up, so all the addresses are stored mainly in Coselle and allows them to associate with MEAD by clicking on it and, then, associating the address. At this point we are down to about the last couple hundred addresses from about 5,000. It's been a huge project to undertake. We have had crews out there basically going around the city and verifying addresses, because we have had a lot that have been wrong over time and it's just amazing how off they get and so it's one big giant effort to try to get these things all corrected, so as we go in the MEAD we have correct addresses to go on. Upcoming projects for this next year. Got some kind of good projects coming up. Our biggest one we are doing is our Accella reconfiguration. Even though we have had Accella now for about three years or so, we really want to go -- kind of take a step back and try to reconfigure this thing to get it -- make it a lot more efficient type system and right now a lot of the end users might not be quite as complete as they should be. Some cases too many steps to be able to do a particular task. The system allows you to back yourself into a corner. Sometimes they consider not even used and at this point looking at it from our time -- the amount of time and effort it takes us to support it, we don't think it's maintainable with the current staff we have. So, we'd like to Meridian City Council Workshop December 9, 2014 Page 15 of 52 kind of go through this thing, at this point putting two FTEs on it, plus another software engineer for a short amount of time until we can get to the right place, basically bring this thing back up from the ground up and make it work. Basically treat it almost like it was an in-house software -- software application and go through and really look at all the different processes that we have that relate to the applications and try to make it work better, try to make it work as if we had written it in house. So, all the business processes that Acella uses, try to make them more efficient. We want to take it one department at a time, do it -- slowly one department at a time, make sure it is correct. We also have been teaming up with Canyon county on this, because they kind of ran into the same issue that we did and kind of trying to follow in their footsteps with success. I think it will be a really good thing to get this done, try to make -- Acella is a really really good system, it just needs a little bit of tweaking to get it to work at the most optimal level that it can. The other big project that we are working on this year -- and this is really a long title -- Public Works Capital Constructions Project Tracking. Hopefully we will get a better name for it before we go too far in it. This project will allow basically Public Works for -- and them internally for project tracking. It tracks costs and commitments, allowing them to drill down to expose details, such as PO numbers, accounts and commitments. Basically it's just a way for them to track all their internal projects that they have going on, all the financials, the cost. Not necessarily the project management side, but really more the financial side of it. Also to be able to use for budget forecasting and that's the next one. Do you guys have any questions? De Weerd: Any questions? Bird: I have none. Very good De Weerd: See, you were so thorough, Mike, we didn't have questions. Well, we are anxious to hear the clerky things. Jones: Thank you. Madam Mayor, Members of the Council, thank you for the opportunity to speak with you. I'm actually very excited to tell you what we have been up to. I have been in my role for about year and a half and, then, I can tell you from being in the management level I have a completely different understanding about the functions of the clerk's office and appreciate what our team does. So, I'm going to go through some specific successes for each one of our team members. That being said, though, while we are all a subject matter expert in our specific area, we absolutely are cross -trained on everything that our office does, so there is a seamless transition in between staff if we have absences and things we are able to provide the same level of service to the public, so -- so, Holly Binkley is our administrative assistant and she is really our customer service wizard. She's the front line for City Hall and provides that first point of contact to the public. She answers the main phone line to City Hall. So, when a member of the public calls the city's main phone Holly is the employee that answers that call. In FY -2014 she answered 19,760 external phone calls, which is 1,647 calls from the public on average a month. Some of these calls are really quick and she transfers them to other departments. Some of them are lengthy, because they need research done, they are looking for information on community services, city code, city policies, or ultimately Meridian City Council Workshop December 9, 2014 Page 16 of 52 needing assistance that comes from other government agencies and while that is probably likely enough to keep her busy full time, she also provides support to us in a lot of different areas. She provided support to a committee this year to help update our external room reservation policy and it was adopted in August. We are getting a lot of positive feedback from the public on that. Our HOAs really appreciate that that fee is waived. So, that's one of the positives. She also maintains the city clerk's website and the searchable document site. On our end searchable documents is laserfische and Holly has been taking a fine tooth comb through our electronic record naming system and she's examining and renaming files, so that all document names are consistent. Over time as employees change some of the names -- naming becomes inconsistent and a little bit lax, so this project absolutely will decrease search times and making searchable documents a more user friendly tool, which you guys should see the benefit of. She is often introduced to the City Hall volunteers as the most important person they will meet and she's established a wonderful partnership supporting those volunteers. Barb Hatch from PD gave her this wonderful feedback thanking her for treating our volunteers so well. She's happy to assist all volunteers. She helps them become familiar with the building and what each department does, what each employee does, and she does a really great job of keeping everybody on track. So, Sherry Finch is one of our assistant city clerks and she is the passport queen for our office. When we started doing passports in November of 2012 we really had no way to anticipate what that -- what the effect of adding that function would be on our office. The demand for passports in the valley continues to be high and we have virtually lost Sherry to passports. She easily spends seven hours of her day in passport appointments or on passport calls. In FY -14 Sherry responded to 4,134 passport calls, which averages out to 344 calls a month. And these are people wishing to schedule passports, they have got questions about their application process, so not only is she operating in that -- in the office meeting room all the time -- she offices -- or is often in her cubicle responding to those calls. She provides a level of customer service that is unparalleled in the valley in my opinion. Each applicant is seated, they are greeted warmly. She doesn't treat the process like an assembly line, but takes the time to engage with each applicant that she works with. And it's through the conversation with those applicants that she often finds and is able to correct errors in their application and she does this all while strictly adhering to the requirements and procedures established by the state department. Sherry has a nearly perfect record from the state department and in two years we have been doing this she's only been caught with two errors, which I think is absolutely phenomenal. In FY -14 she processed 2,250 passports, which is 238 more than in FY -13 and while we never intended passports to be a money making endeavor for our office, Sherry's -- the revenue that we gain from our 25 dollar acceptance fee is enough to pay her fully loaded salary, which is, again, awesome for the city. So, Sherry receives positive feedback from our passport applicants all the time and I will quote one of them who said: I'm guessing that Sherry treats everyone with the same world class professionalism and warmth that she did me. And that really describes Sherry very well. She's an absolute star and we know that she is representing our office well, but the state department has also commented that as well, because she's an extension of that department, so she's doing well. Nancy Radford is our assistant clerk and she is really our licensing guru. Nancy knows the licensing code extremely well and does an absolutely fabulous job of relaying it to the public. Nancy does not turn a blind eye to Meridian City Council Workshop December 9, 2014 Page 17 of 52 things she sees in the community, even in her off time. If Nancy drives by a fruit stand on the weekend and she knows it does not have a permit, she makes a mental note of that and when she gets back in the office on Monday she follows up with that business owner. Nancy actively engages with our business community to process temporary use permits and beer, wine, and liquor applications. She's proactive and reaches out to businesses to remind them of our permitting processes. She sends letters at the beginning of the renewal season to both local and corporate offices to help keep the community aware of our timeline. She also keeps a calendar of large events from year to year to contact applicants and remind them of submittal deadlines. Nancy is absolutely necessary to the success of large events in Meridian, like Dairy Days. She works closely with the applicant or applicant's agent on the requirements of the city. She is also happy to take their feedback and present that to our TUP team to look at how we handle large scale events in Meridian. I know that our TUP team would absolutely agree with me on that. She's -- she is invaluable and I attend all large scale event meetings with her with those applicants and, honestly, I'm there for no other reason than to take minutes and support her, because she absolutely leads those meetings. She keeps discussion on track and she's very position oriented, which I appreciate. She participates in monthly meetings with our team from CenterCal, which is at The Village to insure timely and successful business openings at The Village. She has also processed more than 536 printed applications this year, which is 162 more than she did at the same time last year. And I have to commend Nancy on her dedication to our public. If a member of the public comes in with a business idea that doesn't fit within our code Nancy will sit with them and she will brainstorm a way to change their business plan so that it does align with our code. A member of our team gave her this kudo. I don't know who, but Nancy worked her magic and an angry customer left smiling and that's what Nancy does. She advocates for the -- the success of our local business community all while adhering to the code and I think she's good at it. Machelle Hill is our deputy clerk and she is our development extraordinaire. Machelle works closely with the planning department to complete project files for the development applications. She does all state code transmitting and noticing requirements. So far this year Machelle has processed more than 123 development applications. She closely monitors our project files and keeps detailed notes, so that we have a clear paper trail for each project and can identify the status of any project starting the approval process, which is crucial for the applicant, so that they have a contact not only in the planning department, but in our office, so know where they are at. Many of the functions that the state code requires of the city clerk fall within Machelle's tasks. She supports the city's varied commissions and maintains their minute books. She's transcribed minutes for over 42 commission meetings so far this year. We have been working with Machelle to get her trained up on how to process public record requests and she supported me on those this past year. With two of us well acquainted with the records request law we are more available to city staff and the public when questions arise. Machelle is always a huge champion for Accella and she truly believes in what Accella can do for the city. She's established close relationships with her counterpart in the planning department and received kudos this year for being very instrumental in file clean up. She spent hours going through our Accella files to make sure that work was properly closed, so that the electronic record was accurate and she continues to maintain the Accella records to insure its accuracy and I know she has already worked closely with our new Accella team Meridian City Council Workshop December 9, 2014 Page 18 of 52 in IT to make sure that that implementation goes over smoothly in our office as well. So, I am the senior deputy clerk and often a lost record finder. If a member of city staff or the public is looking for a record I can generally find it for you. With Machelle's office our -- or with Machelle's help our office has closed 126 -- actually, 129 now. Sorry -- public record requests this year and we have also worked with our internal process to help streamline how requests are handled. Public record requests are heavily mandated by law. That being said, though, we are always open minded looking at how we handle them in our office to make sure that we are giving them as efficient and transparent to the public as best as we can. I provide support for you guys for your meetings and your packets, all the contracts, agreements, resolutions, ordinances, documents, that come out of these meetings I make sure that they are completed and routed to the appropriate departments and the large consent, while you guys can approve it in just a couple seconds, it can take a couple days work on our department's end to process all of that. I also provide support for the Historic Preservation Commission and act as their administrative assistant. This year we partnered with MDC to launch the updated historic walking tour. This tour has been adopted by the West Ada School District and is part of the curriculum for third grade students and through a substantial partnership with MDC that we are now hosting field trips of that for all third grade students. So, they have coming into the building and checking out a little bit about what City Hall is all about and, then, getting to go out on the walking tour, which is pretty fantastic. And I manage our office and I say that really only in title, because what we do in our office we definitely do as a team and our success and cohesion is really based around the way that we all interact well with each other. So, we are looking to the future and seeking ways to be more successful in how we serve the public we would like to implement Accella citizens access to receive and process license and permit applications in 2015. Right now all of these applications are still handled over our counter. We would love it if applicants could do it from their computers at home and provide that -- no one likes to come in, so that customer service for that I think is really important. So, along that same line we want to use Accella in its full function in 2015 to complete both the internal and external side of our development application transmittals. We would like to complete the laserfische project that I spoke about that Holly has been working, standardizing file names. This clear naming system for electronic documents across the board will, again, make things easier for your lives and for the lives of the public, too, which is important. We would like to complete the second phase of the walking tour project and cover the properties north of Pine Street. We are on target to complete that in March. Without stepping too much on HPC's strategic update, I can tell you that we are looking to pursue the establishment of an historic district. This district will not only provide protection for our historic buildings, but could become a destination for our city and we would like to start processing public record requests on Accella. Right now it's all done manually using e-mail and an Excel tracking spreadsheet, but Accella absolutely has the capacity to handle that and that's one of the benefits of being in IT, because we have already put a bug in our Accella team's ear and they know that we will be looking at doing that this year. So, we are also scheduled for a facility inspection from the state department for our passport facility. The last time we did one was in 2013 and we got great feedback and scored really really high and we would like to maintain that. It's making sure that our standards are staying up. You know, when you start a new process your hyper aware of the requirements and we want to make sure that as time goes by that Meridian City Council Workshop December 9, 2014 Page 19 of 52 we are maintaining that same level and doing the procedures as adhered to as we possibly can. So, with that I can wrap up my portion and just say thank you to you guys for -- from me personally for my -- your support of the walking tour and the project, but just for supporting our team and understanding the goals and the values of the team, what we are going for. So, I can stand for questions and, then, I think the IT team is still here, too, if you have got questions on any of that. De Weerd: Thank you, Jacy. Council, any questions? Cavener: Madam Mayor? De Weerd: Yes. Cavener: Maybe just a comment for both teams. I'm quickly scribbling down one question after another question I want to ask and I realize that we probably want to get home before 10:00 o'clock, so I will follow up with some of these maybe offline, but a comment just -- and thank you for all you do. I was doing some math. It sounds like Holly on average gets like 76 calls a day, we are processing eight passports a day, working on -- Nancy is working on two applications a day if you break it out. It's mind boggling and, then, on top of that the great customer service that you provide and I just wanted to follow up on something you said that nobody wants to come down here and I would argue that, I think that you guys provide great support. So, while we want our citizens and our customers to be able to come down here -- not because they have to, but because they want to and I think they will continue to do that because of the great support you provide, so thank you. Jones: Thank you De Weerd: Well said. Anything further? Thank you, Jacy Jacy: Thank you all. De Weerd: And you didn't mention with the HPC walking -- history walking tour it won an award and it was highlighted at the Association of Idaho Cities conference, got a lot of positive comments we found at the national conference that it is a superior model. So, it's pretty cool and it got a lot of positive comments from the students, the parents and the teachers. So, it's exciting to see Meridian history in our schools and you were an integral part behind that., So, thank you. Jacy: Thank you. And if you all at anytime are interested we have a bunch of thank you cards sitting in our office from the third graders, so if you ever have a bad day and are in the area of City Hall pop by and take a look at those, because what you guys are doing and what MDC is doing is fantastic for these kids, so thank you. De Weerd: Thank you Meridian City Council Workshop December 9, 2014 Page 20 of 52 Holman: Madam Mayor, Members of the Council, as you can see we have a stellar team in this department. A lot of what we do is just kind of behind the scenes in providing support for other people, but I think we make people's jobs more efficient and easier to do. So, in this next year as we roll out the citywide strategic plan and finalize that, IT and the clerk's office will, then, be able to formulate our strategic plan for the city, because of our support role it will naturally follow right along behind the citywide strategic plan. So, I will also be updating IT policies. The original policies were passed in 2010. Time to take a look at those, update, probably expand them a little bit more, incorporate a few more areas and just update everything, so that will be a huge project over the next year and doing the same in the clerk's office, really looking at all of our different rolls and the different projects that we have and finalizing some policies in both offices. So, that's what I'm headed into for the next year, so thank you very much. De Weerd: Thank you, Jaycee. I think your department models superior customer service. Your team touches all of us in a unique way and they always do it with a smile and you're greatly appreciated, especially when people need your team they need you yesterday and they -- they respond very well. So, heartfelt thanks to all of you. Holman: Thank you. I'd like to add one more thing. I know Jacyee spent a lot of time talking about all the accomplishments of her team that when we talk about the walking tour -- when she took over in the clerk's her responsibility or what she was given was just at the HPC meeting take minutes, recordings, make sure we have accurate minute books and everything that she has done beyond that has been her own initiative and she sets the example and the standard very high for the rest of her team, so just want you to know everything you hear of her doing and all these accolades, that was all initiated -- self initiation. She did it all on her own. So, we are very proud of that and she presented it to the District Three clerks office last Friday, walked through how she did it and even set up a model for them to show them how you could do it if you had no budget, how you could scale it down and do something similar in these smaller towns that also have historic districts or would like to have an historic district or a walking tour. So, we are trying to spread the knowledge and spread some of the, you know, work that she has already done and help other cities, so -- thank you. B. Finance Department: Utility Billing Software Replacement De Weerd: Thank you. Item 5-13 is under our Finance Department. Public Works finance department. Pepin: Madam Mayor, Members of the Council, I am out of the Finance Department, but I am happy to be reporting on an activity or a project that is not just the Finance Department, so on behalf of Stacy Kilchenmann, the project sponsor, and, then, the steering committee, which I'm lucky to be a part of, we are here today with our project manager, who I will introduce to you in a moment, so she can take over and give you an update on where we are with this critical initiative. Meridian City Council Workshop December 9, 2014 Page 21 of 52 De Weerd: I have questions. Yes, this is certainly a huge undertaking and I think that Council will be impressed with what has happened up to this point and excited to move forward. Pepin: Absolutely. Uh-huh. Well, while Caleb is looking for those I wanted to highlight before I introduced our project manager, who can really give you the details on where this project is at -- this is really a cross -collaborative effort amongst multiple departments in the city and, then, also divisions within those departments. It takes great work from the folks that just presented to you from the IT Department, from both sides of the house. Also from a Public Works perspective as a member of that team, the water division, our GIS division, our asset management division and, then, also in the Finance Department with Keith Watts in purchasing, with Rita Cunningham and with our utility billing, our MUBS folks with Kaitlin and her team, it's really become a citywide project that I know you're all very proud of when we can work together as teams. So, I won't get into details. What I would like to do is introduce you to a project manager that we brought on board last February. When you try to manage something like this that is that involved in so many different teams, we need to go outside to do something like this and Sheryl Bishop has done an outstanding job to this point bringing these teams all together. She's PNP certified, which is, as you probably know, that's recognizable by the Project Management Institute. She has 25 years of professional business experience. She holds a bachelor's degree in economics, a graduate degree in business administration. Her areas of expertise involves implementation of projects, performing contract negotiation and vendor management services and I am happy to welcome Sheryl to our team and to provide an update on where we are. De Weerd: Thank you, Mike. Pepin: You're welcome. Bishop: Thank you, Mike. Appreciate it De Weerd: Welcome, Sheryl. Bishop: Thank you, Madam Mayor, Members of the Council. I have a report to present to you that we can add to your packet. So, just a little bit of background. Your report has a little more detail in it than the slide show. The slide show is just for reference purposes. De Weerd: You can tell you're working in the Finance Department. Bishop: So, a little bit of background. So, Finance, of course, has been weighing the need to replace the utility billing system for some time, since early 2012 at least. When it became apparent that upgrades to Coselle were simply not providing added value in terms of substantially reducing the billing cycle, which apparently runs about six to seven hours a day, increasing auditability of all transactions. Right now the audit lines do not track all of the deletes and adds to the system and automating the integration between other courses and like Accella enhancements that need to share the information. So, we Meridian City Council Workshop December 9, 2014 Page 22 of 52 contracted with Moss Adams to deliver requirements and needs assessment for us and, then, this year contract -- I came on board with Express IT to provide you some project management services and begin the RFP process. So, on the RPF process, late in 2013 the Finance Department did solicit assistance from Moss Adams. Moss Adams is a consulting firm that specializes in accounting controls -- distraction there. Specializes on accounting controls and computer systems with expertise in the utility industry. So, Moss Adams provided a team of experts who came on site, as well as did some remote requirements gathering and with that they provided a needs assessment that we developed an RPR from. So, the RFP was distributed on August 12th and seven software vendors responded -- we actually had 17 originally who were interested, seven actually turned in proposals for that. So, the city proceeded to evaluate the vendor responses. We based our evaluations on technical requirements, on functional requirements, on vendor profile, as well as vendor references and, of course, the overall cost and we broke cost down for five years. So, as we continued through the evaluation process we were able to narrow down our selection of seven vendors to two. We offered those two vendors the opportunity to come on site and demo their systems and after those demonstrations the city determined that we had one system that we would like to take a look at, so we sent an evaluation team to conduct an on-site performance audit and audited the Tru Point Solutions Tru Bill system. We visited Sacramento's suburban water district. They have a similar setup, about 40,000 accounts that they service at this time. Similar business model. And we determined that after the on-site visit our VR2 requirements that were addressed as out of the box, meaning all customized, not necessarily configured, were available, operational, and, then, working well at Sacramento. The evaluation team unanimously voted to award three point solutions to contractors who had an intent to award. So, tomorrow we will be announcing our final contract ranking and our intent to award the contract. We will base our contract negotiations on the city standard terms and conditions and also the RFP document system requirements, the scope of services and the cost proposal that was provided to us by the vendor. The city's target percent of fully approved contract the City Council on or before January 6th. And just looking forward, the estimated five year cost to own of the Tru Bill utility billing system, this including the installation, data migration, configuration, training, testing and implementation is a little over 500,000. The capital budget for the system implementation is 710,000. At this time we are projecting to be under budget. The duration from the initial out-of-the-box installation, which means no configuration, this is just out-of-the-box functionality, through post implementation, could take up to 12 months. More than likely about eight to ten, but could take up to 12. Much of that is due to the fact that the system is highly configurable. We want to spend a lot of time taking a look our business rules and making sure that we program a system to do exactly what we need it to do now, what we anticipate it -- that we need it to do several years down the road. So, with that I will stand for questions. De Weerd: Thank you. Council, any questions? Bird: I have none. Zaremba: Madam Mayor? Meridian City Council Workshop December 9, 2014 Page 23 of 52 De Weerd: Mr. Zaremba. Zaremba: Just because I'm aware there is a big push in many people to deal with customers to approach them in the media of their choice, I know I prefer to get a bill on paper and write a check and send it, but other people prefer to get it on their e-mail and others on cell phones or whatever mobile device they have. Is that -- are we going that direction to -- maybe we are doing some of that now. Bishop: So, Madam Mayor and Council Members, great question and thank you for the opportunity to talk a little bit about what this can offer. So, yes, we will have -- this is, essentially, a web based system. So, what that means is you have a database that sits behind, you have a web browser that's customer facing and you have a web browser that's internal facing. Essentially you hit the same system from two different angles. So, the nice thing about that is the customer portal, customers can come online, they can see their information realtime. As we are updating information here at the office that information is visible to the public. So, we can do -- as with our current system we have a current contract with BDS and they do our credit card processing for us and they do all our payments and so forth. We will be talking with them in the future about how best we can integrate that, as opposed to doing an import and export a day, we would like to do a realtime integration with that data. So, if we can make that happen with BDS and with their third party vendors, great. And, if not, the system we are purchasing has a third party vendor called Element that we will certainly pursue that as well. So, yes, we do have online. It can still be a paper copy. Hopefully we can meet all of the criteria there -- the constituents are interested in terms of how they want to see their data, as well with the customer portal in addition to having normal billing information, we are hoping to provide a historic usage and be able to show some graphs and they can play with that and see how they are going with their usage. Zaremba: Thank you. Bishop: Did that address your question? Zaremba: Uh-huh. De Weerd: Thank you, Sheryl. We appreciate your leadership on this. I have heard gleaming reports from Stacy about the role you have played and appreciate -- we know the more up front we can do to make this address all of the user needs the better the implementation is going to be. Bishop: Absolutely. Absolutely. And I -- and for the record, the team is wonderful to work with. We have a great bunch of folks that are working together to collaborate to make this a success and, frankly, the project manager is all we do is put a schedule together for the resources to make the job -- to make it work. So, thank you. De Weerd: Well -- and to the team members I know there has been a lot of participation and appreciate, too, making sure that every user has an opportunity to give input and give Meridian City Council Workshop December 9, 2014 Page 24 of 52 experience from their perspective. So, it sounds like we are headed in the right direction. Appreciate your caution and implementation and seeing how we roll this out. So, thank you to all. Bishop: Thank you on behalf of the team. Item 6: Items Moved From Consent Agenda De Weerd: Okay. There were no items moved from the Consent Agenda. Item 7: Action Items A. Public Hearing: Proposed Winter 2014-2015 Fee Schedule of the Meridian Parks and Recreation Department De Weerd: We will move to Item 7-A under Action Items. Public hearing on the proposed winter 2014-15 fee schedule for the Meridian Parks and Recreation Department. I guess this is your swan song, uh? Dilley: This is it. One last one. Yeah. Madam Mayor, Members of the Council, our activity guide for the Parks and Recreation Department is scheduled to print and be in the Meridian Press this Friday and we are here, obviously, to pass the fee schedule. We have about 239 individual activities that people can sign up for this time around and it's probably our biggest winter yet, so -- so, before you is the Parks and Rec Department fee schedule and with these new activity fees. You might notice a change in the fee schedule, which we did implement with the help of city staff and Council Member Milam, we amended the new delineation amongst the fees for taxable or nontaxable fees regarding recreation opportunities. It's my hope that the resolution to adopt the new fee schedule will be passed today and I can stand for any questions. De Weerd: Council, any questions? Bird: I have none. De Weerd: Okay. It is a public hearing and it's unrelated, but since you are going into the private sector, just to keep your hand in the public sector, we are looking for an advisor for our TAC -- MYAC TAC committee. Dilley: Oh, really? De Weerd: So -- uh-huh. So, I'm recruiting you. Dilley: Are you? De Weerd: I know you would miss the kids and -- we will talk. Meridian City Council Workshop December 9, 2014 Page 25 of 52 Dilley: Okay. We can talk. Yeah. De Weerd: I had to get it on the public record. Thank you, Patrick. Dilley: Thank you. De Weerd: We do appreciate all you have done. You have brought a great sense of energy to our recreation programs and certainly you have left a huge influence and a huge mark on our youth council and you will be missed. Dilley: Appreciate that. Thank you very much. De Weerd: Thank you. This is a public hearing. Is there anyone who would like to offer testimony on this item? Cavener: Madam Mayor? De Weerd: Mr. Cavener. Cavener: Seeing no public testimony, I move we close the public hearing on -- Zaremba: Second. Cavener: -- on the fee schedule, Resolution 14-1036. De Weerd: It's been moved and seconded to close the public hearing on Item 7-A. All those in favor say aye. All ayes. Motion carried. MOTION CARRIED: FIVE AYES. ONE ABSENT. B. Resolution No. 14-1036: A Resolution Adopting the Winter 2014- 2015 Fee Schedule of the Meridian Parks and Recreation Department; Authorizing the Meridian Parks and Recreation Department to Collect Such Fees; and Providing an Effective Date De Weerd: Item 7-B is Resolution 14-1036. Cavener: Madam Mayor? De Weerd: Mr. Cavener. Cavener: I move that we approve Resolution 14-1036, fee schedule for the winter recreational activities for the Meridian Parks and Rec and include all staff testimony. Milam: Second. Meridian City Council Workshop December 9, 2014 Page 26 of 52 Zaremba: Second. De Weerd: I have a motion and a second to approve 7-B. If there is no discussion, Madam Clerk. Roll Call: Bird, yea; Rountree, absent; Zaremba, yea; Borton, yea; Milam, yea; Cavener, yea. De Weerd: All ayes. Motion carried. MOTION CARRIED: FIVE AYES. ONE ABSENT. Item 8: Department Reports B. Fire Department Report: Compliance Engine De Weerd: Item 8-B is under our Fire Department and turn this over to Perry. Chief Palmer. Palmer: Thank you, Madam Mayor, Members of the Council. It's my pleasure to be here today to talk to you about reporting on inspection, testing, maintenance and fire protection systems. Not necessarily an exciting topic to talk about, but a very important one to -- to us. We have a lot of systems in town and it's important that we continue to have a safe community, because we have a lot of good systems in place to protect our citizens. So, the -- if I work this right. There we go. So, ITM, it's important that -- that's the inspection, testing, maintenance. We are going to talk about how big of an issue it is and, then, we are going also talk about the Compliance Engine to follow up. So, sprinkler performance, we have a lot of buildings in our community that have automatic fire sprinklers. This is national statistics that sprinklers when they operate they are effective in 91 percent of the reported fires. Ninety-two percent of the activations were wet pipe systems and those were what you typically find inside a heated space, so inside the building itself. And 81 percent are dry pipes, which are typically where you would find outside. They are exposed to the freezing weather. Sometimes you will even find them inside freezers and coolers, because they need to have protection, too. So, just real quickly -- so, since statistics -- they are a little bit old, but they are the most current that we have of why sprinklers fail to operate. The most prevalent is the system is shut off before the fire. That could be on purpose. The system is problematic and rather than fix it, it gets shut off. It can be for nefarious reasons that it's shut off. But, essentially, that is the biggest cause. Manual intervention defeats the system. It could be a valve that's closed. It can be, again, a nefarious reason that it happened. Damage components, which I think relate a lot to why systems are shut off. Lack of maintenance, an inappropriate system for the fire. Reasons when sprinklers -- oh, we just talked about that one. Sorry. Okay. So, why are sprinklers ineffective? And this is why the inspection is so important. Water did not reach the fire. Could be for a whole host of reasons. Either the sprinklers aren't placed properly, they are occluded by storage of materials, shelves, what have you. Not enough Meridian City Council workshop December 9, 2014 Page 27 of 52 water is released and, again, this could be just the fact that it's not reaching the fire. Again, damaged components, manual intervention, and lack of maintenance. Inappropriate systems for the fire. So, you could have a situation where maybe it needs to have a fire pump and it doesn't have one, so there is not adequate pressure. The water system isn't appropriate for the need. There we go. So, in Meridian we have approximately 3,200 occupancies. Those are individual occupancies, not necessarily the building, and out of those 3,200 occupancies there is approximately 18 that have some kind of afire protection system and when we are talking about fire protection systems we are focusing on fire sprinklers, fire alarms, which would include pole stations, and smoke detectors and, then, hood systems, which you typically will only find in restaurants. So, a lot of these will have multiple systems as well. You could -- you could have two or all three. So, last year Meridian Fire did receive reports for approximately 500 systems, so that left about 1,300 systems that we received no report for. So, when we do get the reports the system that we look at -- we have to look at the reports, we have to review them, look for any deficiencies that need to be addressed. We have to file and -- scan and file those reports and, then, the follow up as needed. So, the challenges that we face with that is -- it takes time. So, we have limited inspectors, although we did recently add one, so thank you very much for that. It's made a big difference so far. But we have to -- a lot of verification that we have to do. We have to make sure that the occupancy is still the same as what the report says as it relates to our records and that the testing -- you know, how have those intervals been occurring, if there are repairs to be completed generally we don't get any updates with those, so that creates a lot of follow up time for us to see if the repairs have been done. He did them. What it entailed. And, then, the inspection versus the maintenance schedule, trying to coordinate those -- those efforts. So, one of the things that many departments across the country that face this same situation are doing is they are turning to third -party reporting. That allows them to address the inspection needs and follow that and, then, be able to be in compliance. Many times we go out and do inspections and the -- we may do that inspection in January, but the system isn't scheduled to be tested until March. Typically we won't go back in March just to check to see if that system was done. It's -- it's a lot of extra effort, time, and it interrupts our schedules, so by having a third -party reporting system, then, we are able to dash board that, essentially, at our desk and at a glance we can see all the occupancies that are currently scheduled to be tested, if they have been tested, if they are compliant, noncompliant, what repairs have been made, when they were made, and who did them. So, that's -- that's one of the exciting changes that this can do for us. So, the Compliance Engine is a system that we have been looking at. We have looked at several that are out there and after looking at all of them we felt like Compliance Engine afforded us the best opportunity to gather the information and make sure that -- that all the things that we need to have done are taking place in a timely fashion. The cost is the most reasonable of the ones that we looked at. That price is left in for the duration of the contract, which at a minimum would be three years. So, essentially, what they do is they send out a reminder notification to the businesses 30 days in advance that they are needing to have their system tested, whatever that may be. If that test does not occur, then, they get a reminder letter that now they are out of compliance. We also get that letter as well. That's a letter that's generated by us on our letterhead that goes out to them. Then it -- when the inspection is done, then, we get a -- basically, like I said, that dashboard report. So, the Meridian City Council Workshop December 9, 2014 Page 28 of 52 contractor that's doing the inspection is able to attach their report, but we, basically, just get a snapshot of how many deficiencies did they find or was the system in compliance. If the system is in compliance we verify the information is still accurate with our records. If it is we just download it into our system. If there is deficiencies we evaluate what those deficiencies are and if it's a critical fail that gives us the opportunity to immediately go out to the facility and talk with the people about getting the repairs done. In some cases it may require a file watch if it's that critical. So, again, it's an effort to make sure that the building is safe for the occupants and ultimately for our firefighters as well. We are able to have remote access. Right now all of our records are in-house, so we have to verify those records before we go out. With this system in the field we are able to look on the spot and see any of the information that we want to have and we will make sure that if the building owner wants access to those test records, that we will be able to get those test records to them. Sometimes they get those, sometimes they don't. But it is -- it's their building, so if they want to have the records we will make sure that they get that. So, here is some of the cities that are currently using the Compliance Engine. Again, there are other systems out there and I will say that to that end it's like most anything, there was a -- there was a need. The AHJ's, which the fire department is considered the authority having jurisdiction -- has had this gap for a long time. There is two or three businesses out there that recognize that and put a system together, but with most things there is always the opportunity to build a better mousetrap. So, Compliance Engine is the best program that's out there for use today. In fact, one of the things that we wanted to do was to make sure that we could focus on a system that would be usable and compliant for -- for all of our local jurisdictions. So, there is a handful of contractors that do this type of inspection and maintenance work in the valley here and so being able to report to one system that works for Nampa, Eagle, Caldwell, Meridian, Boise, was important to us. Some of us are on a shorter time frame than others, but, essentially, everyone in the valley here is looking at going to this system, so -- but, again, to my previous point, we will always look for if there is something better out there that is equal to or better than what we are doing and it could be -- but it's equal for us, but it's more beneficial to the contractors or it's more beneficial to the business owner. We are certainly always open to looking at that. But right now Compliance Engine has the best track record, the best endorsement, and the best testimonials of any of the components that are out there. So, with that I would stand for any questions that you might have. De Weerd: Thank you, Perry. Council, any questions? Cavener: Madam Mayor? De Weerd: Mr. Cavener. Cavener: Chief, just one question. The slide about the cost, who -- who pays for that? Is that the business or the occupant? Is the city paying -- that part wasn't made clear to me. Palmer: Okay. I appreciate the question. Thank you, Councilman Cavener. The cost is borne ultimately by the person doing the contracting. So, when they submit their report it's a ten dollar fee per system per year. So, essentially, if it's a sprinkler system, as an Meridian City Council Workshop December 9, 2014 Page 29 of 52 example, it's ten dollars some places like -- let's take Lowe's, for example. They have four different zones, plus a dry system. So, they have actually a wet and a dry system and they have five different sprinkler risers. It's not 50 dollars. It's ten dollars. It's ten dollars for the system. If they have a fire alarm in addition to that, then, that would be ten dollars, and if they have a hood system -- in some restaurants they have all three, then, that would be 30 dollars, but the hoods are required to be done twice a year. So, that would be an additional ten. So, it would be 40 dollars, then, for a restaurant -- a large restaurant. Cavener: Mayor, a couple of quick follow ups. Is that fee uniform? Is it an industry standard? Is that -- I guess how is that fee derived? Palmer: That is the fee that Compliance Engine charges for covering their cost of sending out the notifications, maintaining the website, and delivering that information to the AHJ. Cavener: So, if someone is building a project in Nampa or in Boise, they would expect to pay the same cost? Palmer: Correct. Yes. We would all -- all the -- all the AHJ's would enter into a similar contract with a similar time frame and so that is their standard cost. The reason I say that it's ultimately borne by the contractor is -- you know, I'm not speaking for them, but they may choose to pass that cost on, they may not, depending on the occupancy and what other arrangements they may have, so -- Cavener: Thank you. Milam: Madam Mayor? De Weerd: Yes, Mrs. Milam Milam: How do the contractors feel about this? Have you spoken with them? Palmer: Well, Council Member Milam, yes, we have. We have had four different meetings where we have invited all the stakeholders, which include -- we have had BOMA, we have had the contractors, we have had business and property owners that have looked at the program. I think that -- that it's -- they see the benefit to this in that they understand where we are at in not getting all the reports that we need. I think ultimately it works to their benefit, because theoretically they will get more business, because people will be aware of the requirement and they will make that outreach to get the work done. Ultimately we have -- we have the authority to require the repairs that the contractors don't. So, the follow-ups that we do making the repairs is also a potential benefit to them and I think ultimately for the property owners, they have the assurance as best you can that their system is adequately functioning and, ultimately that probably equates to their insurance -- excuse me -- their insurance company being a little happier and that if they have a system that's been out of compliance for two or three years and they have a fire, their could be certainly a battle there as to -- they didn't maintain the Meridian City Council Workshop December 9, 2014 Page 30 of 52 system that would have prevented the fire from being as large as it was and ultimately that could be to their benefit. Milam: Thank you. Zaremba: Madam Mayor? De Weerd: Mr. Zaremba. Zaremba: Your statistic of -- we are getting 500 reports and not getting 1,300 reports, is it the occupant who is supposed to initiate that report? Who initiates the report? Palmer: Councilman Zaremba, that -- that is -- it's a requirement of the property owner to make sure that their systems are tested. Right now it's the requirements that the contractors submit the report, but there is no real teeth to that to require them to report. That's why we are bringing before you an ordinance that that would be a requirement through the fire code that they report to the AHJ all of their test findings and reports to us. It is a provision in the fire code, but with the ordinance, then, it -- what that allows us to do is require them to report to that -- this system, the Compliance Engine. Zaremba: Madam Mayor, follow up. So, my guess would be that there are 1,300 people out there that don't know they are supposed to make the report or do you have any reason to believe they know they are suppose to and they refused to or -- my guess is people just don't know. Palmer: Councilman Zaremba, I believe it's a combination, actually. I think there is some that know that just don't want to take the time to do it. I think there is others that -- it's one of those things that it's kind of out of site, out of mind. We find a lot of times that we go into occupancies that are two to three years out of compliance, because that's the schedule that we are able to get in there on and we find that their system hasn't been tested that long and many times we will get the comment back, well, like I called, but the company is no longer in business or I wasn't able to get a hold of them and then -- so, they move onto other things and, again, it's one of those things -- it's a little bit out of sight, out of mind until you need it and, then, you want to make sure that it works and the only way that we can have some assurance that it's going to work is that it be tested on a frequent basis to make sure that it's working. So, I think it's a combination of what you're saying. I don't think that you can attribute it to one particular thing. De Weerd: Would this be something similar to our backflow testing? Palmer: Exactly. Yes. Bird: Madam Mayor? De Weerd: Mr. Bird. Meridian City Council Workshop December 9, 2014 Page 31 of 52 Bird: Don't the owner of the building or whoever is carrying the insurance is the one that is responsible, am I not right? And are not insurance companies -- most insurance companies I know that are insuring these -- these buildings are out there doing yearly inspections themselves, making sure everything is right. I mean my insurance company always shows up every year to make sure that -- that everything is kosher if they are going to insure me at a decent price. How do we work with the insurance companies on this and who -- who is going to -- who is going to make sure that this is maintained or inspected on a yearly basis? Palmer: Councilman Bird, good questions. Unfortunately, I don't have the experience that you have as being a business owner and how that relates to the insurance company. Certainly as the -- as it goes for the annual inspection, again, when we go out and we do the inspections one of the things that we look at is for the tag and the currency of it. If we find tags -- and this is one of the benefits of being able to on site check the records, is that we will be able to determine who did the last check and are they still in business and if they are not, then, we can work with the business owner as to who their options are that they could use. If we find somebody that has done the testing that's not reporting, as the ordinance requires, then, we will be able to work one on one with them. This will be a -- a process that, you know, I don't think anybody would expect that we would have all of a sudden a hundred percent compliance after a year. It's going to take a period of time, but certainly those departments that have entered into this program have generally seen a 90 to a hundred percent increase in the first year of their compliance reporting. Milam: Madam Mayor? De Weerd: Mrs. Milam. Milam: I have a couple more questions, Perry. One is why -- why don't we do the inspections ourselves? And the second question is do you need something from us as Council? Palmer: Okay. Good question, Council Member Milam. We -- we have the ordinance before you, so that would be the -- the thing that you could do for us. And, I'm sorry, the first part was -- Milam: Why don't you do the inspections. Palmer: Oh, why don't we do it. Because it would cost more -- a whole lot more than ten dollars for us to do it. The departments that -- that do do this typically they charge a permit fee of anywhere between 90 and 125 dollars to cover their costs for the filing, the letters, the -- the man hours that it takes to support this kind of a program. Milam: Thank you Bird: Madam Mayor? Meridian City Council Workshop December 9, 2014 Page 32 of 52 De Weerd: Mr. Bird Bird: But when the building is complete and before the occupancy is signed off, we do check and make sure the alarms are working, the fire sprinkler system is working and stuff, so we do do the inspections on the new buildings at the -- at the occupancy time. Not yearly. Palmer: No. Councilman Bird, you are correct. The -- Rick Jackson, our contractor for finalized safety before they sign off on the certificate of occupancy, they do go out with the sprinkler company or with the fire alarm company. They don't physically do the testing themselves, but they are there to witness the testing and sign off on it. You are correct. Bird: Yeah. De Weerd: Okay. Any other questions? Bird: Madam Mayor, I do have one other De Weerd: Yes. Follow up. Bird: Are these based on a three year contract, these prices? Palmer: Councilman Bird, yes, they -- Bird: I have a problem of giving a three year contract. I don't mind having a one year with options, but we as a Council shouldn't in debt a future -- another Council, because, you know, fiscal year'16 we could have four new people up here and -- Palmer: Right. Councilman Bird, to that point, this isn't a cost to the city. It's cost neutral for the city. It's a cost that's borne by the -- the contractors and the three year contract locks into pricing for that three years that it can't be increased. Bird: You're administrating this. Palmer: We are the recipient of -- Bird: Unless you're working free. It costs the city. Wages cost the city. Palmer: My time costs the city. Bird: Yeah. Palmer: Yes. Correct. De Weerd: Mr. Nary, how does that work? Meridian City Council Workshop December 9, 2014 Page 33 of 52 Nary: I guess I was trying to confirm something else. I'm sorry, I missed -- what was the question on -- what was the cost of what? De Weerd: Well, the three year contract and Mr. Bird said the preference would be not to go beyond a year by year. Nary: Yeah. I -- it should have -- it should have an annual clause for renewals for the -- the cost. So, we would -- it would end up being an annual basis anyway. We have to do it that way. So, we would have an annual accrual -- or, excuse me, an annual clause on the renewal in regards to the fee -- the cost, so that there isn't an additional beyond one year. Milam: Madam Mayor? Nary: So, I think all you have is -- well, what you should -- Chief Palmer said there is an ordinance. There is not an ordinance. There is a resolution that was intended to be on next week. It's not on today and it's not in the packet. Emily might have additional information. Milam: Madam Mayor? De Weerd: Mrs. Milam. Milam: As far as the cost goes, for the way I see it, to answer Councilman Bird's question, the initial expense is going to be probably in -- in putting the -- all of the information up front and, then, in the long run it seems like it would be a time saver cost savings to the city, because it's all going to be automated by the company and the contractors are paying the ten dollars, so to me I see it as a cost savings in the long run. Niemeyer: Madam Mayor, Members of the Council, if I could interrupt just briefly to I think answer Councilman Bird's question. The authority having jurisdiction is the fire department, it is our responsibility to insure these inspections are being done. Right now it's very difficult to do, because it's all self reporting and it's in various forms. So, Compliance Engine is a piece of software, a web based piece of software that these inspectors can go to, enter the data and that allows, as Chief Palmer indicated, a very easy dashboard to say how many inspections have been done. In other words, it's benchmarking something we are discussing heavily right now within the city leadership team. So, if we know we have 2,800, 3,000, 1,500, whatever that number is, businesses that need those hood inspections systems, the sprinkler inspection systems and the alarm system inspections, that gives us a very easy access to determine are we in compliance with that or not, hence the name Compliance Engine. So, the cost to the city as far as Chief Palmer's time, that would be here today and it has been, it will be here tomorrow, to insure those inspections are being done, but right now we have no good mechanism to gage are those inspections being done properly and in a timely manner. It also gives us a centralized point to look and see if there was an issue with the inspection -- now as we go out and follow up on that to insure the repairs were done, again, it's one database, one Meridian City Council Workshop December 9, 2014 Page 34 of 52 place to look, as opposed to several different ways of getting that data from the contractors. So, Chief Palmer's time was there yesterday, it will be there tomorrow, we are doing that -- this does give us an easy way to benchmark are we are achieving the goal of getting these done. Hopefully maybe that answers or clarified the question a little bit. Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: Yeah. I'm not doubting the inspections and stuff, because when we go out to inspect the building we don't run through a sprinkler system, because we are not capable of it. I don't think there has been a single guy in this room that's ever installed a sprinkler system. All I'm saying is I don't like to be tied down for three years for future Councils. If you want to have it on a yearly contract with an option, that's great with me. We have done it a hundred times and I just want to know if -- if the prices were based on a three year contract or if we could renew it every year. De Weerd: So, this sounds like it's on a three year contract. Does the price change if it's on a year by year? Palmer: Madam Mayor, it does have the potential. That was the reason why that was their standard was a three year, but we saw it as an advantage, because it would lock that price in for that three year period. It does have an out clause, like most contracts do, that we could exit out on a 60 day basis. We retain all that data. That belongs to us, even though it's on their cloud, but it does belong to us, so it's always our data that we -- we own and retain. But the primary reason for the three year was just to lock in that pricing. That was one of the concerns that the contractors had was because there is another company out there that raised their rates significantly and they didn't want to get caught in something like that, so -- Milam: Madam Mayor? De Weerd: Mrs. Milam. Milam: Can you find out -- is there -- is there a fee to cancel the contract? Palmer: No. Milam: Just a 60 day notice? Palmer: Yes. Milam: Okay. Thank you. De Weerd: Thank you, Perry. Meridian City Council Workshop December 9, 2014 Page 35 of 52 Palmer: Thank you. C. Public Comment: Compliance Engine —Web Based Reporting Software De Weerd: Item 8-C is a public comment on this very topic. I do have a gentleman that has signed up. James Bedal. Bedal. Bedal: Bedal. Yes. De Weerd: Sorry. Bedal: No. That's fine. De Weerd: If you will, please, state your name and address for the record. Bedal: My name is James Bedal and my address is 3604 Banner Avenue in Boise, Idaho. 83709. De Weerd: Thank you. Bedal: Thank you. Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: Before he starts his testimony. I did talk to Mr. Bedal today on the phone. He called me to ask what the procedure would be and I'm the one that -- I did talk to him, we did not talk anything other than I told him if he had a written thing to bring it -- eight copies and that was it. De Weerd: Thank you. Bird: We did not discuss anything about this. De Weerd: Okay. Bedal: Madam Mayor and Council, thank you very much for taking the time to hear my comments. Before I get started I would like to thank Chief Palmer. I had met with him a couple times on this topic and he's been very willing to listen and hear our concerns and, in fact, has been able to actually delay this vote at one point to get some more information. I'd like to briefly just go over what I have in front of you today. The companies I represent are Taylor Brothers Fire and Safety and Taylor Brothers, Incorporated. Our companies have been in the valley for over 50 years. We have a Meridian City Council Workshop December 9, 2014 Page 36 of 52 number of people in our company that are active board members, both locally and the Idaho Fire Protection Forum and the National Fire Equipment Distributors Association where we sit on the boards. I reviewed the Meridian 2011-2016 strategic plan and really applaud the Meridian Fire Department for identifying the importance to really manage risk reduction in keeping the community as safe as possible. To that end we must have visibility of inspection, testing, and maintenance reports from the property owner to the contractor and in this report I will refer to the contractor as a fire equipment distributor, which is who we are, and all the way back to the Idaho Insurance and Rating Bureau. I think Councilman Bird had mentioned the insurance companies have a large stake in this information. We, too, identified in 2006 that we have to have a better way of collecting, sorting, and submitting our inspection reports. In 2006 our company launched a software initiative. We spent over 250,000 dollars creating a tool that allow us to manage these reports. We have got hundreds of hours in the field working with this tool. Our current tool within a month we will be able to report digitally our information to AHJ's throughout the valley, throughout the country, to the Idaho Surveying Rating Bureau and to the property owners. As I listened to your IT -- I'm going to go off script a little bit. As I listened to your IT group I was really taken by a lot of the products that they created. The contact management software they created to manage the contracts that the city has. What we are talking about is we created such a tool for ourselves to manage our business we are sitting in front of is somebody telling us we can't use our tool that we spent hundred of thousands of dollars creating. What I want you to do is go use this tool and pay this company to use it. And that's why I'm here today. Many of my fellow fire and equipment distributors in the valley and nationally have invested money of their own to create a tool to collect and manage the inspection reports digitally. I'm confident that digital submissions are going to be a requirement throughout the country in the next ten years. All agencies will receive these digitally. I have no doubt in my mind. Compliance Engine is leading the way in that effort and I agree with that part. Just to quickly describe to you -- and I think there is a little confusion on exactly what is the process that goes on here. Local fire distributors, us, we go out and we do the inspections, we collect the data. We are the ones that put the boots on the ground, that are standing inside the business making sure that their sprinklers are compliant, their hoods are compliant, their suppression systems are compliant. We take and we report that -- we collect that data either on paper, we do it in software tools that we have created, we can also buy -- there is lots of software companies out there that create tools for us to collect the data. That's the data collection part. We are not talking about submission at this point, just how do I collect it. I will handwrite it or do it digitally. And, then, we submit that information to the AHJ's as they require. Some AHJ's don't require us to submit them to them at all, they just want the property owner to have them on site in paper form. It's law based on the standards that they have those reports. Some want us to submit them in a pdf. Some what us to submit them as a batch file. So, there is a variety of different ways to submit them. But that's our responsibility to do that and we do it very diligent at that. The distribution of the report is very important. The distribution of the report is ultimately what we are talking about here. Is that we corrected the data from the age -- and our job is to submit that report. The Compliance Engine, if you will, is an electronic scoreboard. Everything else is happening locally. So, basically, what we end up with us we have five components. We collect the data, we store the data, we share the data, and we analyze Meridian City Council Workshop December 9, 2014 Page 37 of 52 the data. The third party companies have simply an analyzing for the AHJ's to use and I think that that's great. The challenge that comes to the fire equipment distributor is financially as soon as we submit that report we have to pay the Compliance Engine. Every time we hit submit. We do hundreds of reports a month. That's a cash flow problem for small businesses. That money is out there. And now I have got to wait on average 42 days to get it back and so, then, there is a cash flow issue that goes on here. What we are doing -- if we go with the full compliance is the fire equipment distributors are, basically, forced to use a tool and pay for a tool that we have already designed and have ourselves. A third -party company -- in this case in Chicago has access to store our data that comes from Idaho. We have the exclusive conduit to the AHJ's to report. We like our relationships with the AHJ's. Now our relationship is through a company in Chicago. De Weerd: Can you summarize? Bedal: Yes. I will summarize. Thank you very much. Compliance Engine is a good tool. It allows us -- allows them to sell the tool to the City of Meridian -- excuse me. I have got that wrong. Compliance Engine has a good tool, allowing them to sell these tools and use -- let me just -- I will summarize here. The Compliance Engine is coming to you and they are offering you a free tool in exchange they are taking authority of the AHJ and forcing us to pay for an inspection fee to them. This isn't free to the community. It can only be called one thing and it's a tax and the tax is something that we have to levy onto the property owners and we are paying an outside state -- an outside agency to do that. I believe that we can solve this problem locally and I think my letter kind of outlines how we might be able to do that. If Meridian does this and we have a hundred percent compliance based on the numbers that Chief Palmer provided us, this would be around 72,000 dollars a year at a hundred percent compliance. If we do this in the valley we are talking over 280,000 dollars a year throughout the whole valley of these funds and they are not staying in Idaho and I think that if we take a little more time we will be able to do this. Under full disclosure I have taken our technology that we have developed and I have given it to a software company locally and I have asked them to develop a middle layer -- data layer and offer that to AHJ's throughout the country at no fee. I mean they can take that and they can create their own industry out of that. That would allow the Compliance Engine to go ahead and sell a product of value. If they have got a product of value to me as a fire equipment distributor, come to me and sell me a product of value and I will buy it from you if it's of value. And if they have a product of value to come and sell it to you as authority having jurisdiction. Don't give it away free. If you have a tool sell it to the authority having jurisdiction and the city and let them use that tool. Thank you for your time. Zaremba: Madam Mayor? De Weerd: Mr. Zaremba. Zaremba: If I'm understanding the problem in the first place, we are trying to find a way to get 1,300 people to report who are not currently reporting and I guess my question for Meridian City Council Workshop December 9, 2014 Page 38 of 52 you, since you seem to be close to the industry, do you have a suggestion for how we can do that? Bedal: Well, in the anecdotal data that I have nationally is that it's not that the reports aren't happening, the are not being done. The property owner is delaying it. They are not doing it, and so we don't have a nice way of calling up the City of Meridian and saying we did the inspection and they didn't take our bid, they won't fix it. We don't know if they are going to fix it with some other company or are they not going to fix it at all and what I have seen is where these products have been applied you get about a 30 to 35 percent jump in compliance or reporting simply by sending out the letter. Simply by sending out the letter saying you're due and it's coming from the fire department. So, there is definitely some very big positives in doing that. Bird: Any other questions, Council? Thank you, Mr. Bedal. Bedal: Thank you. Bird: We have nobody else. Is there anybody else in the public that would like to speak to this subject? Seeing none, Council, what -- we need to close the public hearing. Have we got a motion? Milam: Mr. Vice-president, I move that we close the public hearing -- is this a public hearing or a department report? Bird: On 8-C. Milam: 8-C. Public comment. Bird: Second. Cavener: Second. Bird: Okay. We have got a motion and a second to close the public comment on Item 8-C. All in favor say aye. Opposed by the same? MOTION CARRIED: FIVE AYES. ONE ABSENT. D. Public Works: Meridian Floodplain Administration & Community Rating System (CRS) Bird: Okay. Next one is Public Works on our flood plain administration and community rating system. That's Mr. David Miles. Miles: I want to be the first to say good evening, Members of the Council, Madam Mayor. Zaremba: Good evening. Meridian City Council Workshop December 9, 2014 Page 39 of 52 Miles: I will try to be brief and stay at the hundred thousand foot level as best I can. For all of you that were at the AIC conference this past week I will keep this either as riveting or more riveting than water rights, I promise. Anyway, I have got a short presentation for you tonight regarding Meridian flood plain administration program and an opportunity we have known as the community rating system. The community rating system is administered by FEMA to communities that exceed national flood insurance program standards and it's a voluntary program for the community to enter and some of the benefits which we will talk about throughout the presentation are that they offer insurance -- flood insurance, premium reductions to citizens and community members that are located in the community -- of a participating community of the CRS program. Currently Meridian is not in the program and we -- citizens that have flood insurance are not receiving a discount. But the short agenda for you, as I said, and we will try to stay at the highest level we can, not to bog down too many details, but we will go over some of the flood plain administration program responsibilities that I undertake as a flood plain administrator on a day-to-day basis. We will touch on the program status as it relates to the community rating system program and, then, we will talk about the community rating system program itself and I was feeling a little inadequate, I don't have any animation in my slide show tonight, but I do have lots of pictures and graphs, so hopefully that will suffice. As you have before you a list of the day-to-day things that I do as the flood plain administrator under the flood plain administration program -- I won't read through them all, but I will touch on some of the highlights. We are dealing in permitting development projects, enforcing the regulations, investigating any complaints, providing customer service, collaborating and conducting map studies and map revision with FEMA and other project engineers. In fact, we have a FEMA federal map revision coming for Nine Mile Creek very soon -- actually, I just got an update -- within the next two weeks we should have some preliminary data on that. So, it's quite a bit of information and oftentimes we do get questions that folks ask, so why are we in this program to begin with? What's the -- why do we have to do this, so to speak, and the program I'm referring to is the national flood insurance program. And to that we -- there are effects of not participating and I just wanted to touch on those effects really quick. If we were to not participate in the flood insurance program some of the impact that we would see as a community -- there would be not flood insurance -- federal flood insurance made available to the citizens in our community. There would be no federal mortgage insurance to properties that are located in the flood plain. There would be no federal grants or federal disaster assistance to properties that are in the flood plain. If there were to be a disaster the feds would not provide any disaster assistance. So, those are some of the benefits of being in the national flood insurance program and certainly one of the things that we would have to look at if we weren't in that program is liability to the city. You know, would we have to come up with an additional program to cover if there were a disaster in that area, how would we fund that, how would we take care of that. So, we kind of -- we trudge on and we participate in the national flood insurance program and we move forward. So, some of the program milestones that we have achieved recently and in light of the CRS program opportunity, are listed here on the -- on the slide before you and in relation to CRS, we knew we had to do at least two things to look at the CRS program and how it impacts Meridian. We knew we had to do what's known as a community assist visit -- basically an Meridian City Council Workshop December 9, 2014 Page 40 of 52 audit where FEMA comes to us and we happen to be in our cyclical process of that anyway, so that was initiated in 2011 and it was completed in 2013. So, we did that. We also knew that we needed to do some sort of impact analysis. What does CRS mean for Meridian? What would it mean administratively? What are the benefits? So, we did that as well. We have worked with our consultant Tetra Tech and we have those results throughout today's discussion. Excuse me. This evening's discussion. So, a couple of additional benefits that we got to undertake through those two processes. We have got to review our past and current practices and flood plain management. Obviously, we continue to administer the program and the regulations that we are supposed to administer. We resolved some outstanding issues that we had previously under our prior audits and we also, most importantly I feel, is that we strengthened our stakeholder relationships not only locally with folks like the irrigation districts, but at the state level with folks that IDWR, the Department of Water Resources, as well as regionally. We worked with FEMA regional representatives and been able to expand our reach and we talk with them on a day-to-day basis over issues that oftentimes can get, you know, lost in the minutia of details and -- we through our efforts we have been able to strengthen those relationships. As you see over on the right there is a couple of bullets in red that we are going to continue to talk about. So, if nothing else I have got four more bullets to talk about and if you see those in the upper right-hand corner we are almost done. So, why is CRS, the Community Rating System program, important to Meridian? Down in the bottom right you will see a chart and figure about disasters across the nation related to weather incidences and what you have is the fact that the number of incidences are increasing and the cost of damage of those incidents is also increasing and why is that important to Meridian? Well, if you don't know FEMA, because of these disasters, particularly in the last ten years with the likes of Hurricane Katrina, Super Strom Sandy, there was Hurricane Irene and several others as well. Those costs have impacted FEMA and FEMA is now in a budget deficit. FEMA has identified several ways to make up that deficit and, unfortunately or fortunately, depending on where you're sitting, one of the ways that they identified to make up those costs is by raising flood insurance premiums across the board. Higher premiums, more money to their coffers helps them in their program deficit. So, we felt at this time, knowing that, this was a good time for Meridian to look at the CRS program and see if it makes sense for Meridian to be able to kind of maximize our efforts and capitalize on our efforts that we are currently doing today and see if there is a way to benefit not only the city, but also the community members that are impacted by the flood plain. Some of the benefits that we have through that -- you know, our current standards that we currently enforce under the flood plain management rules help makes Meridian a desirable and safe community, taking credit for those community standards that we enforce will help us accumulate a percentage or a point, which I will get into further, to be able to pass those efforts and those points in a form of savings onto community members in the way of premium reductions. It also helps us maintain the flood plain areas as good stewards, not only to the environment, but also to the community members. Again, if we are passing on community savings by way of premium reductions, I think that's a good benefit to the community for things that we are already doing today. And, lastly, it also keeps our city viable and competitive in terms of economic development. There are other cities locally that have this program in place already, so we feel like having this program in place will continue to protect us in that economic development. So, our impact analysis. Meridian City Council Workshop December 9, 2014 Page 41 of 52 We took a look at where we are at today and in Meridian there is about 1,100 parcels that are impacted by the one year flood plain. Of those 1,100 parcels there is about 107 polices right now in force, for a total of just a little more than 73,000 annual flood insurance premiums and those policies insure approximately 21.6 million dollars worth of property. In our impact analysis we looked at our existing conditions and looked for any low hanging fruit that we might find for any potential next step that we could take and I have got that down on the right there and I will explain the point system of the program in a minute, but our existing conditions today would, essentially, level Meridian at what's known as a class level eight or a ten percent savings to community members that have flood insurance policies in place. We did identify some low hanging fruit by way of a public information flyer, as well as some increased activity that we already undertook through our kind of database management of customer service responses. When we get calls about the flood plain we keep track of those and we identified some things that we could do additionally and you will see that we are only 145 points away from the next class level up, which is a class level seen and I will talk about those more in a couple more slides. The class eight, class seven, points, CRS, what are we talking about? On the right you will see a chart there that lays out the essentials of the CRS program. It's, basically, a points program, it's calculated on points. The more points that a city earns in their flood plain administration, the lower the class level, therefore, the higher the insurance premium reduction that a community member receives that's located in the special flood hazard area. Again, it's a voluntary program that FEMA and the NFIP implement for communities that enforce higher standards than the minimum NFIP standards and the reason they do that is because it assists FEMA in their goals of reducing flood damage, increasing flood insurance awareness to the community and to help achieve a comprehensive approach to flood plain management throughout the city. And just for a comparison, I put down there in the lower left the breakout of Idaho communities that are in this program. Currently there is 22 communities in Idaho that are in the program. They range anywhere from a class level six to a class level ten and you will see there that I put the four local communities that are in the program here in the Treasure Valley and they have been in the program for a while and they are anywhere from a class six to a class eight. So, as I said a moment ago, our existing conditions in Meridian would allow us to be a class eight and I just wanted to touch briefly on how -- how that -- how we get to that class eight based on, you know, what is it that we do that gets to that eight. Most of our points are derived from our ordinance and our working with the hazard mitigation plan. We have standards that require elevating above the base flood elevation by two feet. We put a buffer on FEMA's boundary to account for any map inaccuracies. We require flood studies where no flood studies exist. And we do electronic permit tracking. We coordinate with our hazard mitigation plans and, again, we also do customer service and outreach. The graph down below shows that all of those things together -- 80 percent of the points that we would qualify for today come from our ordinance and come from our efforts in our hazard mitigation planning, which I thought was kind of interesting. The options that we could undertake to get to the next class level -- up a class level seven would be to develop a public information flyer and we would use that for public outreach, both here at City Hall and we could use that at -- on our internet services. We would also use that at public outreach events, like the Public Works and, then, we also identified that mailing that out to a targeted audience would afford us the Meridian City Council Workshop December 9, 2014 Page 42 of 52 necessary point to get to that next class level seven ranking. Additionally, there is a small component that we would do with our database tracking system where we would, basically, have to add two columns to our system that says not only what is the flooding source and who we have talked to and what was their question, but what is the base flood elevation and what are the water surface elevations in that area. It's a very simple fix I feel for things that I already do just to amend that chart to that next class level. There is a warning. There is a warning. As with any federal program there is always a paperwork burden that we have to undertake. It is manageable, however. I find it interesting that FEMA always puts a paperwork burden disclosure and tells you how long they think it's going to take you to fill out the form. That's always fun. Anyway, there is an initial audit review and it's, basically, approving of our record. We have to go through and fill out a paper application. FEMA signs off that we are ready to enter the program. An insurance specialist with FEMA comes down, looks at our paperwork, goes through our records, says, okay, are you doing X, Y and Z? Yes, you are. Great. They take that paperwork back, they rent it and score. So, all told it's about a six to eight month process just to get into the program. On top of that there is also an annual verification and there is also a cyclical recertification. So, annually, I would have to fill out the form that you will see there on the right. It basically quantifies how many buildings are in the flood plan, how many permits have you issued in any given year and some other statistics as well. That's followed up similarly in the five year certification. However, with the five year certification the insurance specialist comes back, says, okay, are you doing what you said you have been doing. That's the nuts and bolts of it. And, Mayor, for you for awareness, these documents that we completed in the department, you as the CEO would be required to sign them as well, so there is that component as well. So, I do have a recommendation based on all those findings. I believe that it's most advantageous for the city to enter the program and to strive to enter at a class level seven. As I said, we found that low hanging fruit to be a public information flyer, distributing that at a targeted mailing and upgrading our database management and I will talk to the targeted mailing of the flyer, because that's really the cost component. We have identified. We have identified funds in our existing budget where we think we can address some cost savings in that matter to cover that. We looked at with Finance Department a utility billing insert, but because of the number of accounts in the utility billing it came out slightly cheaper to do a targeted mailing and we feel that a targeted mailing would be more effective as well, because we are going to target people that are actually in the flood plain and people that actually work in the flood plain, rather than generating a potential 29,000 other requests of what is this document I just got? So, we feel like that's a more appropriate method. With the targeted mailing it's estimated to run us about 600 dollars a year to do that mailing of that and, as I said, we have identified in our budget we think we have the funds to handle that currently. Again, just to summarize this year's benefits really quickly. One, it helps us achieve our strategic initiative in our Public Works strategic plan for the environmental division. But more importantly, it's really about providing a service to the community for things that we are doing today as a city that we aren't required to do. FEMA recognizes that if a city is going above and beyond, which we have been for the last six years under our flood plain standards, that they will give a benefit under this community rating system program. And to pass those savings along to community members that are impacted by this, to me it seems like a very valuable thing to do for not a whole lot of extra effort. There is some Meridian City Council Workshop December 9, 2014 Page 43 of 52 staff time on my part, but it's things that I am already doing today and it's simply another thing that I would undertake as part of my role as a flood plain administrator. Most importantly I think it provides that community safety. It continues to encourage that, continues to educate the community and it continues to insure that we are being good stewards with our financial resources and passing on those savings for those efforts that we are doing. It protects our economic element locally here. We are competitive with other cities. So, those are some of the benefits that I find in the program. And we have got one more slide. Again, I'm recommending that we enter the program. It's in line with our strategic initiatives. It seems to have a decent benefit for not a lot of extra effort. I have talked with other local communities who are in it, they find that it's not vary impactful to them, save for the flood plain administrator, who you talk to when it's their site cyclical audit and they say, yeah, it's a couple extra hours of my time, but all in all the community is getting a cost insurance savings and that's worth it and the public good for the information that you're getting people. De Weerd: Well, David, I would say do it Miles: Great. I would be happy to answer any questions if you have any De Weerd: No. We are in full support. Miles: Great. De Weerd: Mr. Bird. Bird: Just for my own knowledge, of the 22 cities in Idaho that signed up, how many of them have had a -- has a major waterway run through it? Like Pocatello, Portneuf, and all them. Not how many of them have -- Miles: I would say -- I don't have the specifics. I would be happy to get them for you. Bird: No. Just off your head, what do you think? Miles: Probably half I would say. De Weerd: I appreciate your thoughtful approach to this, David, and I would agree that much of this you are already doing and it looks like the major cost is going to be 600 dollars in mailing and if you're standing in front of Council saying you can absorb that in your current budget, I think it's -- it's a no brainer; right? Miles: Right. Bird: Bring a resolution back. Zaremba: Go for it. Meridian City Council Workshop December 9, 2014 Page 44 of 52 Miles: I would be happy to do it. Bird: Let's do a resolution so it's all and done. De Weerd: Okay. You can figure out how to write that one up. Nary: Okay. Miles: Thank you very much for your support. Appreciate your support and your time for me. Thank you. De Weerd: Can't wait to read it. Thank you, David. Miles: You're welcome. E. Meridian Parks and Recreation Department: Rail With Trail Arterial Crossing Design Study Presentation by Project Engineering Consultants (PEC) De Weerd: And thank you for everything you do. Jay. Gibbons: Madam Mayor, Councilmen, I'm here before you today. Appreciate the opportunity to come and have my consultant on the Rail With Trail arterial crossing design study present to you their draft final report. As you know we have been working on that with Project Engineering Consultants out of Utah for the past six months. They have prepared a final report that we are taking some comments and reviewing. We wanted to come before Council and ask for your input and insight prior to finalizing, at which time, then, we will come back with -- I will come back with a resolution for the Council to affirm the results of this study and we will move forward with that. I am going to introduce Lars Anderson, he's with Project Engineering Consultants. They have extensive experience with Rail With Trail projects actually on the ground. They have completed a few and have more in the works in Utah. So, with that this is Lars. De Weerd: Thank you. And thank you for joining us, Lars. Anderson: Yes. Madam Mayor, Council Members, thanks for inviting us here today. We'd like to just go through some research that we have found in doing this study and, again, the focus on this study is not the actual alignment of the trail, but the crossings of the arterials. ITD was included. ACHD, COMPASS, were all included as -- during the study. If I remember how to do this right. I think I do that. Okay. So, the project overview. It started over on Black Cat and went over to Locust Grove Road. Did not include Eagle Road, because that one was a bigger chunk than we could take on for this. So, there was seven locations all together. And, again, we did look at alignments and we will show you some examples, but, really, the focus was on these arterials that you see here. This is an example of what we created. We created one -- a map like this for every intersection and in some intersections where it goes from an existing cross-section of two Meridian City Council Workshop December 9, 2014 Page 45 of 52 or three lanes and proposed to go to five lanes, we created as many as eight different alternatives for each intersection, because we included inside the railroad right of way for both north and south. Outside the railroad right of way north and south and, then, also for the five lane section, the future condition. So, there is a whole bunch of maps in this report. I have given some copies to Jay, but it's pretty thick and I didn't want to go through all of them with you, because you would be really bored. The idea here is that if UPR, DVR and WATCO that mange the railroad right now, if they allow the trail to be in the right of way, then, you know how it could cross. This is actually the condition that they would like to see, because it has less of a gap where people cross and, then, also the train crosses. So, this is their preferred, if you want to call it that, except they counter that and say they don't actually prefer to be in the right of way at all. So, I don't really know how to interpret that. De Weerd: They get recreational immunity if it is, so -- Anderson: Yes. This next one shows the same situation, but outside the right of way. So, you can see the challenge with that, because pedestrians would cross separated from the railroad and there is a distance of a hundred feet there and that's not ideal. But it is possible. If -- the main point here is if the railroad does not want you to have a trail in their right of way, you can still proceed with the trail. It's more expensive and you have to get easements, but it is possible. This shows the future expansion. One of the situations the railroad shared with us is they said the light rail transit was coming soon. They didn't really define what soon was, they just said that it was possible and so we looked at other light rail systems throughout the country and typically they have about a 25 foot offset from the freight line and so we showed here and showed how much additional width they would have in separation. The separation between the light rail and the proposed pedestrian trail is greater than the majority of Rail With Trail projects throughout the country and we will show you an example of those. Most of them are within 25 to 30 feet. This one is 50 feet away from the proposed light rail. Of course, the light rail could change a little bit in there, but you get the idea. The pedestrian trail would be significantly separated from any railroad. There we go. And this shows a cross-section of what it would look like. It's a 21 foot trail section, which means a one foot offset from property line, two foot shoulders on each side and a 16 foot -- did I add that up right? Yes. Sixteen foot paved section, which allows for two five foot bike lanes and a six foot multi-purpose lane. So, you get commuters that are not running into people that have strollers or are just walking their kids on bikes. There is a separation of uses there. This is really where it hits the road. The cost for existing road and, then, for the future five lane sections, if you are able to go inside the railroad right of way you can see the costs are significantly less than outside the right of way. That is mostly because outside the right of way we included the cost for you to purchase easements and that drilled up the cost quite a bit, as you can imagine. Also included in here are the future five lane road onlys would be a HOC signal. A pedestrian signal if -- if they crossed, a pedestrian could hit a button and it turns on red flashers for them, so that the motorists see them crossing and if that HOC signal is outside of the right of way, then, that adds another stop for the motorists in addition to the railroad stop. So, not ideal, but certainly doable and it's been done elsewhere. We were asked to look at some potential crossings of above and below grade for the five lane Meridian City Council Workshop December 9, 2014 Page 46 of 52 sections. This could also be used for Eagle Road if the study went to that area. These were not originally part of the arterial study. These were mostly just so you had a frame of reference of what it cost for an overpass or an underpass. The overpasses have some challenges in that they are typically switchbacks, as you can tell from this picture and so they are not really conducive to the bikers that -- and so the commuter bicyclists don't like these very much, because of the tight turns, whereas the underpass aren't really friendly to families and kids and it's a little challenging for them to want to go through an underpass sometimes where it's dark or -- and the vandalism and things like that you can see. So, both of them have their pros and cons. And you can see the overpass is generally less and that's because the underpass hits so many utilities, gas lines and water lines that you have to loop and it gets really expensive that way. Sorry. Okay. ITD helped -- I shouldn't say they funded the study, because they didn't really. They administered the funds that came from COMPASS and as part of that requirement, because they are federal funds, you have to look at all the environmental resources. So, we looked at wetlands. We looked at historical structures. And in red are the historical structures. There is quite a few of them, especially on Main Street. So, you get an idea of where those are concentrated. However, we were able to navigate our way through those and none of the historical structures will have a negative impact due to this project. The wetlands also are there and there are a couple canals that have wetlands associated, but, again, they could easily be -- you could easily align around them and no real issues to be concerned with. We just had to look at it. As well as probably your favorite graphs out there, the slick spot cover graph, we had to look at and see if there was any out there. We didn't find any, but they make you do that, as well as all the other things that say no effect. There was a lot of looking. This is what Madam Mayor talked about, the -- the statute about recreation and we shared this with the railroad. They took comfort, but not a lot in this. They said they would have to look into it further and so this in red highlights that, the landowner being the railroad owner, doesn't have any liability if someone is injured on a Rail With Trail. We did want to share with you a recent federal highway study that was done in 2013 where they found up to 2011 almost 1,600 deaths in corridors from trespassers. With Rail With Trail they only found one death and that was in Bellingham, Washington, where a young woman crossed through the guards and the lights and people that were standing there, still went through there and was hit by the train and so sometimes you just can't design enough to keep someone from doing that and yesterday in Utah a bicyclist saw the lights, saw the guards down, still went through the guards and was hit and killed by the train. So, sometimes you just -- that kind of thing, unfortunately, happens, but the Rail With Trail systems you don't see that very much, because they have positive fencing and crossings that prevent that. De Weerd: What an awesome slide. Anderson: Do you think that helps? De Weerd: Yes. Thank you. Anderson: Yeah. And it's federal highways that came up with this. So, it's not, you know, some group that's trying to promote it so much as federal highways. And, then, this talks Meridian City Council Workshop December 9, 2014 Page 47 of 52 about that one fatal -- fatal and two injuries on Rail With Trails in 20 years, where it happened. I do want to point out that last point, that a lawsuit was filed and the railroad and trail manager were not found to be liable. Neither one was found liable for that. There is a lot of Rail With Trails -- not Rail To Trail conversions, they are different. Rail to Trail means they remove the railroad and put a trail on top of it. These are Rail With Trails and there is 88 trail managers. There are over 140 trails throughout the country. Eighty- eight managers had seven claims filed against them and none of them were filed against the actual railroad. These are for trail conditions. In no case were they found liable -- was the railroad found liable -- was the railroad found liable for any of the situations along the Rail With Trails. Even when it says -- even when the gate was left open by the railroad they still weren't found liable -- negligent because of their immunity. Another system here where it shows Rail With Trail. They often provide safe alternatives, they provide fencing, and they provide a lot more eyes along the trail, so you have less vandalism, you have more safety, they improve the situation. Of course convincing the railroad of that is a challenge. This one is interesting. It shows all the different Rails With Trails in the different states. The two in Utah our company actually designed both of those and we are designing a third one right now and they have proven very successful, very popular and with the same owners that you have here. The difference are the operators of the railroad here are different, so -- De Weerd: It looks like Idaho and Michigan are kind of the outliers, uh? Anderson: Yeah. You do have a Rail To Trail up in -- Bird: Moscow. Anderson: Yeah. De Weerd: Oh, no. Coeur d'Alene. Bird: Coeur d'Alene. Kellogg. Anderson: This is -- this is an interesting slide where it shows that the before development a lot of the railroad owners had an attitude -- a negative attitude towards the trail and, then, that changed after the trail was developed. So, a few are opposed, but they are trying to pass the negative feelings, but they weren't as opposed as -- after as they were before. And this shows the distance between the track that I alluded to in the slide earlier, that the majority are between 11 and 20 feet. The next courses are 31 to 50 feet. We fall in that last category of below five percent, 51 to 75 feet away. There is just a lot of space out there. There is a lot of room. It's a 200 foot wide corridor. This shows some other examples. Pennsylvania and Oregon and it shows sometimes the rail -- the trail is very close to the railroad track, with a short -- the picture in the lower right-hand corner, that's a short four foot chain link fence and other times it meanders through a linear park, just depends on the situation. So, lots of trails out there that are just like the one that's being proposed here. This one is the most impressive, because they actually created a system where they -- they rent bikes and the railroad will drop people off and, Meridian City Council Workshop December 9, 2014 Page 48 of 52 then, they ride the bikes back and it's created a six million dollar industry in their town that they otherwise didn't have. So, economic benefit as well. And it's a freight train. They have a separate train that they carry the bikes on it. A separate car. And this one is interesting, because if you ever thought there would be liability it would be with an electrified track. This one has a third electrified track running along it with just a simple fence and they have had no deaths there. So, if someone touches the electrified track they would instantly be electrocuted and they have had zero deaths with that with the trail right next to it. So, you can't say -- nothing is foolproof, but these are not -- you're not creating a hazard by putting a trail in the right of way. And this shows that in this case it was just a 12 foot wide trail with a very short fence. What's interesting here is they are able to buy the easement from the railroad company for 750,000 dollars for the -- and with the stipulation that it had to be 20 feet away from the railroad and so they were able to build their trail in Columbus, Ohio. And this one shows one in Fort Collins where -- this was interesting, because they had 11 to 20 trains per day -- a large number of trains traveling at 30 to 40 miles per hour and they still were able to build the trail without any conflicts. And, lastly, this shows more of an urban condition that could be in your downtown where they don't have any positive separation between the trail and the tracks, yet it is a very popular trail where they have, you know, trail days and all kind of events along the trails. That's our presentation. Do you have any questions? De Weerd: Thank you so much. Council, any questions? Bird: No. Just a great report. De Weerd: Yeah. Milam: Very interesting. Thank you. Bird: Thank you very much. De Weerd: Where were you a couple years ago. Gosh. Exciting stuff. Borton: Madam Mayor? De Weerd: Mr. Borton. Borton: Real quick. Have you -- have you found a common cited statistic by rail operators which maybe contradicts what you have provided that explains the opposition? Anderson: No. No. Not anything that's based in -- they haven't shared any facts with us. It's all more anecdotal. Borton: Okay. Thanks. De Weerd: Thank you. Meridian City Council Workshop December 9, 2014 Page 49 of 52 Anderson: Okay. Thank you Gibbons: Madam Mayor, just as a quick follow up. I will note that we gave this presentation to the parks commission last month at their -- their monthly meeting. I gave it to the -- our Meridian Transportation Commission last Monday on the 1st of December. We had a lot of input from -- from that committee. They were very in tune. Next Thursday I have a presentation with the RTEC committee at COMPASS, so -- and there could be a COMPASS board to follow that. That depends, but -- so, we are getting this out there. We will see where it goes. We will continue to work with the railroad and looking for community partners and see what we can accomplish with that. De Weerd: Thank you, Jay. And thank you again, Lars. Zaremba: Madam Mayor? De Weerd: Yes, Mr. Zaremba. Zaremba: This is kind of a side issue, but some of you may know that COMPASS had planned a presentation by Union Pacific Railroad for tomorrow at 3:00 or 3:30, something like that. It has been postponed indefinitely. It's not going to happen tomorrow. Apparently the presenter can't make it, but -- De Weerd: Was it Dan Harbeke? Zaremba: -- that's a shame, because I was looking forward to that and they have not picked an alternate date for it. I'm sorry, what was your question? De Weerd: Who was supposed to present? Zaremba: Somebody from the Union Pacific Railroad was going to talk about their plans. De Weerd: It looks like Dan Harbeke is going to be leaving or transferred to Houston or somewhere in Texas, so -- which is unfortunate. He's been -- he's really helped improve the communication. I wonder if that had an influence to it. Zaremba: That name sounds familiar. It might have been. De Weerd: He's their government affairs person. Zaremba: Yeah. F. City Council Liaison/Committee Updates De Weerd: So -- okay. Okay. Thank you again. Okay. Council, any reports? Bird: Madam Mayor? Meridian City Council Workshop December 9, 2014 Page 50 of 52 De Weerd: Mr. Bird. Bird: Just the Police Department, which the chief will -- next month or so will bring forward his new realignment and promotions for the people, but our remodel and our new building out there is going well. The Police Department got to find out how some subcontractors work and where they get rid of all their trash when they get -- when they don't want to haul it off. Between the walls, so -- other than that it's doing pretty good. I haven't heard Bill complain, so I guess legal is doing -- Michelle is keeping legal in line, so -- that's mine. Milam: Madam Mayor? De Weerd: Mrs. Milam. Milam: Let's see. HR -- they are working on modules for open enrollment, so next year we should all be able to -- we will all get into our own stuff, instead of doing paperwork, and if you haven't met Jessica, she's the new admin assistant and she's really sweet and you should all go meet her. And she's also -- she's going to be facilitating some strength training programs throughout the city in different departments. Fire Department -- on next Wednesday, the 17th, is their promotional ceremony here at 6:00 o'clock and they would like as many people to show up as possible. Arts Commission is right now having their open house upstairs, so as soon as this meeting is over everybody should go upstairs and check out the new art exhibit. De Weerd: Thank you. Cavener: Madam Mayor? De Weerd: Mr. Cavener. Cavener: I will be brief. We had the information services presentation tonight and I think they did a great job of covering things. We alluded to it during Patrick's presentation, that Patrick is leaving the Parks Department and I know he is leaving a -- a big void in that department, but I'm excited -- when the previous person in that position left they found someone great and I remain confident that the next person they bring will be great. De Weerd: Thank you. Mr. Borton. Borton: Madam Mayor. I meet with Tom tomorrow, so I will have a better story tomorrow and the latest and greatest. But we have heard about the community rating system with Public Works. One of the things a bit more current is budget stuff with Finance and among things we are looking at and discussing a participatory budget component potential, which is another interesting way to get more public input and participation and having some greater impact on a portion of the budget and so it's something that came back from the National League of Cities, so I have given -- I got a book that I have given to Stacy, she is reading it and tolerating me. I will talk more about that. So, that will come Meridian City Council Workshop December 9, 2014 Page 51 of 52 back probably more in January with a little more detail in what that means and what the opportunity for the Council could be well in advance of the budget calendar, so -- De Weerd: Mr. Zaremba. Zaremba: My liaison department, Development -- Community Development is continuing to do its regular outstanding work. The committees that I belong to are trucking along pretty much the same. I guess the news is everybody is doing well. Item 10: Future Meeting Topics De Weerd: That's good news. Okay. Anything under future topics for the agenda? If not, I would entertain a motion to adjourn. Zaremba: So moved. Holman: Madam Mayor? De Weerd: Yes. Holman: There is an ordinance on the other -- De Weerd: Oh, that's right. Sorry. Zaremba: Unmoved. Item 9: Ordinances A. Ordinance No. 14-1634: An Ordinance (RZ 13-010 — Three Corners Subdivision) For The Re -Zone Of A Three Parcels Of Land Located In The NW'/4 Of The NW'/4 Of Section 29, Township 4 North, Range 1 East, Boise Meridian; Establishing And Determining The Land Use Zoning Classification Of C -C (Community Business District), R-4 (Low Density Residential), And R-8 (Medium Density Residential) Zoning Districts In The Meridian City Code; And Providing An Effective Date De Weerd: Madam Clerk, will you, please, read this ordinance by title only. Holman: Thank you, Madam Mayor. City of Meridian Ordinance No. 14-1634, an ordinance RZ 13-010, Three Corner Subdivision, for the rezone of three parcels of land located in the northwest one quarter of the northwest one quarter of Section 29, Township 4 North, Range 1 East, Boise meridian, City of Meridian, Ada County, Idaho. Establishing and determining the land use zoning classification of C -C, Community Business District; R-4, Low Density Residential, and R-8, Medium Density Residential Zoning District, in the Meridian City Code. Providing that copies of this ordinance shall be filed with the Ada Meridian City Council Workshop December 9, 2014 Page 52 of 52 County Assessor, the Ada County Recorder, and the Idaho State Tax Commission as required by law and providing for a summary of the ordinance and providing for a waiver of the reading rules and providing an effective date. De Weerd: You have heard this ordinance read by title. I don't see anyone who would like to hear it read in its entirety, so do I have a motion? Bird: Madam Mayor? De Weerd: Mr. Bird. Bird: I move we approve Ordinance No. 14-1634 with suspension of rules. Milam: Second. De Weerd: I have a motion and a second to approve. Madam Clerk, will you call role. Roll Call: Bird, yea; Rountree, absent; Zaremba, yea; Borton, yea; Milam, yea; Cavener, yea. De Weerd: All ayes. Motion carried. MOTION CARRIED: FIVE AYES. ONE ABSENT. De Weerd: Okay. Now I would entertain a motion to adjourn. Bird: So moved. Zaremba: Second. De Weerd: All those in favor? MOTION CARRIED: FIVE AYES. ONE ABSENT. MEETING ADJOURNED AT 5:52 P.M. 5 ECORDING O7D- THESE PROCEEDINGS) 4 MAYOR T De WEDATE APPROVED tel""\i`I il'A[ICU�. ATT ST: 5 w n � City oe CEE 1011FAAWeITY CLERt � Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: 4A PROJECT NUMBER: ITEM TITLE: APPROVE MINUTES Approve Minutes of November 25, 2014 City Council Meeting MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: 4B PROJECT NUMBER: ITEM TITLE: APPROVE MINUTES Approve Minutes of December 2, 2014 City Council Meeting MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: PROJECT NUMBER: AZ 14-01 ITEM TITLE: JUMP CREEK Findings of Fact, Conclusions of Law for Approval: AZ 14-011 Jump Creek by Northside Management Located Northwest Corner of N. Black Cat Road and W. McMillan Road Request: Annexation of Approximately 86.06 Acres from RUT in Ada County to the R-8 (Medium Density Residential) (64.63 Acres) and R-15 (Medium High -Density Residential) (21.43 Acres) Zoning Districts MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: 4D PROJECT NUMBER: PP ITEM TITLE: JUMP CREEK Findings of Fact, Conclusions of Law for Approval: PP 14-013 Jump Creek Located Northwest Corner of N. Black Cat Road and W. McMillan Request: Preliminary Plat Approval Consisting of 318 Single Family Residential Lots, 2 Multi -Family Lots and 42 Common Lots on Approximately 85.9 Acres in the Proposed R-8 and R-15 Zoning Districts MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER �E IDR IAN,=-- �J In the Matter of the Request for Annexation and Zoning of 86.06 Acres of Land with an R-8 and R- 15 Zoning Districts and Preliminary Plat Consisting of 318 Single -Family Residential Building Lots, 2 Multi -family Lots and 42 Common Lots on 85.9 Acres of Land for Jump Creels Subdivision, Generally Located on the Northwest Corner of W. McMillan Road and N. Black Cat Road, by Northside Management. Case No(s). AZ -14-011; PP -14-013 For the City Council Hearing Date of. November 25, 2014 (Findings on December 9, 2014) A. Findings of Fact 1. Hearing Facts (see attached Staff Report for the hearing date of November 25, 2014, incorporated by reference) 2. Process Facts (see attached Staff Report for the hearing date of November 25, 2014, incorporated by reference) 3. Application and Property Facts (see attached Staff Report for the hearing date of November 25, 2014, incorporated by reference) 4. Required Findings per the Unified Development Code (see attached Staff Report for the hearing date of November 25, 2014, incorporated by reference) B. Conclusions of Law 1. The City of Meridian shall exercise the powers conferred upon it by the "Local Land Use Planning Act of 1975," codified at Chapter 65, Title 67, Idaho Code (I.C. §67-6503). 2. The Meridian City Council takes judicial notice of its Unified Development Code codified at Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has, by ordinance, established the Impact Area and the Amended Comprehensive Plan of the City of Meridian, which was adopted April 19, 2011, Resolution No. 11-784 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § I I -5A. 4. Due consideration has been given to the comment(s) received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. 5. It is found public facilities and services required by the proposed development will not impose expense upon the public if the attached conditions of approval are imposed. CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). AZ -14-011; PP -14-013 -l- 6. That the City has granted an order of approval in accordance with this Decision, which shall be signed by the Mayor and City Clerk and then a copy served by the Clerk upon the applicant, the Planning Department, the Public Works Department and any affected party requesting notice. 7. That this approval is subject to the Conditions of Approval all in the attached Staff Report for the hearing date of November 25, 2014, incorporated by reference. The conditions are concluded to be reasonable and the applicant shall meet such requirements as a condition of approval of the application. C. Decision and Order Pursuant to the City Council's authority as provided in Meridian City Code § 11 -SA and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's request for annexation and zoning and preliminary plat is hereby approved with the requirement of a development agreement containing the conditions of approval in the attached Staff Report for the hearing date of November 25, 2014, attached as Exhibit A. D. Notice of Applicable Time Limits Notice of Preliminary Plat Duration Please take notice that approval of a preliminary plat, combined preliminary and final plat, or short plat shall become null and void if the applicant fails to obtain the city engineer's signature on the fmal plat within two (2) years of the approval of the preliminary plat or the combined preliminary and final plat or short plat (UDC 11-613-7A). In the event that the development of the preliminary plat is made in successive phases in an orderly and reasonable manner, and conforms substantially to the approved preliminary plat, such segments, if submitted within successive intervals of two (2) years, may be considered for final approval without resubmission for preliminary plat approval (UDC 11-613-713). Upon written request and filed by the applicant prior to the termination of the period in accord with 11-613-7.A, the Director may authorize a single extension of time to obtain the City Engineer's signature on the final plat not to exceed two (2) years. Additional time extensions up to two (2) years as determined and approved by the City Council may be granted. With all extensions, the Director or City Council may require the preliminary plat, combined preliminary and final plat or short plat to comply with the current provisions of Meridian City Code Title 11. If the above timetable is not met and the applicant does not receive a time extension, the property shall be required to go through the platting procedure again (UDC I I - 6B -7C). Notice of Two (2) Year Development Agreement Duration The development agreement shall be signed by the property owner and returned to the City within two (2) years of the City Council granting annexation and/or rezone (UDC 11-513-31)). A modification to the development agreement may be initiated prior to signature of the agreement by all parties and/or may be requested to extend the time allowed for the agreement to be signed and returned to the City if filed prior to the end of the two (2) year approval period (UDC 11 -5B -3F). CITY OF MERIDIAN FINDINGS. OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASENO(S). AZ -14-011; PP -14-013 -2- E. Notice of Final Action and Right to Regulatory Takings Analysis 1. The Applicant is hereby notified that pursuant to Idaho Code 67-8003, denial of a development application entitles the Owner to request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. 2. Please take notice that this is a final action of the governing body of the City of Meridian. When applicable and pursuant to Idaho Code § 67-6521, any affected person being a person who has an interest in real property which may be adversely affected by the final action of the governing board may within twenty-eight (28) days after the date of this decision and order seek a j udicial review as provided by Chapter 52, Title 67, Idaho Code. Attached: Staff Report for the hearing date of November 25, 2014 CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). AZ -14-011; PP -14-013 -3- By action of the City Council at its regular meeting held on the 2014. CK•1•kilo] II10IMD)dkiYloom &INnIa0110zYY:7•Id COUNCIL VICE PRESIDENT KEITH BIRD COUNCIL MEMBER JOE BORTON COUNCIL MEMBER LUKE CAVENER COUNCIL MEMBER GENESIS MILAM MAYOR TAMMY de WEERD (TIE BREAKER) Mayor Tamm e eerd day of (y[ cc kr4-Q,�'L5 VOTED VOTED VOTED_ f� VOTED VOTED VOTED VOTED Copy served upon Applicant, The Planning Division, Public Works Department and City Attorney. By: ! v C A" " til Dated: 1"'—I()-14 City Clerk's Office CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). AZ -14-011; PP -14-013 4- STAFF REPORT Hearing Date: TO: FROM: SUBJECT: November 25, 2014 (Continued from November 5, 2014) Mayor and City Council Bill Parsons, Associate City Planner 208-884-5533 Bruce Freckleton, Development Services Manager 208-887-2211 Jump Creek Subdivision — AZ -14-011 and PP -14-013 L SUMMARY DESCRIPTION OF APPLICANT'S REQUEST IDIAN;--- The applicant, Northside Management, has requested approval of the following applications: ➢ Annexation of approximately 86.06 acres from the RUT zoning district in Ada County to the R-8 (Medium Density Residential) (64.63 acres) and R-15 (Medium-high Density Residential) (21.43 acres) zoning districts and; Preliminary plat (PP) approval consisting of 318 single family lots, 2 multi -family lots, and 42 common lots on approximately 85.4 acres in the proposed R-8 and R-15 zoning districts. See Section IX of the staff report for more information. II. SUMMARY RECOMMENDATION Staff recommends approval of the proposed AZ and PP applications in accord with the conditions of approval in Exhibit B and the Findings of Fact and Conclusions of Law in Exhibit D. The Meridian Planning and Zoning Commission heard these items on October 2, 2014. At the public hearing, the Commission voted to recommend approval of the subject AZ and PP requests. a. Summary of Commission Public Hearing: I. In favor: Scott Noriyuki ii. In opposition: None iii. Commenting: Max Steinbach iv. Written testimony: Scott Noriyuki and Becky McKay v. Staff presenting application: Bill Parsons vi. Other staff commenting on application: None b. Key Issue(s) of Discussion by Commission: i. Timing for the construction of the sidewalk along N. Black Cat Road between W. Malta Drive and W. Daphne Street. ii. Timing for the construction of W. Malta Drive (collector street). iii. The determining factors on the phasing of the project. iv. Reviewing and verifying compliance with the submitted home elevations. C. Key Commission Change(s) to Staff Recommendation: i. Commission modified DA provision F and condition of approval 1.2.1d to allow a portion of W Malta Drive to be constructed with the approval of the 123rd residential lot. it. Commission modified DA provision C to allow a portion of the sidewalk required with the first phase to be constructed as an interim asphalt walkway and extruded curb along the west shoulder of N. Black Cat Road. d. Outstanding Issue(s) for City Council: Jump Creek Subdivision— AZ-14-Ol land PP -14-013 PAGE 1 IMMUNE I. None Baring. the Council approved the subject AZ and PP regu 1.Summary of City Council Public Hearing• L In favor: Scott Noriyuki, Shawn Brownlee I 'i In opposition None iiL Commenting: Bob Arnold Paul and Gavle Poorman Max Steinbach Michael Watts and Ken Arendse iy, Wrjtteu testimony: Scott NorLyuki L Staff presenting application: Bill Parsons and Bruce Freeldeton A Other staff commenting on application: Caleb Hood L Kev Issues of Discussion by Council: L High groundwater in the area iL Including the multj-family in the marketing materials for the Iumn Creek project. iii, Timing for the construction of the sidewalk along N Black Cat Road between W Malta Drjve and W. Daphne Street. jy, Specific details of the proposed multi -family deyelunments y, Conversion of thecentral access to a pedestrian connection. yL Maintaining surface water delivery to the adjacent properties andap rticipating the maintenance of drainage ditches within and near the boundaries of the Jump Creels property. vii• Timing of the arterial roadway and the McMillan/Black Cat intersection improvements. yiii, Findings of the geo-technical report and the reasons for water in crawl spaces of the homes. g, K" Council Changes to Staff/Commission Recommendation L Incorporated the multj-family elevations in tite DA (DA provision D): 1L Council added a DA provision H reguirjng the developer to notify future homeowners of the proposed multi -family developments in the marketing literature including posting the multi -family lots with signage The multi-famdv lots must also remain free of weeds i At the public hearing, the applicant agreed to work with adjacent pjoaerty owner (Poorman's) on the water dehyery and maintenance of the existing drainage facilities (DA provision—GI iy, The Council (DA provision D required the applicant to follow the hest practice guidelines attached in the GeoTech letter to Council and the grgnndwater recommendation letter. dated November 18 2014, III. PROPOSED MOTION Approval After considering all staff, applicant and public testimony, I move to approve File Numbers AZ -14- 011 and PP -14-013 as presented in the staff report for the hearing date of November 25, 2014, with the following modifications: (Add any proposed modifications). Denial After considering all staff, applicant and public testimony, I move to deny File Numbers AZ -14-011 and PP -14-013, as presented during the hearing on November 25, 2014, for the following reasons: (You should state specific reasons for denial) Jump Creek Subdivision —AZ -14-01 land PP -14-013 PAGE 2 EXHIBIT A Continuance I move to continue File Numbers AZ -14-011 and PP -14-013 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance.) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: The site is generally located on the northwest corner of W. McMillan Road and N. Black Cat Road in the SE '/4 of Section 28, Township 4N, Range 1W. (Parcel #'s: 50428143000; S0428410000; S0428449010 and SO428449800) B. Owner(s): JRL Properties 2358 S. Titanium Place Meridian, Idaho 83642 C. Representative: Scott Noriyuki, Northside Management 6810 Fairhill Place Boise, ID 83714 D. Applicant's Statement/Justification: Please see applicant's narrative for this information. V. PROCESS FACTS A. The subject application is for an annexation and preliminary plat. A public hearing is required before the Planning and Zoning Commission and City Council on this matter, consistent with Meridian City Code Title 11, Chapter 5. B. Newspaper notifications published on: September 1, and 15, 2014(Commission); October 17, and 31, 2014 (Council) C. Radius notices mailed to properties within 300 feet on: August 28, 2014 (Commission); October 31,2014(Council) D. Applicant posted notice on site(s) on: September 8, 2014 (Commission); October 27, 2014 Council VI. LAND USE A. Existing Land Use(s) and Zoning: The properties are currently being farmed and consist of a single family residence and several outbuildings, zoned RUT. B. Character of Surrounding Area and Adjacent Land Use and Zoning: 1. North: Oaks North Subdivision, zoned R-15 2. East: Volterra North and Bainbridge Subdivisions and county residences, zoned R-4, R-8 and RUT 3. South: County residence and Oakcreek Subdivision, zoned RUT and R-8 4. West: Oaks North Subdivision, zoned R-4 and R-8 C. History of Previous Actions: NA D. Utilities: Jump Creek Subdivision— AZ -14-011 and PP -14-013 PAGE 3 EXHIBIT A 1. Public Works: a. Location of sewer: Sanitary sewer service to this development is master planned to flow to the existing Black Cat Trunk. b. Location of water: Water service to this development is master planned to come from mains that would need to be constructed from existing mains in Black Cat Road as well as McMillan Road. Due to fire flow requirements the applicant will need to construct a 12 -inch diameter main from the intersection of N Black Cat Road and McMillan Road heading east to the existing 12 -inch diameter main near the Ten Mile & McMillan intersection. A Pressure Reducing Station vault and conduits for power and telemetry cabling will need to be installed between Pressure Zone 1 and 2, in the McMillan Road mainline, before required fire flow will be available. The installation of the pressure reducing appurtenances shall be the responsibility of the Meridian Public Works Department. Applicant shall coordinate the vault and conduit design criteria with the Meridian Public Works Department as part of the development plan review process. Thi: connection will need to be installed with phase one of the applicant's plan, and may be eligible for partial reimbursement. If the 12 -inch water main and PRV are installed by another developer prior to phase one construction, the applicant will not be responsible to participate in construction of the required main extension, however may be responsible for the payment of a proportional reimbursement if such an agreement exists. c. Issues or concerns: The timing of the construction of a new municipal well in the Oaks development can take as much as three -years. Because of the complex nature of water delivery in this area, each phase of the development will require modeling analysis. Results of this modeling may necessitate additional water main connections to ensure fire flow needs are met. A Pressure Reducing Valve will need to be installed between Pressure Zone 1 and 2, in the mainline yet to be installed in McMillan Road, before required fire flow will be available. E. Physical Features: 1. Canals/Ditches Irrigation: The Creason Lateral, the East Tap Sublateral and various other waterways transverse the subject property. 2. Hazards: Staff is not aware of any hazards that exist on these properties. 3. Flood Plain: None of the subject properties are located within the flood plain. F. Summary of Proposed Streets and/or Access: The applicant is proposing to construct numerous public streets and extend several stub streets as part of this project (see section 9 for analysis). VII. COMPREHENSIVE PLAN POLICIES AND GOALS The Jump Creek property is designated "Medium Density Residential" (MDR) on the future land use map. The MDR designation allows smaller lots for residential purposes within City limits. Uses may include single-family homes at densities of 3 to 8 dwelling units per acre. The plat consists of 318 single-family residential building lots at a gross density of 3.92 dwelling units per acre which is at the low end of the desired density in the MDR designated area. The applicant is also proposing to plat two (2) multi -family lots which conceptually depict nineteen (19) four-plex structures on approximately 4.89 acres. Gross density for this portion of the development is anticipated at 15.5 dwelling units to the acre which is slightly higher than the gross density of the requested R-15 zone. When combined, the overall gross density is approximately 4.59 dwelling units to the acre which is consistent with the MDR land use designation. Jump Crcck Subdivision— AZ -14-01 r and PP -14-013 PAGE 4 iWOU2111I0r_� Staff finds the following Comprehensive Plan policies to be applicable to this application and apply to the proposed development of these properties (staff analysis in italics; comp. plan reference in parenthesis): • "Support a variety of residential categories (low-, medium-, medium-high and high-density single-family, multi -family, townhouses, duplexes, apartments, condominiums, etc.) for the purpose of providing the City with a range of affordable housing opportunities." (3.07.01E) Tire applicant is proposing to develop a mixed use residential development consisting of primarily medium density single-family and multi family units consistent with this goal. The multi family developments will be evaluated with fuhme conditional use permit applications. • "Provide housing options close to employment and shopping centers." (3.07.02D) The proposed development will provide housing opportunities in close proximity to a proposed Wahnart and an existing shopping center at the northeast corner ofChinden Boulevard and Linder Road. Future employment uses are planned a mile east of the proposed subdivision along the west side of N. Ten Mile Road. • "Require new residential development to meet development standards regarding landscaping, signage, fences and walls, etc." (3.05.02C) Street buffer landscaping is required adjacent to N. Black Cal Road, W McMillan Road and W. Malta Drive in accord with the standards listed in UDC 11 -3B -7C. Separate permits shall be obtained for signage and fencing in compliance with the standards listed in UDC 11-3D-5 and 11-3A-7 respectively. • "Protect existing residential properties from incompatible land use development on adjacent parcels." (3.06.0117) The only developed property in the area is the Bainbridge and Oakereek Subdivisions located on the east side of Black Cat Road and the south side of McMillan Road. The remainder of the area is primarily being farmed and includes rural residential land uses. The proposed project will certainly change the dynamic on the f•inge, from rural to urban, however much of the area is designated nedizon density on the FL UM and staff anticipates similar densities developing on the adjacent properties in the f rtu•e. Additionally, the proposed subdivision is developing at the lower end of the density spectrum for medium density developments and should be compatible ivith the existing rural residences in this area. "Require common area in all subdivisions." (3.07.02F) The applicant is required to provide a minimum of 10% qualified open space as set forth in UDC 11-3G-3. The Jump Creek -plat depicts plats 15.73% (or 13.54 acres) ofcommon open space. The proposed subdivision appears to be in compliance with the open space standards setforth in UDC 11-3G. • "Permit new development only where urban services can be reasonably provided at the time of final approval and development is contiguous to the City." (3.01.01F) City services are required to be extended to the properties upon development in accord with UDC 11-3A-21. • "Require street connections between subdivisions at regular intervals to enhance connectivity and better traffic flow." (3.03.03C) With this subdivision, the applicant is proposing multiple street and pedestrian connections. ACHD is currently analyzing the traffic study for this development to determine the impacts to the existing roadways and what improvements will be required with the development of the Jump Creek Subdivision — AZ -14-01 land PP -14-013 PAGE 5 subdivision. Per the Master Street Map (MSM), the applicant is providing the required collector street however; it is proposed to be constructed with a later development phase. • "Require pedestrian access connectors in all new development to link subdivisions together to promote neighborhood connectivity as part of a community pathway system." (3.03.0313) The applicant is proposing an internal pathway system for the proposed development. With the approval of the Oaks North development (west boundrvy), two (2) pathways were approved to stub to this property. The first pathway is approved on the southern boundary of the proposed collector street and the second stubs to the west boundary of Lot 8, Block 13. The plan as submitted does not show the extension of the two (2) pathways. These pathways must be extended into the site to further enhance connectivity behveen both developments. • "Reduce the number of existing access points onto arterial streets by using methods such as cross access agreements, access management and frontage/backage roads." (3.03.021) The submitted plat depicts three access points to N. Black Cat Road and no access is proposed to W McMillan Road. In the interim ACHD is approving the central access point as a temporary access until the collector road is constructed The Planning Division is not supportive of the proposed access point however; staff believes the access could serve the development as either an emergency access or a pedestrian access to Black Cal Road. If the applicant constructs the collector roadway with the third phase or with the approval of the 123"r residential lot, staff is supportive of the central access if it is converted to an emergency accessbnicropath connection to Black Cat. • "Locate high-density development, where possible, near open space corridors or other permanent major open space and park facilities, Old Town, and near major access thoroughfares." (3.07.02) The future multi family is proposed for the northeast and southeast corners of the development adjacent to N Black Cat Road and W. McMillan Road; both will become major thoroughfares in the City. • "Evaluate the comprehensive impact of growth in all land use decisions (e.g., traffic impacts, school enrollment and parks etc.)." (3.01.0113) Staff has received a letter from COMPASS detailing how the proposed project meets or does not sheet the goals of Communities in Motion, the regions long range transportation plan. The letter highlights that the current assumptions in the long range transportation plan did not anticipate very much growth in this area by 2040. If this area continues to grow at the current rate, the Cijr should work with COMPASS to track this growth and make sure that it is refected in the next update to the long range transportation plan. Staff believes the proposed development is located within close proximity to future schools, existing and proposed parks and employment areas to serve the proposed development. For the above stated reasons, staff finds the proposed project is consistent with the goals and objectives in the Comprehensive Plan. VIIL UNIFIED DEVELOPMENT CODE (UDC) A. Purpose Statement of the Zone(s): RESIDENTIAL DISTRICTS (R-8 and R-15): The purpose of the residential districts is to provide for a range of housing opportunities consistent with the Meridian Comprehensive Plan. Residential districts are distinguished by the allowable density of dwelling units per acre and Jump Creek Subdivision —AZ-14-01land PP -14-013 PAGE 6 EXHIBIT A corresponding housing types that can be accommodated within the density range. B. Schedule of Use: Table 11-2A-2 lists the principal permitted (P), accessory (A), conditional (C), and prohibited (-) uses in the R-8 and R-15 zoning districts. Any use not explicitly listed, or listed as a prohibited use is prohibited. C. Dimensional Standards: The lots in the proposed preliminary plat appear to conform to the dimensional standards of the applicable districts. Development of the site shall comply with the dimensional standards listed in UDC 11-2A-6 and UDC 11-2A-7 for the R-8 and R-15 zoning districts. D. Landscaping: • Street buffer landscaping shall be installed in accordance with the standards listed in UDC Tables 11-2A-6, UDC 11-2A-7 and UDC 11 -3B -7C for the R-8 and R-15 zoning districts. • The proposed micropaths and pathways shall comply with the design standards in accord with UDC 11-3A-8 and UDC 11-313-12. • Per UDC 11-3G-3, the plat is required to provide 10 percent open space and one amenity for every 20 acres of development area. E. Subdivision Design and Improvement Standards: The subdivision must comply with the subdivision design standards outlined in UDC 1 I -6C-3. F. Off -Street Parking: Off-street parking is required in accord with UDC Table 11-3C-6 for single- family and multi -family dwellings. IX. ANALYSIS A. Analysis of Facts Leading to Staff Recommendation: Annexation (AZ) The applicant is requesting to annex approximately 86.06 acres from the RUT zoning district in Ada County to the R-8 (Medium Density Residential) and R -I S (Medium-high Density Residential) zoning districts. The annexation legal description and exhibit map submitted by the applicant, included in Exhibit C, shows the boundary of the property proposed to be annexed and zoned contiguous to the existing boundary of the City of Meridian and within the approved Area of City Impact boundary. As stated above, staff believes that the proposed zoning districts are consistent with the Comprehensive Plan. To ensure the site develops as proposed by the applicant, staff is recommending a development agreement as part of the annexation approval (see Exhibit B). Preliminary Plat (PP) The applicant has applied to subdivide 318 single family lots, 2 multi -family lots and 42 common lots on approximately 85.9 acres in the proposed R-8 and R-15 zoning districts. The minimum lot size proposed with the single family portion of the plat is 3,600 square feet adjacent to the mew lots and the average lot size is approximately 6,500 square feet for all of the other single family lots. The two (2) multi -family lots consist of 1.92 acres and 2.97 acres respectively. The single family portion of the proposed development has a gross density of 3.92 dwelling units to the acre. The applicant has provided a conceptual layout for the multi -family portion of the development that depicts a total of 76 multi -family units at a gross density of 15.5 dwelling units to the acre. The overall gross density for the project is 4.59 dwelling units to the acre. Jump Creek Subdivision—AZ-14-01 land PP -14-013 PAGE 7 EXHIBIT A It is important to note that the gross density of the multi -family lots will be determined with the submittal of a conditional use permit application. Since development is not proposed for the multi -family lots, staff recommends a DA provision requiring the lots to development at a density range between 8 and 15 dwelling units to the acre. Dimensional Standards: All of the proposed lots must comply with the dimensional standards established in the UDC 11-2A-6 and UDC 11-2A-7. The Jump Creek plat complies with the frontage requirements and minimum lot sizes of the UDC. Phasing Plan: The applicant is proposing to develop the Jump Creek Subdivision in six (6) phases. Phases 1-4 are to commence off the central access from Black Cat Road and generally consume the central portion of the development. The fifth phase is located along the north boundary and the last phase is proposed for the southern portion of the development. In general staff is supportive of the proposed phasing plan however; staff recommends the applicant change the phasing boundaries and construct the entire collector road (W. Malta Drive) with the approval of the 123`d residential lot and convert the temporary central Black Cat access to a pedestrian connection. Subdivision Standards: UDC 11-6C-3 regulates the subdivision standards for residential subdivisions. Staff has reviewed the submitted plat for conformance with these regulations. The intent of this section of code is to ensure block lengths measure 750 feet with the allowance of an increase in block length to 1000 feet if a pedestrian connection is provided, dedication of roadways, creation of easements and dictates the construction standards for common driveways and alleys. In reviewing the submitted plat for conformance with these standards, staff is recommending several modifications to ensure the plat conforms to the requirements of the UDC as follows: 1) The subject property abuts property (north and west) that has an approved road layout that stubs to the proposed development. In reviewing the road alignment all three (3) of the streets along the west boundary (W. Daphne Street, W, Philomena Street and W. Malta Drive) and one (1) street, along the north boundary of the development (N. Oakstone Avenue) do not align with the streets approved with the Oaks North Subdivision. The applicant must align these streets with the stub streets approved with the Oaks North development. Further, the portion of lots along the northern boundary (Lots 7-9 and 11-14, Block 1 and Lots land 2, Block 2) abut a future street approved with the Oaks North development. The UDC does not allow double frontage lots for single family developments. The applicant must create a common lot along the rear of the aforementioned lots or re -design this area of the plat to eliminate the aforementioned lots from fronting on two (2) public streets. 2) As mentioned above the UDC requires block lengths to measure 750 feet or allows extended block lengths if pedestrian connections are provided. To ensure that block lengths do not exceed this requirement, staff has analyzed the block lengths of this development in conjunction with the Oaks North development. • With the extension of W. Philomena Street, the block length between both developments would be in excess of 1,180 feet without an intersecting street. To mitigate for this block length, staff is recommending the applicant shift N. Oakstone Avenue to the west side of common lot 18, block 13 and provide a north/south 20 -foot wide micropath common lot that connects N. Willowside Avenue with W. Philomena Street to comply with block length requirements of the UDC. • An extended block length (approximately 1,150 feet) exists along the northern boundary of the proposed development. To break up- the block length in this area of the plat, staff Jump Creek Subdivision —AZ-14-Ol land PP -14-013 PAGE 8 EXHIBIT A is recommending the applicant install a 5 -foot wide micropath within common lot 10, block 1. With the inclusion of the changes recommended by staff, the proposed plat would comply with the subdivision design standards set forth in UDC 11-6C-3. Prior to the Commission hearing, the applicant should revise the plat with the aforementioned changes. Street Network: With the development of Jump Creek, the applicant is proposing extend (3) stub streets from the west and one (1) stub street fiom the north approved with the Oaks North development. As submitted these streets do not align with the adjacent stub streets. As noted above, the applicant is conditioned to submit a revised plat that addresses the alignment of the roadways on the west and north boundaries, the shifting of a roadway to mitigate a block length and redesigning the northwest corner of the plat to avoid having single family fronting on two (2) public streets. Per ACHD's Master Sheet Map (MSM) a collector street is required at the mid -mile of N. Black Cat Road to align with the collector street approved with the Volterra North Subdivision. The submitted plat depicts a collector sheet system (W. Malta Drive) however as stated above, this roadway does not align with the collector street location approved with the Oaks North project. The applicant is also requesting three (3) access points to N. Black Cat Road. In discussions with ACHD staff, the central access will be temporary (designed as a 25 -foot wide driveway) until such time as the collector street is constructed. Both ACHD and Staff are recommending that the collector road be constructed with the approval of the 123`s residential lot for the following reasons: 1) Facilitates the closure of the central access with an earlier phase of development; 2) Aligns closer with the construction timeframe of the collector road approved with the Volterra North Subdivision and; 3) Increases mobility within the development to access N. Black Cat Road To remediate the access point staff is recommending that the applicant convert this access point into a pedestrian connection and submit the necessary plans with the final plat. In general, City Staff is supportive of the street network with the aforementioned modifications, but final review and approval comments are still needed from ACHD. Future Park Site: The Comprehensive Plans designates a park site in this area of Meridian. Currently, the Bainbridge development, located on the east side of Black Cat, dedicated acreage for the construction of a City Neighborhood Park as part of the plat approval and Heroes Park is located approximately a mile away on the east side of Ten Mile Road. For these reasons, the Parks Department is not requesting the applicant to contribute any land towards a City park. Multi -use Pathway: Per the Master Pathways Plan, the applicant is responsible to extend and construct a 10 -foot wide multi -use pathway on the south side of W. Malta Drive. The submitted plat depicts a 7 -foot wide attached sidewalk. With the submittal of the final plat, the applicant should provide a detached 10 -foot wide multi -use pathway on the south side of the aforementioned roadway in accord with the Master Pathways Plan. The pathway must be constructed in accord with UDC 11-3A-8 and UDC -11 -3B -12C. Micropaths: The applicant is proposing multiple pedestrian connections throughout the development. All of the micropath lots and pedestrian connections must comply with the standards set forth in UDC 11-3A-8 and UDC 11-313-12. However, Staff is recommending modifications to the proposed pathway network to enhance the connectivity and/or extend additional walkways from the adjacent development as follows: Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 9 EXHIBIT A 1) The submitted plat depicts numerous common lots (Lot 1, Block 7 and Lot 18, Block 13), with paralleling walkways adjacent to the street. Because the applicant is providing the required sidewalks per ACHD's and the City's standards, staff believes the double walkways are not necessary to facilitate pedestrian movement and therefore request the applicant to remove the detached walkways from the submitted plans. 2) The applicant has done a nice job providing internal pedestrian connectivity within the proposed development. However, the submitted plat is lacking a key connection with the Oaks North development to the west. Specifically, the Oaks North project has an approved pathway that will stub to the west boundary of Lot 8, Block 13. This walkway must extend through the site and provide a connection to W. Avilla Drive. 3) Currently, the plan lacks pedestrian connectivity to W. McMillan Road. Staff recommends that the applicant provide two (2) pedestrian connections to the 5 -foot wide detached sidewalk adjacent to this roadway through common lots 24 and 29, block 18. Landscaping Requirements: Open Space/Amenities: UDC 11-3G-3 requires a minimum of ten percent open space for all residential developments exceeding five acres. The UDC also requires one additional site amenity for the first 20 acres and one additional amenity for each additional 20 acres of development area. Using this standard, the applicant is required to provide a total of four (4) amenities for a development of this size (85.9 acres). The applicant is proposing 13.54 acres of common open space with this development which equals approximately 15.73°/% of the total development area. Qualifying open space includes numerous drainage lots, 50% of the arterial street buffers, collector street buffers, micropath lots, and passive open space in various sizes. The proposed amenities include the following: 1) three (3) tot lots; 2) integrated pathway system; 3) extension of the Meridian Pathway system and 4) 5% additional open space. As noted above, the applicant has multiple drainage facilities within the development which are allowed to count towards open space per the UDC. However, if these drainage lots contain sand in the bottom and are not designed in accord with UDC 11-3B-11, the sandy areas must be removed from the open space calculations and will not count towards the required open space for the proposed development. Since the applicant is counting the additional 5 percent open space as an amenity, staff encourages the applicant coordinate closely with ACHD and Staff to ensure the drainage facilities are developed in an attractive manner to enhance the appearance of the development and not reduce the open space below 15%. Given the size of the proposed development, staff believes the applicant should provide the amenities as proposed with the submitted plat. Staff recommends the amenities be constructed and ready for use as follows: 1) Lot 4, Block 10, including the amenities (tot lot), should be installed with second phase of development; 2) Lot 17, Block 15 and Lot 17, Block 18, including the amenities (tot lot), should be installed with the fourth phase of development. Jump Creek Subdivision— AZ -14-01 I and PP -14-013 PAGE 10 EXHIBIT A If the amenities are installed per the staff's recommendation, staff is supportive of the amenity package for the subdivision. Arterials: UDC 11-2A-6 and UDC 11-2A-7 require a 25 -foot wide sheet buffer along McMillan Road and Black Cat Road. The portion of the landscape buffer proposed for Lot 6, Block 2 must be 35 -feet in width because it is designated as an entryway corridor per the Comprehensive Plan. The landscape buffers shall be constructed in accord with the standards outlined in UDC11-3A- 7C. Collector Streets: UDC 11-2A-6 and UDC 11-2A-7 require a 20 -foot wide street buffer along N. W. Malta Drive. On the submitted landscape plan, the applicant is proposing buffers that exceed the required 20 -foot width. These buffers shall be constructed as proposed and in accord with the standards set forth in UDC 1 -3A -7C. The unimproved street right-of-way along McMillan and Black Cat is 10 feet or greater from the edge of pavement to edge of sidewalk or property line, and the street widening project is not in the transportation authority's five year funded plan. The developer is required to maintain a 10 - foot wide compacted gravel shoulder meeting the construction standards of the transportation authority and landscape the remainder with lawn or other vegetative ground cover in accord with UDC 11 -3B -7C.5. With the submittal of the final plat, the landscape buffers must comply with these standards. The UDC requires all residential street buffers to be in common lots maintained by the homeowners association. The submitted plat depicts the buffers as common lots as required. Fencing: The applicant has submitted a detail fence plan for the proposed subdivision. The proposed fence materials consist of 4 -foot and 6 -foot tall vinyl fencing. In reviewing the fencing plan it appears a portion of the fencing (segments oriented north and south) proposed for common lot 5, block 5 and common lot 29, block 18 have 6 -foot tall solid fencing. These segments of fencing do not comply with the fencing regulations of the UDC and must be replaced with a 4 - foot tall vinyl fence. All perimeter and common open space fencing must be designed as set forth in UDC II -3A-7. Existing Trees: There are existing trees on the property that may need to be removed with the development of the property. The applicant should protect all existing trees on the site that are greater than four -inch caliper and/or mitigate for the loss of such bees as set forth in UDC 11-313- 10, mitigation is required for all existing healthy trees 4 -inch caliper or greater that are removed from the site with equal replacement of the total calipers lost on site up to an amount of 100% replacement. With the submittal of the final plat the applicant should submit a revised landscape plan that details the mitigation plan outlined by the developer and the City Arborist. Sidewalks: The submitted plans do not depict the required 5 -foot wide detached sidewalks along Black Cat or McMillan Road. Further the applicant is proposing to construct 7 -foot wide attached sidewalks along W. Malta Drive, designated a collector street. Currently, this area of Meridian is lacking pedestrian facilities because of its rural character. However, this area is rapidly developing with urban development and a future elementary school is planned for the Volterra Development located to the east. In conjunction with the sidewalks improvements required with Phase 1, the applicant should extend the sidewalk from the north side of central access to the south side of W. Malta Drive. With the submittal of a final plat, the applicant shall construct the required sidewalks as follows: 1) Construct a 5 -foot wide detached sidewalk on the north boundary of W. Malta Drive and a 10 -foot wide detached multi -use pathway on the south side; Jump Creek Subdivision —AZ-14-011and PP -14-013 PAGE 11 EXHIBIT A 2) Construct a 5 -foot wide detached sidewalk adjacent to N. Black Cat Road and W. McMillan Road in accord with UDC 11-3A-17. With the first phase of development, the applicant should extend a 5 -foot wide detached sidewalk from the north boundary of W. Daphne Street to south boundary of W. Malta Drive. Ditches, Laterals, and Canals: The Creason Lateral, East Tap Sublateral and numerous small drains transverse this property. Per UDC 11-3A-6, all irrigation ditches, laterals or canals, exclusive of natural waterways and waterways being used as amenities, which intersect, cross or lie within the area being subdivided should be covered. Pressure Irrigation: The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water. The Applicant should be required to utilize any existing surface or well water for the primary source. If a surface or well source is not available, a single - point connection to the culinary water system shall be required. If a single -point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to development plan. An underground, pressurized irrigation system should be installed to all landscape areas per the approved specifications and in accordance with UDC 11-3A-15 and MCC 9-1-28. Existing Structures: The subject property is currently being farmed and a home and several outbuildings exist on the property. Staff is amenable to the existing structures remaining as long as the property is being farmed. Once the applicant submits a final plat that contains the boundary of any of the existing structures, the applicant must remove the structures prior to City Engineer's signature on a final plat. Building Elevations: The applicant has submitted photos and conceptual building elevations for the future homes in this development, included in Exhibit A.4. These elevations depict a variety of styles and building materials and are consistent with existing homes constructed in the surrounding area. Future homes adjacent to McMillan Road, Black Cat Road and W. Malta Drive (Lots 2-6 and 8-18, Block 3, Lots 1-4 and 6-10, Block 5, Lots 2-8 and 10-15, Block 8, Lots 2-4 and Lots 20-28, Block 14, Lots 14-28, Block IS and all lots that front on W. Leighton Street ) should incorporate a mix of materials, windows and decorative trim, pop -outs, covered porches and two variations in the roof lines to provide articulation and modulation to the side and rear facades. The applicant has not provided any elevations for the proposed alley loaded homes. Prior to the Commission hearing, staff is recommending the applicant submit home elevations for the alley -loaded product to ensure a cohesive design theme within the development. Elevations have not been submitted for the multi -family areas. These elevations will be reviewed with a future conditional use permit application and will require compliance with the City's design review standards and the design guidelines contained in the Meridian Design Manual. A recommended provision of the DA requires compliance with the submitted elevations. In sarnanra y, Stgff reconanve»ds approval of the proposed application request with the recommended conditions listed in Exhibit B of this report in accord with the findings contained in Exhibit D. X. EXHIBITS A. Drawings 1. Vicinity Map 2. Proposed Preliminary Plat (dated: 06/0661410/02/14) 3. Proposed Landscape Plan (dated: 06/17/14) Jump Creek Subdivision—AZ-14-011 and PP -14-013 PAGE 12 EXHIBIT A 4. Proposed Building Elevations B. Conditions of Approval C. Legal Descriptions and Exhibit Map for Annexation D. Required Findings from Unified Development Code Jump Creek Subdivision — AZ -14-011 and PP -14-013 PAGE 13 EXHIBIT A A. Drawings 1. Vicinity Map Vicinity Map Legend ` � �Nea oflmpacl _ Pamels-menJlan Print Dale: 01813019 Vicinity Map 0 0.176 0.35 Miles �Nma em� �..� mi lm myas mm wn nma �aumlwmw Ire+� nmcry 1 of Flu�tlLs maVn: m w.nanrymm auomnleo of b IM Yv'nloKu.v.n Yinalnexio rteMalzsola�y o(Na i<um L p�dma J enU�nPS n41gd itl5pMY4dJy FH Ja muAm a'mleYxJ on Nis ma0 I I l E IDIZ IANC DAHO 0 0.175 0.35 N�Mles Print Dale. 9/812014 Jump Creek Subdivision— AZ-14-01Iand PP -14-013 PAGE 14 e�M� —RUN 2. Proposed Preliminary Plat (dated: 96,406,11410/02/14) PRKWMMART PUT FOR �.._.._.._—.._.. I 11198 CH39K_SVIlOIVISION v I S—T- R Ro mggmmg a CICU 7,C^LEI _ � 4 Rg »a ggg$ -la'CiI CPQ m g 3 E n ss RRRRR; gggsr.RR a� ° — r wy.. crz�-m .. w ''A^��:r'i�e use 441YYMNHHH m n, �= p, o«'t-:°.»�I�.,:.;�:�v.�.'�a•� Jump Creek Subdivision —AZ -14-01 I and PP -14-013 PAGE 15 EXHIBIT A 3. Proposed Landscape Plan (dated: 06/17/14) jump Creek Subdivision Slle laerllon M.P.. Development F"toaen- ta :i: ' ♦ y iVtYOX •wtOtY«Itt atl � - � -- il�"! ttYtb!llL Nw 101t. at J,i Yy WUIlN1W4 It11 1 i � 3 tont ltuatlf j ....... ..YtlttVrtt '1 _ • T _ - i YFtIt IX tI/Y NtrtN - '= 3 i •_ WYt NF CrtY 1 4� IF DItl1Yt1 ItllWt�tMtltlt G/ - � "" t[Iltut ntwtltlN tlt/uCf � 1 _ NelghDoeAood Amnienitles '' i;i to �a,ali a:l� ns;f •. o. t, i i 3 i 2 2- 1 7 i. I y I i 3i1 m Jump Creek Subdivision— AZ-14-011and PP -14-013 PAGE 17 ------------- I ------ All f.6 I. HEET� L 3- SH�ET � 1.7 ............. ------- --- — tLWEEV L1.4 I SHEETI L1.8 EXHIBIT A I'VE !I!" 41,Y,�I:L4r FIA mw� Mo 1; T 11 PRE+LAT OVERALL Sn MAN 01 01 . ........ Wes O0:'OO 00 C 00(i ) ,'N LANOOCAPE MM C, ---------- VIVE W11 Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE IS EXHIBIT A ,,m.lb yI 1 OB[A.L LANDS.IE NO.. 7 ... I I I - W.AVnuoN. • .—_'MAW LAD.. .. eea. L.n [An o[emAu. OEPP -� `Aao iuxrixo PmAm Nef�' /N LANDSCAPE PUN m PNASEN I � p Hca c> ? CY3 C7�C90 !M l a _= Jump Creek Subdivision — AZ -14-011 and PP -14-013 PAGE 19 04NMRAL umeoeee xon. I. ;O:O�.) p, 7 '- @ eRII4 LLO [OA O[O/.LL I � '•p. i- {Y. PLANE SL PLWTLIII'.L.YAMOAPIAMY. EAP [L.umxAnmLva w — � LANDSCAPE PIAN ,,m.lb yI 1 OB[A.L LANDS.IE NO.. 7 ... I I I - W.AVnuoN. • .—_'MAW LAD.. .. eea. L.n [An o[emAu. OEPP -� `Aao iuxrixo PmAm Nef�' /N LANDSCAPE PUN m PNASEN I � p Hca c> ? CY3 C7�C90 !M l a _= Jump Creek Subdivision — AZ -14-011 and PP -14-013 PAGE 19 EXHIBIT A ----------------------- i""�___—._—_—_.--w. _._�_—__..._.i JNMPCREflc on •g 0 i 1 LANDSCAPE PLAN IWEW. Octel¢ cuoecOe AOIO I \ w.LEowm ST.W. m P�f LtD wn Dvnneu. oc qo _JV?? Q � � cS000+ •aooc� £fin .a—«—.m.�..mn.u. v.m Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 20 NOM1 LANDSCAPE PLAN IWEW. Octel¢ cuoecOe AOIO m P�f LtD wn Dvnneu. Qin iW N,L®nNbnI LLO iOP .a—«—.m.�..mn.u. v.m `.S'R]a `�. ^"••^'•mea...._. PFAN'L'LbT. LAxmD.vv xOim eN eLAaiwO uclwva — ..n.a....,.:.x. a.o.� ='Y.4Y:l ::a:�,.�'z:: Ti"•^' 1 I 1 1 1 LLJ LLQ T 4kj ver:.x \ 1 �L. ....... ..R15 !i{ i J' I�� it �i U ���C> ��-1 � � � .....,..•-•. G - i%` � 6@9uL 1Awf EWRP J 1 O I m x�v'i B®D i0P OinnL[L 1 - - .� W.. ._..l�_.�'. PHASE•I 1NO iLLN[wO De'LOACP xOiY. nLANDSW�PLAN 1J Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 20 EXHIBIT A 7--__ a I I PIVSE II - PIUSEI Ci� 1 A.NE Si,? 1 lI I tl 1 W. PWIOMENAbi •� 1!I 119 1 � 1 GG C�� ¢d)��! -------------------- - - IIP �-'----- 1 OI j I 7--__ a I I PIVSE II - PIUSEI 1 j V OMIINE Si W . DAPxNE sr. K� I I I -- I YHA9E1 IEaOA NN,W 1. i.°mipx°m'is IN LAtZSCAPE PLAN LD com LLuanc x°n° Y10. N "`•ter., -r ° LLO MP Oei11iS °u°xi''u"°r wx°wcmLenuo ron Pew euNnxa nmem nma /\ LAN05CAP� E FLAN Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 21 Ci� 1 A.NE Si,? 1 lI I tl 1 W. PWIOMENAbi •� 1!I 119 1 � 1 GG C�� I -------------------- - - IIP �-'----- 1 OI j 1 j V OMIINE Si W . DAPxNE sr. K� I I I -- I YHA9E1 IEaOA NN,W 1. i.°mipx°m'is IN LAtZSCAPE PLAN LD com LLuanc x°n° Y10. N "`•ter., -r ° LLO MP Oei11iS °u°xi''u"°r wx°wcmLenuo ron Pew euNnxa nmem nma /\ LAN05CAP� E FLAN Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 21 Ci� I WAVILLA DR •� 1!I j I I I! 0 l � IJJJ w j "I A-�'I- 1 j V OMIINE Si W . DAPxNE sr. K� I I I -- I YHA9E1 IEaOA NN,W 1. i.°mipx°m'is IN LAtZSCAPE PLAN LD com LLuanc x°n° Y10. N "`•ter., -r ° LLO MP Oei11iS °u°xi''u"°r wx°wcmLenuo ron Pew euNnxa nmem nma /\ LAN05CAP� E FLAN Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 21 EXHIBIT A � _ N_Afd11LlNI qOM •:.nzt 00 u^. ," YXA$EI s s�I�IIi y {y j f� ` `I q Y 5 .....b W lEl GNTON $} � _ N_Afd11LlNI qOM I mra. mcax^•- _ iMraz. 1'_-_ ry'`�f�_ max•=__t1:�="'�,' ae>ou�w w LxonP �.�J TYTld2 JtY�..3: z r vrer n: -x-•• P® • tf 19D POP Pwo�iur�ixua nnLm nma. [� LAIA$LAPE PLAX vns I c. .. mmu uroecua.or.. :waa xvrr�n: n:••^• ei�i>orcu mPvsr�uxesvPUXUP awn Jump Creek Subdivision— AZ -14-011 and PP -14-013 PAGE 22 •:.nzt 00 u^. 5 I mra. mcax^•- _ iMraz. 1'_-_ ry'`�f�_ max•=__t1:�="'�,' ae>ou�w w LxonP �.�J TYTld2 JtY�..3: z r vrer n: -x-•• P® • tf 19D POP Pwo�iur�ixua nnLm nma. [� LAIA$LAPE PLAX vns I c. .. mmu uroecua.or.. :waa xvrr�n: n:••^• ei�i>orcu mPvsr�uxesvPUXUP awn Jump Creek Subdivision— AZ -14-011 and PP -14-013 PAGE 22 EXHIBIT A 5. Proposed Home Elevations Traditional Single-family Home Elevations - Jump Creek - Front Load Ferspective As viewed looking west on W. Lola Drive Jump Creek Subdivision —AZ -14-01 I and PP -14-013 PAGE 23 EXHIBIT A Jump Creek Subdivision —AZ -14-01 land PP -14-013 PAGE 24 EXHIBIT A Jump Creek Subdivision— AZ -14-011 and PP -14-013 PAGE 25 EXHIBIT A J 77 Jump Creek Subdivision— AZ-14-011and PP -14-013 PAGE 2G EXHIBIT A Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 27 EXHIB [T A w A,:.... Jump Creek Subdivision—AZ-14-01 land PP -14-013 PAGE 28 EXHIBIT A Jump Creek Subdivision — AZ -14-011 and PP -14-013 PAGE 29 EXHIBIT A Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 30 EXHIBIT A Jump Creek Subdivision —AZ-14-01land PP -14-013 PAGE 31 EXHIBIT A rmem Jump Creek Subdivision—AZ-14-01 land PP -14-013 PAGE 32 EXHIBIT A Jump Creek Subdivision —AZ -14-011 and PP -14-013 PAGE 33 EXHIBIT A Alley -load Home Elevations - Jump Creek - Alley Load Perspective As viewed looking west between W. Jump 5treet Drive and Alley B Jump Creek Subdivision —AZ-14-01land PP -14-013 PAGE 34 EXHIBIT A .11 Jump Creek Subdivision—AZ-14-01 land PP -14-013 PAGE 35 -L,-A EXHIBIT A Sump Creek Subdivision —AZ-14-01land PP -14-013 PAGE 36 EXHIBIT A Jump Creek Subdivision — AZ -14-01 land PP -14-013 PAGE 37 EXHIBIT A Multi -family Elevations and Sample Photos Building #12 /case: New Green Top: Smokey Topaz Accent: Herbal Wash Jump Crcck Subdivision— AZ -14-011 and 1'P-14-013 PAGE 38 ;II {S�r �fi I 7 a � S i ioiu2l RIM! A �Y a EXHIBIT A EXHIBIT B — CONDITONS OFAPPROVAL 1.. PLANNING DEPARTMENT 1.1 Annexation Comments 1.1.1 A development agreement (DA) is required as a provision of annexation of these properties. Prim to the annexation ordinance approval, a DA shall be entered into between the City of Meridian, the property owner(s) at the time of annexation ordinance adoption, and the developer. Signature on the DA is required prior to submitting any final plat for review and approval. The applicant shall contact the City Attorney's Office to initiate this process. The DA shall be signed by the property owner and returned to the City within two (2) years of the City Council granting annexation approval. The DA shall, at minimum, incorporate the following provisions: A. The applicant shall comply with the submitted home elevations attached in Exhibit A.4. Future homes adjacent to McMillan Road, Black Cat Road and W. Malta Drive (Lots 2-6 and 8-18, Block 3, Lots 1-4 and 6-10, Block 5, Lots 2-8 and 10-15, Block 8, Lots 2-4 and Lots 20-28, Block 14, Lots 14-28, Block 18 and all lots that front on W. Leighton Street ) shall incorporate a mix of materials, windows and decorative trim, pop -outs, covered porches and two variations in the roof lines to provide articulation and modulation to the side and rear facades that face the arterial and collector streets. Prior to the Commission hearinE, the a submit elevations for the allLi, 'ended homes to en . . . . ri-theme­m4thin4he dement: The proposed alley -loaded homes are attached in Exhibit AA above. B.The site shall develop with a minimum of 15 percent open space (12.89 acres) to include the following amenities: three (3) tot lots, internal walking paths, a 10 -foot wide multi -use pathway on the south side of W. Malta Drive and 5% additional open space. Timing for the construction of the tot lots shall be as follows: 1) Lot 4, Block 10, including the amenities (tot lot), shall be installed with second phase of development and; 2) Lot 17, Block 15 and Lot 17, Block 18, including the amenities (tot lot), shall be installed with the fourth phase of development. C. With the first phase of development the applicant shall construct: 1) a 5 -foot wide detached sidewalk from the north boundary of W. Daphne Street to south boundary of Lot 13, Block 8 W Malta DFive. AND 2) a temporary 5 -foot wide asphalt pathway and extruded curb along the west shoulder of N. Black Cat Road from the south boundary of Lot 13, Block 8 to the south boundary of W. Malta Drive/Black Cat Road intersection. D. The applicant shall comply with the submitted multi -family elevations attached in Exhibit A.4. Future development of the multi -family lots shall comply with the design standards listed in UDC 11-3A-19 and the guidelines contained in the Meridian Design Manual and requires conditional use permit approval. The density range for Lot 5, Block 2 and Lot 1, Block 18 shall be between 8 and 15 dwelling units to the acre. E. The applicant shall comply with all City ordinances in effect at the time of final plat submittal. F. With the approval of the 123`d residential lot, the applicant shall construct the collector road (W. Malta Drive) to the W. Joseph Drive intersection and bollard the central access for a pedestrian connection. Details of this conversion shall be submitted with the final plat. G. The applicant shall maintain surface water delivery to the adjacent properties and participate in the maintenance of the drainage ditches within and near the boundaries of the Jump Creek property as testified at the public hearing. Jmnp Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 42 EXHIBIT A H. The developer shall disclose the multi -family developments in the marketing sales an de el pment of the Jump Creek project to ensure future homeowners are informed of the developments prior to purchase of the home. The two (2) multi -family lots shall be graded and remain free of weeds excess dirt and construction debris until development is p oposed for the lots. I. The developer shall comply with the best practice standards outlined in the Geotech letter to Council as follows: Continue grormdwater monitoring of the site through at least next irrigation season to more accurately gage peak levels and confirm current estimates. The soils report and groundwater monitoring are to be referred to and documented in the construction docaments as each phase is designed. Particular attention is to be paid to finished lot grades in relation to estimated ground water levels. 2. Construction drawings with each development phase shall include a master grading plan addressing drainage within each block and the drainage patterns on each lot The plans shall also include: a Finished grades for all roads, back of curbs at lots, rear lot line swales, side lot hne swales where appropriate: b. Lot existing grade prior to grading operations; Q. Lot finished grade to be achieved following grading operations: d. Minimum and Maximum ton of foundation wall elevations for each lot: e. Reference to the soils reports and recommendations provided by the soils consultant f. Reference to the "Recommendations for Homebuilders" memo provided by the soils consultant: g. the homebuilder to comply with required ton of foundation elevations or submit an n ineered site grading plan certifying compliance with grading plan intent. 3. The "Recommendations for Homebuilders" memo is to be provided to all builders obtaining building hermits within the project 4. The "Recommendations for Homebuilders" and "Comments to Homeowners" memo arc --to be incorporated into the CC&R's for the project and referenced in any architectural or maintenance guidelines specified in the CC&R's 1.2 Preliminary Plat - Site Specific Conditions of Approval 1.2.1 The preliminary plat shall be revised as follows: 1i rrzrer_ser_seers.srsrr_�rrn_ ezn�s�sr.�eesrn+<s�ssEeec�e+n. .. �:._!...: • - :- •Ji c. The applicant shall shift N. Oakstone Avenue to the west side of common lot 18, block 13 and provide a north/south 20 -foot wide micropath common lot that connects N. Willowside Avenue with W. Philomena Street to comply with block length requirements of the UDC. The applicant shall also install a water main in this common lot. d. The applicant shall construct the collector road (W. Malta Drive) to the W. Joseph Drive intersection and convert the central access to a pedestrian connection with the approval of the 123`d residential lot. Details of this conversion shall be submitted with the final plat. Jump Creek Subdivision— AZ -14-011 and PP -14-013 PAGE 43 EXHIBIT A -ppipp to the Commission ineethik-, the appRewitshollsobmito =••ekides the Fe&ioffff*oted*bffe. The revised plat is attached in Exhibit A.2 above. 1.2.2 The landscape plan attached in Exhibit A.3 is approved as follows: a. The applicant shall construct a 10 -foot wide detached multi -use pathway on the south side of W. Malta Drive in accord with UDC I1 -3A-8, UDC 11-313-7C and UDC 11-311-12C. b. The applicant shall extend the walkway stub on the west boundary of Lot 8, Block 13 through the site as a common lot and provide a connection to W. Avilla Drive or the new micropath required in condition 1.2.1 c above. c. The applicant shall construct two (2) pedestrian connections to the 5 -foot wide detached sidewalk adjacent to McMillan Road through common lots 24 and 29, block 18. d. The applicant shall construct a 5 -foot wide micropath within common lot 10, block l(north boundary). e. All fencing shall be installed in accordance with UDC 11-3A-7. Per UDC 11-3A-7A7a, the applicant is responsible for fencing micropaths and pathway lots to distinguish the common areas from the private areas. Where the buildable lots abut internal common lots fencing must either be 4 -foot solid or 6 -foot open vision. A detailed fencing plan must be submitted with each final plat application. f. Construct the required landscape buffers consistent with the standards as set forth in UDC I I - 3B -7C. A 35 -foot wide landscape buffer is required adjacent to Lot 5, Block 2. If the unimproved street right-of-way along Black Cat and McMillan Roads is 10 feet or greater from the edge of pavement to edge of sidewalk or property line, and street widening project is not in the transportation authority's five year funded plan, the developer is required to maintain a 10 -foot wide compacted gravel shoulder meeting the construction standards of the transportation authority and landscape the remainder with lawn or other vegetative ground cover in accord with UDC I1 -3B -7C.5. g. Per UDC 11-3B-10, the applicant shall work with the City Arborist, Elroy Huff, on designing, adopting, and implementing a protection and mitigation plan for the existing trees on site. h. The applicant shall comply with proposed open space and site amenities represented on the submitted landscape plan and as conditioned herein. i. Construct storm water integration facilities that meet the standards as set forth in UDC I l - 3B -11C. If sand is proposed for the bottom of the drainage facilities, these areas shall be removed from the open space calculations. j. All pathway lots shall be constructed in accord with the standards set forth in UDC I 1-3A-8 and UDC 11-313-12. k. The center medians proposed for W. Joesph Drive and W. Daphne Street shall be constructed as proposed. 1.2.3 Submit a public use easement to the Planning Division for the multi -use pathway adjacent to W. Malta Drive prior to City's Engineers signature on the final plat. 1.2.4 The applicant shall pipe or otherwise cover all irrigation ditches, laterals or canals, intersecting, crossing or lying within the area being developed in accord with LDDC 11 -3A -6A, unless left open as a water amenity or linear open space in accord with UDC 11 -3A -6A.2. 1.2.5 Comply with all ACHD conditions of approval. Jump Creek Subdivision — AZ -14-011 and PP -14-013 PAGE. 44 EXHIBIT A 1.2.6 The existing structures can remain on the property as long as the property is being farmed. Once the applicant submits a final plat that contains the boundary of any of the existing structures, the applicant must remove the structures and abandon any existing wells and septic systems prior to City Engineer's signature on a final plat. 1.3 General Conditions of Approval 1.3.1 Comply with all bulk, use, and development standards of the R-8 and R-15 zoning districts listed in UDC 11-2A-6 and UDC 11-2A-7. 1.3.2 Comply with all provisions of 11-3A-3 with regard to access to streets. Direct lot access to McMillan and Black Cat is prohibited. 1.3.3 Construct on -street bikeways on all collector streets as set forth in UDC I 1-3A-5. 1.3.4 Comply with the provisions for irrigation ditches, laterals, canals and/or drainage courses, as set forth in UDC 11-3A-6. 1.3.5 Provide a pressurized irrigation system consistent with the standards as set forth in UDC 11-3A- 15, UDC 11-3B-6 and MCC 9-1-28, 1,3.6 Comply with the sidewalk standards as set forth in UDC 11-3A-17. The applicant shall construct a 5 -foot wide detached sidewalk adjacent to N. Black Cat Road, W. McMillan Road and the north side of W. Malta Drive. 1.3.7 Install all utilities consistent with the standards as set forth in UDC I I -3A-21 and 11 -3B -5J. 1.3.8 Construct all off-street parking areas consistent with the standards as set forth in UDC 11-3C-6 for single-family dwellings. 1.3.9 Comply with all subdivision design and improvement standards as set forth in UDC 11-6C-3, including but not limited to, alleys, driveways, easements, blocks, street buffers, and mailbox placement. 1.3.10 Comply with all provisions of UDC 11-3A-3 with regard to maintaining the clear vision triangle. 1.4 Ongoing Conditions of Approval 1.4.1 The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11 -3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 1.4.2 All common open space and site amenities shall be maintained by an owner's association as set forth in UDC 11 -3G -3F1. 1.4.3 The project is subject to all current City of Meridian ordinances. Staff's failure to cite specific ordinance provisions does not relieve the applicant of responsibility for compliance. 1.4.4 The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 1.4.5 The applicant shall have an ongoing obligation to maintain all pathways. 1.4.6 The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 1.4.7 The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 1 I - 3A -3. Jump Creek Subdivision — AZ -14-01 land PP -14-013 PAGE 45 EXHIBIT A 1.5 Process Conditions of Approval 1.5.1 No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 1.5.2 The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11 -5C -3B. A surety agreement may be accepted for other improvements in accord with UDC 11 -SC -3 C. 1.5.3 The final plat, and any phase thereof, shall substantially comply with the approved preliminary plats asset forth in UDC 11 -6B -3C2. 1.5.4 The preliminary plat approval shall be null and void if the applicant fails to either 1) obtain the City Engineer signature on a final plat within two years or 2) gain approval of a time extension as set forth in UDC 11-613-7. 1.5.5 Upon installation of the landscaping and prior to inspection by Planning Department staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-313-14A. 2. PUBLIC WORKS DEPARTMENT 2.1 SITE SPECIFIC CONDITIONS OP APPROVAL 2.1.1 The applicant shall be required to install an 8 -inch diameter water main through the new common area lot required under 1.2.1 c above. A new 20 -foot wide easement will also be required for this water main. 2.1.2 The applicant shall be required to install an 8 -inch diameter water main through common Lot 24, Block 18. A new 20 -foot wide easement will also be required for this water main. 2.1.3 Water service to this development is master planned to come from mains that would need to be constructed from existing mains in Black Cat Road as well as McMillan Road. Due to fire flow requirements the applicant will need to construct a 12 -inch diameter main from the intersection of N Black Cat Road and McMillan Road heading east to the existing 12 -inch diameter main near the Ten Mile & McMillan intersection. A Pressure Reducing Station vault and conduits for power and telemetry cabling will need to be installed between Pressure Zone 1 and 2, in the McMillan Road mainline, before required fire flow will be available. The installation of the pressure reducing appurtenances shall be the responsibility of the Meridian Public Works Department. Applicant shall coordinate the vault and conduit design criteria with the Meridian Public Works Department as part of the development plan review process. This connection will need to be installed with phase one of the applicant's plan, and may be eligible for partial reimbursement. If the 12 -inch water main and PRV are installed by another developer prior to phase one construction, the applicant will not be responsible to participate in construction of the required main extension, however may be responsible for the payment of a proportional reimbursement if such an agreement exists. 2.2 General Conditions of Approval 2.2.1 Applicant shall coordinate water and sewer main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service outside of a public right-of-way. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub -grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2.2.2 Per Meridian City Code, the applicant shall be responsible to install sewer and water mains to and through this development. Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 46 EXHIBIT A 2.2.3 The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easement widths shall be 20 -feet wide for a single utility, or 30 -feet wide for two. The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement (on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor, which must include the area of the easement (marked EXHIBIT A) and an 81/2" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. 2.2.4 The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single -point connection to the culinary water system shall be required. If a single -point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to prior to receiving development plan approval. 2.2.5 All existing structures that are required to be removed shall be prior to signature on the final plat by the City Engineer. 2.2.6 All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6. Plans shall be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non -approval submitted to the Public Works Department. If lateral users association approval can't be obtained, alternate plans shall be reviewed and approved by the Meridian City Engineer prior to final plat signature. 2.2.7 Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9-4-8 contact the City of Meridian Engineering Department at (208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190. 2.2.8 Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9-4-8. Contact Central District Health for abandonment procedures and inspections(208)375-5211. 2.2.9 Street signs are to be in place, sanitary sewer and water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. 2.2.10 A letter of credit or cash surety in the amount of 110% will be required for all uncompleted fencing, landscaping, amenities, etc., prior to signature on the final plat. 2.2.11 All development improvements, including but not limited to sewer and water, fencing, micro - paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. 2.2.12 Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. 2.2.13 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. Jump Creek Subdivision — AZ -14-01 land PP -14-013 PAGE 47 EXHIBIT A 2.2.14 Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 2.2.15 Developer shall coordinate mailbox locations with the Meridian Post Office. 2.2.16 All grading of the site shall be performed in conformance with MCC 11-12-3H. 2.2.17 Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 2.2.18 The engineer shall be required to certify that the street centerline elevations are set a minimum of 3 -feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1 -foot above. 2.2.19 The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 2.2.20 At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the proj ect. 2.2.21 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval, which must include the location of any existing street lights. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. 2.2.22 The City of Meridian requires that the owner post to the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water and reuse infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 2.2.23 The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, water and reuse infrastructure for duration of two years. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 3. POLICE DEPARTMENT 3.1 The Police Department has no concerns related to this application. 4. FIRE DEPARTMENT 4.1 The Fire Department has no concerns related to this application. 5. Rrpun JC SERVICES 5.1 Republic Services did not submit comments on this application. Jump Creek Subdivision —AZ-14-01land PP -14-013 PAGE 48 EXHIBIT A 6. PARKS DEPARTMENT 6.1 The applicant shall design and construct the multi -use pathways consistent with the location and specifications (Chapter 3) set forth in the Meridian Pathways Master Plan unless otherwise approved by the Parks and Recreation Director. 6.2 Submit a public use easement to the Planning Division for the multi -use pathway adjacent to W. Malta Drive prior to City's Engineers signature on the final plat. 6.3 The applicant shall have an ongoing obligation to maintain all pathways. 6.4 At such time that the multi -use pathway connects from one major street to another and is greater than one-half mile long, the applicant may petition the City to assume maintenance responsibilities. 7. ADA COIJNTY HIGIi vAY DISTRICT 7.1 SITE SPECIFIC CONDITIONS OF APPROVAL 7.1.1 Submit an updated traffic impact study to determine if improvements to the Black Cat/Ustick and Black Cat/McMillan intersections are warranted after Phase 1 of the development is complete or multiple phases are completed which generate an ADT of 1,013 have been completed. If improvements are warranted at that time, then the applicant should either wait for other developments in the area to make the improvements, wait for ACRD to make the improvements as listed in the CIP, or enter into a Cooperative Development Agreement (CDA) with the District to make the intersection improvements. If the intersection improvement is warranted after Phase 1 (1,013 ADT) and the applicant chooses to enter into a CDA with the District to make the intersection improvements then site specific conditions 2-6 are applicable. 7.1.2 Enter into a Cooperative Development Agreement with the District to improve the Black Cat/Ustick to a 7 X 7 intersection and the Black Cat Road /McMillan to a 6 X 6 intersection, as listed in the District's Capital Improvement Plan. a. The Cooperative Development Agreement shall include the intersection design and construction, as well as allocation of costs. ACRD will only provide impact fee credit for impact fee eligible costs of permanent intersection improvements consistent with CIP. Signal hardware is available and will be provided for the intersection improvement project. The applicant shall be responsible for all other project costs. 7.1.3 Or construction of interim intersection improvements would include the signalization and widening of the Black Cat Road /Ustick Road intersection to a 3 X 3 intersection, and the signalization and widen the Black Cat Road /McMillan intersection to a 3 X 3 intersection. 7.1.4 In order to ensure the intersections and roadway segment will be improved when warranted, the following items must be in place prior plans acceptance for the final plat necessitating the improvements. • Cooperative Development Agreement; • Financial surety provided by the applicant meeting the terms of the Cooperative Development Agreement; • Full design and approved plans for the intersection; • Dedication of all of the right-of-way (both ACI -ID and ITD) necessary to complete the intersection project. 7.1.5 Widen and signalize the Black Cat/Ustick to a 7 X 7 intersection, as noted in the CIP, or make interim intersection improvements to signalize and widen the Black Cat Road /Ustick Road to a 3 s' X 3 intersection prior to plans acceptance or signature of the final plat which includes the 81 Jump Creek Subdivision— A7-14-011 and PP -14-013 PAGE 49 EXHIBIT A single family building lot and exceeds 38 multi -family dwelling units or any final plat which exceeds the equivalent amount of vehicle trips, 1,015 vehicle trips per day. Enter into a development agreement with the District for the design and construction of the signals. 7.1.6 Widen and signalize the Black Cat/McMillan to a 6 X 6 intersection, as noted in the CIP, or make interim intersection improvements to signalize and widen the Black Cat Road /McMillan to a 3 X sl 3 intersection prior to plans acceptance or signature of the first final plat which contains 171 single family building lot and exceeds 50 multi -family dwelling units or any final plat which exceeds the equivalent amount of vehicle trips, 1,951 vehicle trips per day. Enter into a development agreement with the District for the design and construction of the signals. 7.1.7 Dedicate additional right-of-way to total 51 feet from centerline of Black Cat Road from McMillan Road north 200 feet. The right-of-way should then taper to total 48 feet of right-of-way from the centerline of Black Cat Road abutting the site, 7.1.8 Construct a 5 foot wide detached concrete sidewalk located a minimum of 44 feet from the centerline of Black Cat Road for the first 200 feet north of McMillan Road, the sidewalk should then taper to 41 feet from the centerline of Black Cat Road abutting the site. 7.1.9 Construct a northbound center left -turn lane and a southbound right turn lane on Black Cat Road at the Malta Drive and Daphne Street intersections. Construct the turn lanes when the Malta Drive and Daphne Street are constructed and intersect Black Cat Road. 7.1.10 Dedicate additional right-of-way to total 37 feet from centerline of McMillan Road abutting the site. 7.1.11 Construct a detached 5 foot wide concrete sidewalk located a minimum of 30 feet from the centerline of McMillan Road abutting the site. 7.1.12 Provide a permanent right-of-way easement for any portion of the sidewalks on Black Cat and McMillan Road located outside of the right-of-way. 7.1.13 Construct Malta Drive to intersect Black Cat Road at the half mile as a 36 -foot residential collector street section with vertical curb, gutter, and a 5 -foot wide detached or 7 -foot wide attached concrete sidewalk and extend Malta Drive through the site stubbing to the west property line. 7.1.14 The Malta Drive stub street shall align with stub streets previously approved, as part of The Oaks Subdivision directly west of the site. Install a sign at the terminus of Malta Drive stating that "THIS IS A DESIGNATED COLLECTOR ROADWAY. THIS STREET WILL BE EXTENDED AND WIDENDED IN THE FUTURE." 7.1.15 Construct the entry portion of Daphne Street with two 21foot wide travel lanes, a 12 foot wide center landscape island, curb, gutter, and 5 -foot wide attached concrete sidewalks, as proposed. 7.1.16 Dedicate the center landscape island at right-of-way owned by ACHD. The applicant or the home owners association shall apply for a license agreement with the District for any right-of-way to be placed in the landscape island. 7.l .17 Construct all of the internal local streets as 34 foot street section with rolled curb, gutter, and 5 - foot wide attached concrete sidewalks within 50 feet of right-of-way, as proposed. 7.1. 18 Terminate Leighton Street at Elmstone Avenue to properly terminate the public street. Construct a driveway off the end of the Leighton/Elmstone intersection to access block 18, lot 26 and the multi -family parcel block 18, lot 1. 7.1.19 Construct 6 knuckles within the site, as proposed. Jump Creek Subdivision— AZ -14-011 and PP -14-013 PAGE 50 EXHIBIT A 7.1.20 Construct two 20 foot wide alleys Alley A and Alley B are proposed to be approximately 690 -feet in length and intersect Elmstone Avenue on the east and Willowside Avenue on the west. 7.1.21 Construct Daphne Street to intersect Black Cat 660 -feet north of McMillan Road, as proposed. Align Daphne Street centerline to centerline with the existing Daphne Street located on the east side of Black Cat Road. 7.1.22 Construct 4 streets to intersect Malta Drive, Joseph Drive, north and south of Malta Drive, 380 feet west of Black Cat Road and Willowside Avenue north and south of Malta Drive 1,200 feet west of Black Cat Road. The roadways should align centerline to centerline on the north and south sides of Malta Drive. 7.1.23 Provide a temporary right-of-way easement to allow for the construction of a 24 -foot wide temporary access road onto Black Cat Road located 1,590 feet north of McMillan Road. 7.1.24 Release the temporary right-of-way easement and remove the 24 -foot wide temporary access road onto Black Cat Road when the first segment of Malta Drive is constructed between Black Cat Road and the first intersection to the west, Joseph Drive. ACHD will not approve plans or sign a final plat for any portion of Phase 4 as depicted on the phasing plan submitted as part of the preliminary plat application, or any final plat which exceeds 122 lots of the development until the first segment of Malta Drive is constructed, and the temporary right-of-way easement is released. 7.1.25 Construct the remaining segment of Malta Drive from Joseph Drive to the west property line prior to any final plat which exceeds 222 lots. 7.1.26 Construct 1 stub street to the north, Oakstone Avenue, located approximately 770 -feet west of Black Cat Road.. Install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE. 7.1.27 Construct 1 stub street to the west; Philomena Street, located approximate 1,390 feet south of the north property line. This stub street shall align with stub streets previously approved, as part of The Oaks Subdivision directly west of the site. Install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE. 7.1.28 Construct I stub street to the west, an unnamed stub street, located approximately 2,040 feet south of the north property line. This stub street shall align with stub streets previously approved, as part of The Oaks Subdivision directly west of the site. Install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE. 7.1.29 Construct one 25 -foot wide driveway onto Daphne Street 190 -feet west of Black Cat Road. Pave the driveway its full width at least 30 feet into the site beyond the edge of pavement. 7.1.30 Construct one 25 -foot wide driveway at the terminus of Leighton Street. Pave the driveway its frill width at least 30 feet into the site beyond the edge of pavement. 7.1.31 Construct one 30 -foot wide driveway onto Joseph Drive 150 -feet north of Malta Drive. Pave the driveway its full width at least 30 feet into the site beyond the edge of pavement. 7.1.32 Construct 24 -foot wide bulb -outs with striped pedestrian crosswalks to provide traffic calming in the following locations: • mid -block on Leighton Street • mid -block on Jump Creek Drive • On Philomena between Willowside Drive and Adale Street 7.1.33 Other than the access specifically approved with this application, direct lot access is prohibited to Black Cat Road, McMillan Road, and Malta Drive and shall be noted on the final plat. Jump Creek Subdivision— AZ -14 -OI land PP -14-013 PAGE 51 EXHIBIT A 7.1.34 Payment of impacts fees are due prior to issuance of a building permit. 7.1.35 Comply with all Standard Conditions of Approval. 7.2 STANDARD CONDITIONS OF APPROVAL 7.2.1 All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 7.2.2 Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 7.2.3 In accordance with District policy, 7203.3, the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 7.2.4 Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 7.2.5 A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 7.2.6 All utility relocation costs associated with improving street fiontages abutting the site shall be borne by the developer. 7.2.7 It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 7.2.8 Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7.2.9 All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standard and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 7.2.10 Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 7.2.11 No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 7.1.12 If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 52 EXHIBIT A C. Legal Descriptions and Exhibit Map for the Annexation August 1, 2014 DESCRIPTION FOR R-8 ZONING JUMP CREEK SUBDIVISON A parcel of land located in the East 1/2 of the East 1/2 of Section 28, Township 4 North, Range 1 West, Boise Meridian, Ada County, Idaho being more particularly described as follows: Commencing at the Southeast corner of said Section 28 from which the East 1/4 corner of said Section 28 bears North 00°31'08" East, 2637.33 feet; Thence along the South boundary line of said Section 28 North 89016'45" West, 323.00 feet to the REAL POINT OF BEGINNING; Thence continuing North 89016'45" West, 994.68 feet to the East 1/16 comer of said Section 28 and Section 33 of said Township 4 North, Range 1 West; Thence leaving said South boundary line and along the West boundary line of the East 1/2 of the East 1/2 of said Section 28 North 00037'35" East, 2635.75 feet to the C -E 1/16 corner of said Section 28; feet; Thence continuing along said West boundary line North 00036'01" East, 214.65 Thence leaving said West boundary line South 89021'48" East, 841.14 feet; Thence South 00038'12" West, 100.83 feet; Thence South 10026'06" West, 26.01 feet; Thence 126.12 feet along the arc of a non -tangent curve to the right having a radius of 100.00 feet, a central angle of 72015'37", and a long chord which bears South 43026'06" East, a distance of 117.92 feet; Thence South 07018'17" East, 91.84 feet; Thence 81.87 feet along the arc of a non -tangent curve to the right having a radius of 600.00 feet, a central angle of 07049'06", and a long chord which bears North 86036'16" East, a distance of 81.81 feet; Thence South 89°29'11" East, 300.00 feet to a point on the East boundary line of said Section 28; Thence along said East boundary line South 00031'08" West, 1899.02 feet; Thence leaving said East boundary line North 89'18'27" West, 248.49 feet; Thence 31.53 feet along the arc of a curve to the left having a radius of 300.00 feet, a central angle of 06°01'17", and a long chord which bears South 87°40'55" West, Jump Creek Subdivision — AZ -14-01 I and PI' -14-013 PAGE 53 EXHIBIT A a distance of 31.51 feet; Thence South 84°40'16" West, 90.13 feet; Thence 30.62 feet along the arc of a curve to the right having a radius of 300.00 feet, a central angle of 05050'52", and a long chord which bears South 87035'42" West, a distance of 30.61 feet; Thence North 89°28'52" West, 47.80 feet; Thence North 00031'08" East, 539.00 feet; Thence North 89018'27" West, 672.40 feet; Thence 78.60 feet along the arc of a curve to the left having a radius of 50.00 feet, a central angle of 90003'58", and a long chord which bears South 45039'34" West, a distance of 70.75 feet; Thence South 00037'35" West, 247.37 feet; Thence 29.58 feet along the arc of a curve to the right having a radius of 300.00 feet, a central angle of 05°38'59", and a long chord which bears South 03027'04" West, a distance of 29.57 feet; Thence South 06016'34" West, 173.36 feet; Thence 29.65 feet along the arc of a curve to the left having a radius of 300.00 feet, a central angle of 05°39'48", and a long chord which bears South 03026'40" West, a distance of 29.64 feet; Thence South 00°36'46" West, 205.96 feet; Thence South 89°16'45" East, 743.77 feet; Thence South 00°31'08" West, 250.00 feet; Thence South 89016'45" East, 125.00 feet; Thence South 00°31'08" West, 198.00 feet to the REAL POINT OF BEGINNING. Containing 64.63 acres, more or less. Jump Creek Subdivision— AZ -14-01 land PP -14-013 PAGE 54 August 1, 2014 DESCRIPTION FOR R-16 ZONING JUMP CREEK SUBDIVISON A parcel of land located in the East 1/2 of the East 1/2 of Section 28, Township 4 North, Range 1 West, Boise Meridian, Ada County, Idaho being more particularly described as follows: BEGINNING at the Southeast corner of said Section 28 from which the East 1/4 corner of said Section 28 bears North 00°31'08" East, 2637.33 feet; Thence along the South boundary line of said Section 28 North 89016'45" West, 323.00 feet; Thence leaving said South boundary line North 00031'08" East, 198.00 feet; Thence North 89°16'45" West, 125.00 feet; Thence North 00031'08" East, 250.00 feet; Thence North 89°16'45" West, 743.77 feet; Thence North 00°36'46" East, 205.96 feet; Thence 29.65 feet along the arc of a curve to the right having a radius of 300.00 feet, a central angle of 05039'48", and a long chord which bears North 03°26'40" East, a distance of 29.64 feet; Thence North 06°16'34" East, 173.36 feet; Thence 29.58 feet along the arc of a curve to the left having a radius of 300.00 feet, a central angle of 05°38'59", and a long chord which bears North 03027'04" East, a distance of 29.57 feet; Thence North 00037'35" East, 247.37 feet; Thence 78.60 feet along the arc of a curve to the right having a radius of 50.00 feet, a central angle of 90°03'58", and a long chord which bears North 45039'34" East, a distance of 70.75 feet; Thence South 89018'27" East, 672.40 feet; Thence South 00031'08" West, 539.00 feet; Thence South 89°28'52" East, 47.80 feet; Thence 30.62 feet along the arc of a curve to the left having a radius of 300.00 feet, a central angle of 05°50'52", and a long chord which bears North 87035'42" East, a distance of 30.61 feet; Jump Creek Subdivision —AZ -14-01 land PP -14-013 PAGE 55 EXHIBIT A Thence North 84040'16" East, 90.13 feet; Thence 31.53 feet along the are of a curve to the right having a radius of 300.00 feet, a central angle of 06001'17", and a long chord which bears North 87040'55" East, a distance of 31.51 feet; Thence South 89°18'27" East, 248.49 feet to a point on the East boundary line of said Section 28; Thence along said East boundary line South 00031'08" West, 657.56 feet to the REAL POINT OF BEGINNING. Containing 18.49 acres, more or less. IZ.1711_�'i�l; BEGINNING at the East 1/4 corner of said Section 28 from which the Southeast corner of said Section 28 bears South 00031'08" West, 2637.33 feet; Thence along said East boundary line South 00031'08" West, 80.75 feet; Thence leaving said East boundary line North 89°29'11" West, 300.00 feet; Thence 81.87 feet along the arc of a curve to the left having a radius of 600.00 feet, a central angle of 07°49'06", and a long chord which bears South 86°36'16" West, a distance of 81.81 feet; Thence North 07°18'17" West, 91.84 feet; Thence 126.12 feet along the arc of a curve to the left having a radius of 100.00 feet, a central angle of 72°15'37", and a long chord which bears North 43°26'06" West, a distance of 117.92 feet; Thence North 10026'06" East, 26.01 feet; Thence North 00°38'12" East, 100.83 feet; Thence South 89°21'48" East, 471.16 feet to a point on the East boundary line of said Section 28; Thence along said East boundary line South 00°29'04" West, 215.00 feet to the REAL POINT OF BEGINNING. Containing 2.94, more or less. Jump Creek Subdivision— AZ -14.011 and PP -14-013 PAGE 56 EXHIBIT A e%' 0 QO w _S 89'21'48" E 1312.30' 841.14'- - '2, 471.16' 1'J V L12+{ R-15 p� tl 4+N 2.94 ACRES 1/4 Z C -E �L____28 27 1 1/16 C6 L10`y 1 oq I 1 In 1 m M R-5 Iz 1 64.63 ACRES HI �I �1 I NI IES I- 1 S -E j S1/16' 4 1/16 S 8978'27" E LI, m W1G^r_____672.40'I� z NI � w' 0 1. o I a-rs o U` mu L 18.49 ACRES N 89'16 A5 W 743.77' raj v'°il n m ' R -B �LZi, I -1 --28 27 994.68__ _ _ _`3,^,100'." E1/16 N 8996'45" W 1317.68' 33T3 4 W. McMILLAN RD IDAHO LINE TABLE CURVE TABLE 14W E. WATEATOWEA ST CURVE RADIUS LENGTH CHORD I CHORD BRG. DELTA C1 300. 0' 29.65' 29.64' N 03'26'40" E_ ;139'48" C2 300.00' 29.58' 29.57' N 03'27'04" E 5'38'59" C3 50.00' 78.60' 70.75 N 45'39'34" E 90'03'58" C4 300.00' 30.62' 30.61' N 87'3:142" E 5'50'52" C5 300.00,- 31.53' 31.51' N 87'40'55" E 6'01'17" C6 Goo OD, 81.87' 81.81' S 86'36'16"--W 7'49'06" C7 100.00' 126.12' 117.92' N 43'26'06' W 72'1j37" IDAHO LINE TABLE 14W E. WATEATOWEA ST SURVEY FEn Im L1 o H,gNggM 198.00' L2 GROUP, P.C.Ipa1'"'� 125.00' 250 1000 0 500 SCALE: 1" = 500' CAn=I UMMWi U iUEC 48 NO. JUMP CREEK R-15 & R-8 1J °" m Jump Creek Subdivision- AZ -14-01 land PP -14-013 PAGE 57 LINE TABLE LINE BEARING LENGTH L1 N 00'31'08" E 198.00' L2 N 89'16'45" W 125.00' L3 N 00'31'08" E 25Q.00' L4 N 0036'46" E 205.96' L5 N 06'16'34" E 173.36' L6 N 00'37'35" E 247.37' L7 S 89-28'52" E 47.80' L8 N 84'40'16" E 90.13' L9 S 89'18'27" E 248.49' L10 N 89'29'11" W 300.00' L11 N 07'18'17" W 97.84' L72 N 10-26'06" E 26.01' L13 N 00'38'12" E 100.8,3' CAn=I UMMWi U iUEC 48 NO. JUMP CREEK R-15 & R-8 1J °" m Jump Creek Subdivision- AZ -14-01 land PP -14-013 PAGE 57 EXHIBIT A D. Required Findings from Unified Development Code 1. Annexation Findings: Upon recommendation from the Commission, the Council shall make a full investigation and shall, at the public hearing, review the application. In order to grant an annexation, the Council shall make the following findings: a. The map amendment complies with the applicable provisions of the Comprehensive Plan; The applicant is proposing to annex approximately 86.06 acres to the R-8 and R-15 zoning districts. The Council finds that the proposed map amendment is generally consistent with the MDR FLUM designation for this property. The Council finds the amendment is consistent with the applicable provisions of the Comprehensive Plan (see section VII above). b. The map amendment complies with the regulations outlined for the proposed district, specifically the purpose statement; The Council finds that the proposed map amendment to the R-8 and R-15 zoning districts is consistent with the purpose statements for the residential district as detailed in Section VIII above. c. The map amendment shall not be materially detrimental to the public health, safety, and welfare; The Council finds that the proposed zoning amendment will not be detrimental to the public health, safety, or welfare. City utilities will be extended at the expense of the applicant. The Council considered all oral or written testimony provided to determine this finding. d. The map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the City including, but not limited to, school districts; and, The Council finds that the proposed zoning amendment will not result in any adverse impact upon the delivery of services by any political subdivision providing services to this site. e. The annexation is in the best of interest of the City (UDC 11 -5B -3.E). The Council finds the annexation of these properties with the R-8 and R-15 zoning districts is in the best interest of the City if the applicant enters into a development agreement and adheres to the recommended development agreement provisions in Exhibit B. 2. Preliminary Plat Findings: In consideration of a preliminary plat, combined preliminary and final plat, or short plat, the decision -malting body shall make the following findings: a. The plat is in conformance with the Comprehensive Plan and is consistent with this unified development code; The Council finds that the proposed plats are in substantial compliance with the adopted Comprehensive Plan in regard to land use, transportation, and circulation. Please see Comprehensive Plan Policies and Goals, Section VII, of the Staff Report for more information. b. Public services are available or can be made available and are adequate to accommodate the proposed development; The Council finds that public services will be provided to the subject property upon Jmnp Creek Subdivision — AZ-14-O1land PP -14-013 PAGE 58 EXHIBIT A development. (See Exhibit B of the Staff Report for more details from public service providers.) c. The plat is in conformance with scheduled public improvements in accord with the City's capital improvement program; Because City water and sewer and any other utilities will be provided by the development at their own cost, the Council finds that the subdivision will not require the expenditure of capital improvement funds. d. There is public financial capability of supporting services for the proposed development; The Council relied upon comments from the public service providers (i.e., Police, Fire, ACHD, etc.) to determine this finding. (See Exhibit B for more detail.) e. The development will not be detrimental to the public health, safety or general welfare; and The Council is not aware of any health, safety, or environmental problems associated with the platting of this property. ACHD considered road safety issues in their analysis. The Council considered all public testimony presented to determine whether or not the proposed subdivision may cause health, safety or environmental problems. f. The development preserves significant natural, scenic or historic features. The Council is unaware of any natural, scenic or historic features on this site. Therefore, the Council finds that the proposed development will not result in the destruction, loss or damage of any natural, scenic or historic feature(s) of major importance. The Council referenced all public testimony presented to determine whether or not the proposed development may destroy or damage a natural or scenic feature(s) of major importance. Jump Creck Subdivision—AZ-14-01 land PP -14-013 PAGE 59 Meridian City Council Meeting DATE: December 9, 2014 ITEM TITLE: RESOLUTION ITEM NUMBER: PROJECT NUMBER: FAN Resolution No. ` l0'��� : A Resolution Approving an Extension of the Lease Agreement Between the City of Meridian (Lessor) and Congressman Raul Labrador (Lessee) for a Two Year Lease Term Extension for Approximately 1,812 Square Feet of Office Space at the Meridian City Hall, 33 East Broadway, Meridian, Idaho to be used for a Local Congressional Staff Office. MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS CITY OF MERIDIAN RESOLUTION NO. 14- ' 0-39 BY THE CITY COUNCIL: BIRD, HORTON, CAVENER, MILAM,ROUNTREE,ZAREMBA A RESOLUTION APPROVING AN EXTENSION OF THE LEASE AGREEMENT BETWEEN THE CITY OF MERIDIAN (LESSOR) AND CONGRESSMAN RAUL LABRADOR (LESSEE) FOR A TWO YEAR LEASE TERM EXTENSION FOR APPROXIMATELY 1,812 SQUARE FEET OF OFFICE SPACE AT THE MERIDIAN CITY HALL, 33 EAST BROADWAY, MERIDIAN IDAHO TO BE USED FOR A LOCAL CONGRESSIONAL STAFF OFFICE; AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AND ATTEST SAID AGREEMENT ON BEHALF OF THE CITY OF MERIDIAN; AND PROVIDING AN EFFECTIVE DATE. BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF MERIDIAN, IDAHO WHEREAS, the City of Meridian has approximately 1,812 square feet of office space at the Meridian City Hall that is currently leased to Congressman Raul Labrador as approved by Resolution 10-767 and renewed by Resolution 12-902; and, WHEREAS, the City of Meridian has no immediate plans to use the 1,812 square feet of space for City business and Congressman Raul Labrador desires to renew the lease for an additional two years. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF MERIDIAN, IDAHO AS FOLLOWS: SECTION 1. The 1,812 square feet of space in Meridian City Hall described in the lease agreement amendment between Congressman Raul Labrador and the City of Meridian is not otherwise needed for City purposes. SECTION 2. That the terms of the District Office Lease Amendment and Attachment (attached hereto and incorporated herein) between Congressman Raul Labrador and the City of Meridian are just and equitable, and the same is hereby approved as to both form and content. (Copies of the original District Office Lease and Local Addendum being amended are attached hereto for reference), SECTION 3. That the Mayor and City Clerk be, and they hereby are, authorized to respectively execute and attest said Lease Agreement for and on behalf of the City of Meridian. SECTION 4. This Resolution shall be in full force and effect immediately upon its adoption and approval. �" ADOPTED by the City Council of the City of Meridian, Idaho, this �day�of , ativ �x 014. APPROVED by the Mayor of the City of Meridian, Idaho, this day of I� C.04?014. ATTES go Mayor Tode Weerd ®(FI SEA1 yP� RESOLUTION APPROVING AN EXTENSION OF THE LEASE AGREEMENT BETWEEN THE CITY LABRADOR V.S. Yfouse of 9?-presentatives Washington, D.C. 20515 District Office Lease Amendment (Page 1 of 2 —110 Congress) 1. Prior Lease Term. The undersigned Landlord ("Lessor") and Member of the U. S. House of Representatives ("Lessee") agree that they previously entered into a District Office Lease ("Lease") (along with the District Office Lease Attachment), which covered the period from January 3, 2015 to January 2, 2017 for the lease of office space located at 33 E. Broadway Ave.. Suite 251 in the city, state and ZIP of Meridian. ID 83642 2. Extended Term. If applicable, the above referenced Lease is extended through and including January 2 2017 . (This District Office Lease Amendment ("Amendment') may not provide for an extension beyond January 2, 2017, which is the end of the constitutional term of the 114'x' Congress.) 3. Rent and Any Other Changes. The monthly rent for the extended tern of the Lease shall now be $1,661.00 . All other provisions of the existing Lease shall remain unchanged and in full effect, except for the following additional terms, which are modified as indicated in the space below [If no additional terms are to be modified, write the word "NONE" below]. NONE 4. District Office Lease Attachment for 114'h Congress. This Amendment shall have no force and effect unless and until accompanied by an executed District Office Lease Attachment for the 110 Congress and the District Office Lease Attachment for the 114" Congress attached hereto supersedes and replaces any prior District Office Lease Attachment. 5. Counterparts. This Amendment may be executed in any number of counterparts and by facsimile copy, each of which shall be deemed to be an original but all of which together shall be deemed to be one and the same instrument. 6. Section Headings. The section headings of this Amendment are for convenience of reference only and shall not be deemed to limit or affect any of the provisions hereof. [Signature page follows. ] V.S. Yfouse of fpyesentatives Washington, D.C. 20515 District Office Lease Amendment (Page 2 of 2 —114'h Congress) IN WITNESS WHEREOF, the parties have duly executed this District Office Lease Amendment as of the later date written below by the Lessor or the Lessee. Tammy DeWeerd, The City of Meridian, an Idaho Municipal Corporation Raul R. Labrador 0 Print Name Print Name ofLessee L sor ignature Lessee Signature Name: t Icla_ wu—'ej Title: C — U \z -1C7 Date Date This District Office Lease Amendment must be accompanied with an executed District Office Lease Attachment. V.S. Aouse of 9?§presentatives Washington, D.C. 20515 District 0171ce lease Attachment (Page 1 of 4 —114'' Congress) 1. Incorporated District Office Lease Attachment. Lessor (Landlord) and Lessee (Member/Member-Elect of the U.S. House of Representatives) agree that this District Office Lease Attachment ("Attachment") is incorporated into and made part of the Lease ("Lease") and, if applicable, District Office Lease Amendment ("Amendment") to which it is attached. 2. Performance. Lessor expressly acknowledges that neither the U.S. House of Representatives (the "House's nor its Officers are liable for the performance of the Lease. Lessor further expressly acknowledges that payments made by the Chief Administrative Officer of the House (the "CAO") to Lessor to satisfy Lessee's rent obligations under the Lease — which payments are made solely on behalf of Lessee in support of his/her official and representational duties as a Member of the House — shall create no legal obligation or liability on the part of the CAO or the House whatsoever. Lessee shall be solely responsible for the performance of the Lease and Lessor expressly agrees to look solely to Lessee for such performance. 3. Modifications. Any amendment to the Lease must be in writing and signed by the Lessor and Lessee. Lessor and Lessee also understand and acknowledge that the Administrative Counsel for the CAO ("Administrative Counsel") must review and give approval of any amendment to the Lease prior to its execution. 4. Compliance with house Rules and Regulations. Lessor and Lessee understand and acknowledge that the Lease shall not be valid, and the CAO will not authorize the disbursement of funds to the Lessor, until the Administrative Counsel has reviewed the Lease to determine that it complies with the Rules of the House and the Regulations of the Committee on House Administration, and approved the Lease by signing on page 4 of this Attachment. 5. Payments. The Lease is a fixed term lease with monthly installments for which payment is due in arrears on or before the end of each calendar month. In the event of a payment dispute, Lessor agrees to contact the Office of Finance of the House at 202-225-7474 to attempt to resolve the dispute before contacting Lessee. 6. Void Provisions. Any provision in the Lease purporting to require the payment of a security deposit shall have no force or effect. Furthermore, any provision in the Lease purporting to vary the dollar amount of the rent specified in the Lease by any cost of living clause, operating expense clause, pro rata expense clause, escalation clause, or any other adjustment or measure during the term of the Lease shall have no force or effect. 7. Certain Charges. The parties agree that any charge for default, early termination or cancellation of the Lease which results from actions taken by or on behalf of the Lessee shall be the sole responsibility of the Lessee, and shall not be paid by the CAO on behalf of the Lessee. 8. Death, Resignation or Removal. In the event Lessee dies, resigns or is removed from office during the tern of the Lease, the Clerk of the House may, at his or her sole option, either: (a) terminate the Lease by giving thirty (30) days' prior written notice to Lessor; or (b) assume the obligation of the Lease and continue to occupy the premises for a period not to exceed sixty (60) days following the certification of the election of the Lessee's successor. In the event the Clerk elects to terminate the Lease, the commencement date of such thirty (30) day termination notice shall be the date such notice is delivered to the Lessor or, if mailed, the date on which such notice is postmarked. V.S. Yfouse of Representatives Washington, D.C. 20515 District Office Lease Attachment (Page 2 of 4 —114' Congress) 9. Term. The term of the Lease may not exceed the constitutional term of the Congress to which the Lessee has been elected. The Lease may be signed by the Member -Elect before taking office. Should the Member -Elect not take office to serve as a Member of the 114a' Congress, the Lease will be considered null and void. 10. Early Termination. If either Lessor or Lessee terminates the Lease under the terms of the Lease, the terminating party agrees to promptly file a copy of any termination notice with the Office of Finance, U.S. House of Representatives, B-245 Longworth House Office Building, Washington, D.C. 20515, and with the Administrative Counsel by e-mail at leases@mail.house.gov. 11. Assignments. Lessor shall not have the right to assign (by operation of law or otherwise) any of its rights, interests and obligations under the Lease, in whole or in part, without providing thirty (30) days prior written notice to Lessee, and any such purported assignment without such notice shall be void. Lessor shall promptly file a copy of any such assignment notice with the Administrative Counsel by e-mail at leases@mail.house.gov. 12. Sale or Transfer of Leased Premises. Lessor shall provide thirty (30) days prior written notice to Lessee in the event (a) of any sale to a third party of any part of the leased premises, or (b) Lessor transfers or otherwise disposes of any of the leased premises, and provide documentation evidencing such sale or transfer in such notice. Lessor shall promptly file a copy of any such sale or transfer notice with the Administrative Counsel by e-mail at leases@mail.house.gov. 13. Bankruptcy and Foreclosure. In the event (a) Lessor is placed in bankruptcy proceedings (whether voluntarily or involuntarily), (b) the leased premises is foreclosed upon, or (c) of any similar occurrence, Lessor agrees to promptly notify Lessee in writing. Lessor shall promptly file a copy of any such notice with the Office of Finance, U.S. House of Representatives, B-245 Longworth House Office Building, Washington, D.C. 20515, and with the Administrative Counsel by e-mail at leases@mail.house.gov. 14. Estoppel Certificates. Lessee agrees to sign an estoppel certificate relating to the leased premises (usually used in instances when the Lessor is selling or refinancing the building) upon the request of the Lessor. Such an estoppel certificate shall require the review of the Administrative Counsel, prior to Lessee signing the estoppel certificate. Lessor shall promptly provide a copy of any such estoppel certificate to the Administrative Counsel by e-mail at leases@mail.house. gov. 15. Maintenance of Common Areas. Lessor agrees to maintain in good order, at its sole expense, all public and common areas of the building including, but not limited to, all sidewalks, parking areas, lobbies, elevators, escalators, entryways, exits, alleys and other like areas. 16. Maintenance of Structural Components. Lessor also agrees to maintain in good order, repair or replace as needed, at its sole expense, all structural and other components of the premises including, but not limited to, roofs, ceilings, walls (interior and exterior), floors, windows, doors, foundations, fixtures, and all mechanical, plumbing, electrical and air conditioning/heating systems or equipment (including window air conditioning units provided by the Lessor) serving the premises. V.S. Yfouse of &presentatives Washington, D.C. 20515 District Office Lease Attachment (Page 3 of 4 —114' Congress) 17. Lessor Liability for Failure to Maintain. Lessor shall be liable for any damage, either to persons or property, sustained by Lessee or any of his or her employees or guests, caused by Lessor's failure to fulfill its obligations under Sections 15 and 16. 18. Initial Alterations. Lessor shall make any initial alterations to the leased premises, as requested by Lessee and subject to Lessor's consent, which shall not be unreasonably withheld. The cost of such initial alterations shall be included in the annual rental rate. 19. Federal Tort Claims Act. Lessor agrees that the Federal Tort Claims Act, 28 U.S.C. §§ 2671- 80, satisfies any and all obligations on the part of the Lessee to purchase private liability insurance. Lessee shall not be required to provide any certificates of insurance to Lessor. 20. Limitation of Liability. Lessor agrees that neither Lessee nor the House nor any of the House's officers or employees will indemnify or hold harmless Lessor against any liability of Lessor to any third party that may arise during or as a result of the Lease or Lessee's tenancy. 21. Compliance with Laws. Lessor shall be solely responsible for complying with all applicable permitting and zoning ordinances or requirements, and with all local and state building codes, safety codes and handicap accessibility codes (including the Americans with Disabilities Act), both in the common areas of the building and the leased space of the Lessee. 22. Electronic Funds Transfer. Lessor agrees to accept monthly rent payments by Electronic Funds Transfer and agrees to provide the Office of Finance, U.S. House of Representatives, with all banking information necessary to facilitate such payments. 23. Refunds. Lessor shall promptly refund to the CAO, without formal demand, any payment made to the Lessor by the CAO for any period for which rent is not owed because the Lease has ended or been terminated. 24. Conflict. Should any provision of this Attachment be inconsistent with any provision of the attached Lease or attached Amendment, the provisions of this Attachment shall control, and those inconsistent provisions of the Lease or the Amendment shall have no force and effect to the extent of such inconsistency. 25. Construction. Unless the clear meaning requires otherwise, words of feminine, masculine or neuter gender include all other genders and, wherever appropriate, words in the singular include the plural and vice versa. 26. Fair Market Value. The Lease or Amendment is entered into at fair market value as the result of a bona fide, anus -length, marketplace transaction. The Lessor and Lessee certify that the parties are not relatives nor have had, or continue to have, a professional or legal relationship (except as a landlord and tenant). 27. District Certification. The Lessee certifies that the office space that is the subject of the Lease is located within the district the Lessee was elected to represent unless otherwise authorized by Regulations of the Committee on House Administration. V.S. Yfouse of Representatives Washington, D.C. 20515 District Difice Lease Attachment (Page 4 of 4 — 114" Congress) 28. Counterparts. This Attachment may be executed in any number of counterparts and by facsimile copy, each of which shall be deemed to be an original but all of which together shall be deemed to be one and the same instrument. 29. Section Headings. The section headings of this Attachment are for convenience of reference only and shall not be deemed to limit or affect any of the provisions hereof. IN WITNESS WHEREOF, the parties have duly executed this District Office Lease Attachment as of the later date written below by the Lessor or the Lessee. Tammy DeWeerd, The City of Meridian, an Idaho Municipal Corporation Raul R. Labrador Lo Print Name of Lessee Lessor Wnpfure Lessee Signature Name: w7 elf (JU i -e/ Title: fY�zaiL lz-j5�i�1 Date �— Date Froni the Member's Office, who isthe point of contact for questions? Name Dean Lester Phone f 202 1 425-9692 F. -mail riean lastar n..,aii i --- This District Office Lease Attachment and the attached Lease or Amendment have been reviewed andare approved, pursuant to Regulations of the Committee on House Administration. Signed Date 120 (Administrative Counsel) to: Administrative Counsel, 217 Ford Haase Office Building, Washington,D.C. 20515. Copies may also be faxed to 202-225-6999. District Office lease — Instructions No leases can be signed before they have been approved by the Administrative Counsel. District Office Leases for the 112" Congress may not commence prior to January 3, 2011. Members should endeavor to lease space through the last day of a congressional term rather than the last day of a calendar year. For the 112" Congress, leases should end on January 2, 2013, not December 31, 2011 • The opening paragraph has three blank lines to be filled in: 1. Landlord's name 2. Landlord's address 3. Member/Member-Elect's name • Paragraph 1 has four blank lines to be filled in: (1) Square footage of office that is being leased (optional); (2) Address of office being leased; (3) City, state and ZIP code where office is being leased; and (4) Number of parking spaces included (write "zero" if no parking spaces are included). • Paragraph 2 has two blank lines to be filled in: (1) Date lease begins and (2) Date lease ends (must be on or before January 2, 2013). • Paragraph 3 has one blank line for the monthly rent amount (write "zero" if no rent is to be paid). • Paragraph 4 has one blank line — the number of days notice required for either party to terminate the lease before the end of the term. A standard period is 30 days, but any figure is acceptable. If the lease may not be terminated early, enter "N/A" in this blank. • Paragraphs 5-7 may not be altered or deleted. • Paragraph 8 has space provided to list any additional lease provisions. • Prior to signing a lease, the Member/ Member -Elect must submit the proposed lease, accompanied by a copy of the District Office Lease Attachment, to the Administrative Counsel for review and approval. If the proposed terms and conditions of the lease are determined to be in compliance with applicable law and House Rules and regulations, the Administrative Counsel will notify the Member/Member-Elect that (s)he may proceed with the execution of the lease. Please submit the proposed lease and District Office Lease Attachment either by inter -office mail (217 Ford House Office Building), e- mail (leases@mail.house.gov), or fax (202-225-6999). • The Member/ Member -Elect is required to personally sign the document. • A signed and dated District Office Lease Attachment must accompany this lease. • Once signed by both parties, the Lease (and the Attachment) must be submitted to Administrative Counsel for final approval (217 Ford House Office Building). It may be faxed to 202-225-6999, but the original still must be submitted after faxing. • If approved, Counsel will send it to Finance so that payment can begin. If there are errors, you will be contacted and required to correct them before the lease is approved, V.S. Mouse of fpresentatives Washington, D.C. 20515 aYl1iL YIft Wan (Page 1 of2—version 1.12) Pursuant to 2 U.S.C. ¢ 57, and the Regulations of the Committee on House Administration (as modified from time to time by Committee Order) relating to office space in home districts, The City of Meridian, an Idaho Municipal Corporation 33 East Broadway Avenue, Meridian Id 83642 (Landlord's name) ("LESSOR'D, and Raul Labrador Representatives ('1.PSSEE'7, agree as follows: 1 812 (Landlord's street address, city, state. ZIP code) a Member/Member-Elect of the U.S. House of 1. LESSOR shall lease to LESSEE square feet of offim space located at Suite 251 at 33 East Broadway Avenue in the city, state and ZIP code of (office street address) Meridian, Idaho 83642 _ The Lease includes staff a<kingaceshi h (office city, state and ZIP) are Qasaigaed or Q✓ unassigned (please check one). p pa, w c 2. LESSEE shall have and hold the leased premises for the period beginning January 3. 2011 and ending January 2 .20 13 . The tern, of this District office Lease ("LEASE') may not exceed two years and may not extend beyond January 2, 2013, which is the end of the constitutional term of the Congress to which the Member is elected. 3, the monthly rent shall be $1,661.00 , and is payable in arrears on or before the last day of each calendar month. Rent payable under this LEASE shall be prorated on a daily basis for any fraction of a month ofoccupancy. 4. This LEASE maybe terminated by either party giving 30 days prior written notice to the other party. The commencement date of such termination notice shall be the date such notice is delivered or, if mailed, the date such notice is postmarked 5. During the effective term of this LEASE, rent payments trader paragraph 3 shall be remitted to the LESSOR by the Chief Administrative Officer of the U.S. House of Representatives ("CAO') on behalf of the LESSEE. V.S. Zouse offfresentatives Washington, D.C. 20515 awaftim (Page 2 of 2— version 1.12) 6. The District Office Lease Attachment attached hereto is incorporated herein by reference, and this LEASE shalt have no force or effect unless and until accompanied by an executed District Office Lease Attachment 7. Any amendments, additions or modifications to this LEASE inconsistent with paragraphs I through 6 above shall have no force or effect to the extent of such inconsistency. 8. Additionally, the LESSOR and the LESSEE agree The City of Maridlen, an Idaho Municipal Corporation n / Print Name (LESSOR /Landlord) v SSOR Signature (Date) Raul Labrador Name(LSSSEE) LESSEE Signature 2- Z�— Zo/o (Date) This District Office Lease must be accompanied by an executed DisMct Office Lease Attachment. LOCAL ADDENDUM TO DISTRICT OFFICE LEASE BETWEEN THE CITY OF MERIDIAN AND RAULLABRADOR The following additional terms and conditions shall be incorporated into the District Office Lease executed between the parties for the period of January 3, 2011 through January 2, 2013 to the extent that they are not inconsistent with the terms of the District Office Lease or District Office Lease Attachment executed herewith: 1. Common Areas. Tenant shall have the non-exclusive right to use all common areas located within the Building, including, but not limited to, entrance ways, foyers, elevators and restrooms, breakroom, exercise room, locker rooms and other areas intended to be used in common by all of the tenants of the Building and their invitees, and the common areas located on the land on which the Building is situated, including, but not limited to, the parking lot and sidewalks adjacent to the Building and all other areas on such land intended to be used in common by all of the tenants of the Building and their invitees (collectively, "Common Areas'). All persons authorized by Tenant to access the Building must arrange for an access card and parking pass from the City Human Resources Department and follow all usage rules related thereto. 2. General Use. The Premises shall be used only for the Local Congressional Office for staff of Rep. Raul Labrador and for no other use without the prior written consent of Landlord, which may be withheld in Landlord's sole discretion. Tenant shall not commit or allow to be committed any waste upon the Premises, or any nuisance or other act in or about the Premises that disturbs the quiet enjoyment of any other tenant in the Building. Tenant shall comply with all laws and regulations relating to its use or occupancy of the Premises or of the Common Areas. Tenant shall observe such rules and regulations for the Building as may be adopted by Landlord. 3. Surrender of Premises; Removal of Property. Upon expiration or termination of the Lease Term, whether by lapse of time or otherwise (including any holdover period), Tenant at its expense shall: (1) remove Tenant's goods and effects and those of all persons claiming under Tenant, (2) repair and restore the Premises to a condition as good as received by Tenant from Landlord or as thereafter improved, reasonable wear and tear excepted, and (3) promptly and peacefully surrender the Premises (including surrender of all improvements installed in the Premises by Landlord or Tenant, except Tenant's trade fixtures that do not become part of the Building). 4. Tenant's Improvements. hi the event that Tenant desires to undertake any improvements over and above Landlord's Improvements at Tenant's sole cost, Tenant shall do so only with the written approval of Landlord, such approval being in Landlord's sole discretion. Any such improvements shall be performed in a good and workmanlike manner in compliance with all applicable laws, codes and regulations, and all materials used shall be of a quality comparable to those in the Premises and the Building and shall be in accordance with plans and specifications approved by Landlord. All improvements (except Tenant's trade fixtures that do not become a part of the Building) shall remain in and be surrendered with the Premises at the expiration or sooner termination of this Lease. 5. Services and Maintenance. 5.1 Basic Services. Landlord shall provide mechanical, cooling, heating and ventilation during "Normal Business Hours," which means 7:00 a.m. to 6:00 p.m. on weekdays, excluding legal holidays. Landlord shall provide cooling, heating and ventilation at times other than Normal Business Hours upon Tenant's request and with reasonable notice to Landlord, and Tenant shall pay the costs thereof. If Tenant has special mechanical, cooling, heating, ventilation, electrical or other requirements, then the cost of furnishing, installing, operating and maintaining the equipment and appurtenances (including separate meters if required by Landlord to satisfy these requirements) shall be home by Tenant. Landlord shall not be liable for any loss or damage caused by or resulting from any variation, interruption or failure of such services unless caused by the negligence or wilful misconduct of Landlord, and no temporary interruption or failure of such services incident to the making of repairs, alterations or improvements or due to accident or strike conditions shall be deemed an eviction of Tenant or relieve Tenant from any of Tenant's obligations hereunder. 5.2 Basic Utilities. Landlord shall furnish water, sewer, electricity and natural gas service to the Premises and the cost of such utility service, including costs based on consumption, shall be the expense of Landlord. 5.3 Additional Utilities. Tenant shall purchase all other utility services, including but not limited to telephone, cable, internet, and television services desired by Tenant from the utility or municipality providing such service, and shall pay for such services when such payments are due. 5.4 Janitorial Services. Landlord agrees to furnish daily janitorial service for Tenant. Such service shall include sweeping or vacuuming of unrestricted floor areas in offices, emptying of waste paper receptacles and cleaning of restroom areas. 6. Entry and Inspection. Landlord at all reasonable times (and at any time in case of emergency) may enter the Premises for the purpose of inspection, cleaning, repairing, altering or improving the Premises or the Building subject to Tenant's reasonable security requirements. Landlord shall have the right at reasonable times to enter the Premises for the purpose of showing the Premises to any prospective tenants of the Building. 7. Business Interruption; Property of Tenant. No damages, compensation or claims shall be payable by Landlord for inconvenience, loss of business or annoyance arising from any repair or restoration of any portion of the Premises or the Building. Landlord will not carry insurance of any kind on any property of Tenant, including inventory, equipment, floor, ceiling and wall coverings, furniture and trade fixtures, and any improvements to the Premises that are paid for by Tenant and Landlord shall not be obligated to repair any damage thereto or replace the same. 8. Signs. Landlord agrees to place Tenant's name on the marquis board(s) located in the Building Common Areas using the design scheme established for the Building. The marquis signs provided by Landlord shall be the only Tenant identification allowed and Tenant shall not place on the exterior of the Premises or the Building or on any part of the interior of the Premises visible from the Building Common Areas any text, sign, graphic, decoration, or advertising matter. IN WITNESS WHEREOF, the Landlord and the Tenant have signed their name and affixed their seals the day and year first above written. TENANT: By Congre man Raul Labrador LANDLORD: By / SGP% Mayo;7yde Weerd Attest: C%�� �� TFO _ BEAL _ M 1� Meridian City Council Meeting DATE: December 9. 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: CDBG FUNDING APPROVAL FY2014 Community Development Block Grant Funding Approval Agreement MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS aIO*AENroFy U.S. Department of Housing and Urban Development mo IIIIIIII m2 Region X Portland Field Office e,9DEVE�'o Community Planning & Development Division &41 November 26, 2014 Sean Kelly CDBG Administrator City of Meridian Planning Department 33 East Broadway Meridian, ID 83642 Dear Mr. Kelly: SUBJECT: Program Year 2014 Funding Approval/Agreement 1220 Southwest Third Avenue, Suite 400 Portland, OR 97204-2830 (971)222-2610 FAX (971) 222-0357 I am pleased to inform you that HUD has obtained congressional release of the city's FY 2014 program award. This letter now transmits our FY 2014 CDBG grant agreement in the amount of $300,091 for the previously approved 2014 Annual Action Plan. Please have Mayor de Weerd execute all three of the enclosed CDBG Funding Approval/Agreements with an original signature and date, retain one copy for your records, and return the others within two weeks to: Mr. Doug Carlson Director, Community Planning and Development HUD Portland Field Office 400 SW 6h Avenue, Suite 700 Portland, OR 97204-1632 Please note that HUD's previous approval of the action plan does not constitute a determination that the activities are eligible and meet the statutory objectives of the authorizing legislation. The city is responsible for ensuring compliance with program requirements. Please also be reminded that funds may not be obligated or expended for activities that have not received environmental clearance, as required by 24 CFR Part 58. www.hud.00v/oreoon www.hud.aov/idaho 2 We look forward to working with you to support your ongoing work to meet the goals of the city's 2014 Annual Action Plan. If you have any questions about the enclosed comments or need technical assistance, please contact Murrianna Thomson, CPD Representative at 971-222-2621 or via email at Murrianna.K.Thomson@hud.rov. Sincerely, " A� / 0 0 - Doug Carlson Director, Community Planning and Development Enclosures 01 Funding Approval/Agreement U.S. Department of Housing and Urban Development Title I of the Housing and Community Office of Community Planning and Development Development Act (Public Law 930383) Community Development Block Grant Program CMB Approval No. HI -00515R of 20515R 2506-0193 (exp 1/31/2015) i.Name of Grantee (as shown in item 5 of Standard Form 424) Si /' �/(, f --Lr C/. (J� %� Q✓f i ✓ 3a. Grantee's 9 -digit Tax ID Number: 3b. Grantee's DUNS Number: 4. Date use of funds may Date (mm/dd/ ) I lalovauq 7. Category of Title I Assistance for this Funding Action (check only one) ® a. Entitlement, Sec 106(b) ❑ b. State -Administered. Sec 106(d)(1) ❑ c. HUD -Administered Small Cities, Sec 106(d)(2)(B) ❑ d. Indian CDBG Programs, Sec 106(a)(1) ❑ e. Surplus Urban Renewal Funds, Sec 112(b) ❑ I. Special Purpose Grants, Sec 107 r-1 g, Loan Guarantee, Sec 108 8. Special Conditions (check one) ® None ❑ Attached 9a. D D Received Submission ( dd/yyyy) 08/12/2014 begin (mm/dd/yyyy): City of Meridian, Idaho 90. Date of Start of Program Year (mm/dd/yyyy) 10/01/2014 82-6000225 028 451 367 10/01/2014 Form 33 East Broadway Meridian, ID 83642 B -14 -MC -16-0006 5c. Project/Grant No. 3 6b. Grant Agreement: This Grant Agreement between the Department of Housing and Urban Development (HUD) and the above named Grantee is made pursuant to the authority of Title I of the Housing and Community Development Act of 1974, as amended, (42 USC 5301 or seq.). The Grantee's submissions for Title 1 assistance, the HUD regulations at 24 CFR Part 570 (as now in effect and as may be amended from time to lime), and this Funding Approval, including any special conditions/addendums, constitute part of the Agreement. Subject to the provisions of this Grant Agreement, HUD will make the funding assistance specified here available to the Grantee upon execution of the Agreement by the parties. The funding assistance specified in the Funding Approval may be used to pay costs incurred after the date specified in item 4 above provided the activities to which such costs are related are carried out in compliance with all applicable requirements. Pre - agreement costs may not be paid with funding assistance specified here unless they are authorized in HUD regulations or approved by waiver and listed in the special conditions to the Funding Approval. The Grantee agrees to assume all of the responsibilities for environmental review, decision making, and actions, as specified and required in regulations issued by the Secretary pursuant to Section 104(g) of Title. I and published in 24 CFR Par[ 58. The Grantee further acknowledges its responsibility for adherence to the Aemement by sub-necin;ent entities to which it mnkec fnndi— h,.,..n„a—,.,naoua U.S. Department of Housing and Urban Development (By Name) Grantee Name Doug Carlson Tammy De Weerd Title Director, Community Planning 8c Development Title Mayor Batch Si /' �/(, f --Lr C/. (J� %� Q✓f i ✓ Date (mmlddlyyyy) 11/26/2014 Si 7---fo � � (mm/dd/yyyy) F Date (mm/dd/ ) I lalovauq 7. Category of Title I Assistance for this Funding Action (check only one) ® a. Entitlement, Sec 106(b) ❑ b. State -Administered. Sec 106(d)(1) ❑ c. HUD -Administered Small Cities, Sec 106(d)(2)(B) ❑ d. Indian CDBG Programs, Sec 106(a)(1) ❑ e. Surplus Urban Renewal Funds, Sec 112(b) ❑ I. Special Purpose Grants, Sec 107 r-1 g, Loan Guarantee, Sec 108 8. Special Conditions (check one) ® None ❑ Attached 9a. D D Received Submission ( dd/yyyy) 08/12/2014 10. check one ® a. Ong. Funding Approval ❑ b. Amendment Amendment Number 9b. Date Grantee Notified (mm/dd/yyyy) 11/26/2014 90. Date of Start of Program Year (mm/dd/yyyy) 10/01/2014 11. Amount of Community Development Block Grant FY (20FY( ) FY( ) a. Funds Reserved for this Grantee 3000,, 091 b. Funds now being Approved 300,091 Project Number Amount c. Reservation to be Cancelled (Item us 11b 0 12a. Amount of Loan Guarantee Commitment now being Approved 12b. Name and complete Address of Public Agency Loan Guarantee Acceptance Provisions for Designated Agencies: The public agency hereby accepts the Grant Agreement executed by the Department of Housing and Urban Development on the above date with respect to the above grant number(s) as Grantee designated to receive loan guarantee assistance, and agrees to comply with the terms and 12c. Name of Authorized Official for Designated Public Agency conditions of the Agreement, applicable regulations, and other requirements of HUD now or hereafter in effect, pertaining to the assistance provided it. Amount I Title Signature HUD Accounting use Only Effective Date Batch TAC Program Y A Reg Area Document No. Project Number Category Amount (mm/dd/yyyy) F FM 1153 78 U0ID 0 Project Number Amount � 1 Y Pro'ecIN b H Amount I t. Funding Approval/Agreement U.S. Department of Housing and Urban Development Title I of the Housing and Community Office of Community Planning and Development Development Act (Public Law 930383) Community Development Block Grant Program OMB Approval No. HI -00515R of 20515R 2506-0193 (exp 1/31/2015) 1.Name of Grantee (as shown in item 5 of Standard Form 424) !- Director, Community Planning & Development 3a. Grantee's 9 -digit Tax ID Number: 31b. Grantee's DUNS Number: 4. Date use of funds may Date (mmlddlyyyy) 11/26/2014 Date ( m/dcV ) jC9 begin (mmlddlyyyy): City of Meridian, Idaho 9a. D Received Submission 82-6000225 028 451 367 10/01/2014 33 East Broadway Meridian, ID 83642 B -14 -MC -16-0006 1 300,091 5c. Project/Grant No. 3 1 6c. Amount Approved Grant Agreement: This Grant Agreement between the Department of Housing and Urban Development (HUD) and the above named Grantee is made pursuant to the authority of Tine I of the Housing and Community Development Act of 1974, as amended, (42 USC 5301 et seq.). The Grantee's submissions for Title I assistance, the HUD regulations at 24 CFR Part 570 (as now in effect and as may be amended from time to time), and this Funding Approval, including any special conditions/addendums, constitute part of the Agreement. Subject to the provisions of this Grant Agreement, HUD will make the funding assistance specified here available to the Grantee upon execution of the Agreement by the parties. The funding assistance specified in the Funding Approval may be used to pay costs incurred after the date specified in item 4 above provided the activities to which such costs are related are carried out in compliance with all applicable requirements. Pre - agreement costs may not be paid with funding assistance specified here unless they are authorized in HUD regulations or approved by waiver and listed in the special conditions to the Funding Approval. The Grantee agrees to assume all of the responsibilities for environmental review, decision making, and actions, as specified and required in regulations issued by the Secretary pursuant to Section 104(g) of Title I and published in 24 CFR Pan 58. The Grantee further acknowledges its responsibility for adherence to the Agreement by sub -recipient entities to which it makes fundine assistance hereunder available. U.S. Department of Housing and Urban Development (By Name) Grantee Name Doug Carlson Tammy De Weerd Title Title !- Director, Community Planning & Development Ma Signa Date (mmlddlyyyy) 11/26/2014 Date ( m/dcV ) jC9 7. Category of Titl I Assistance for this Funding Action 8. Special Conditions 9a. D Received Submission 10. check one (check only one) a. Entitlement, Sec 106(b) ❑ b. State -Administered, Sec 106(d)(1) ❑ c. HUD -Administered Small Cities, Sec 106(d)(2)(B) ❑ d. Indian CDBG Programs, Sec 106(a)(1) ❑ e. Surplus Urban Renewal Funds, Sec 112(b) ❑ f. Special Purpose Grants, Sec 107 ❑ g. Loan Guarantee, Sec 108 (check one) ® None ❑ Attached - ( 08tified 14 yyyy) aAOri o Funding PP ❑ b. Amendment Amendment Number Grantee 9b. Date Grantee Notified (mm/dd/yyyy) 11/26/2014 90. Date of Stan of Program Year (mm/dd/yyyy) 10/01/2014 11. Amount of Community Development Block Grant FY (2014) FY( ) FY( J a. Funds Reserved for this Grantee 300,091 b. Funds now being Approved 300,091 c. Reservation to be Cancelled 11a minus 11b 0 12a. Amount of Loan Guarantee Commitment now being Approved 12b. Name and complete Address of Public Agency Loan Guarantee Acceptance Provisions for Designated Agencies: The public agency hereby accepts the Grant Agreement executed by the Department of Housing and Urban Development on the above date with respect to the above grant number(s) as Grantee designated to receive loan guarantee assistance, and agrees to comply with the terms and 12c. Name of Authorized Official for Designated Public Agency conditions of the Agreement, applicable regulations, and other requirements of HUD now or hereafter in effect, pertaining to the Title assistance provided it. . Signature HUD Accounting use Only Effective Date Batch TAC Program Y A Reg Area Document No. Project Number Category Amount (mm/dd/yyyy) FM 176 [Ell 00P Y P Y U �11I11111 ..... 1111 1 Project Number ProPro e� Amount I Amount I Funding Approval/Agreement U.S. Department of Housing and Urban Development Title I of the Housing and Community Office of Community Planning and Development Development Act (Public Law 930383) Community Development Block Grant Program OMB Approval No. HI -00515R of 20515R 2506-0193 (exp 1/31/2015) 1.Name of Grantee (as shown in item 5 of Standard Form 424) 3a. Grantee's 9 -digit -Tax ID Number: 31b. Grantee's DUNS Number: 4. Date use of funds may (mtnldd/yyyy) F Date ( m/ddl 1 J O 1) c) 7. C teg ry of Title I Assistance for this Funding Action (check only one) ® a. Entitlement, Sec 106(b) ❑ b. State -Administered, Sec 106(d)(1) ❑ c. HUD -Administered Small Cities, Sec 106(d)(2)(B) ❑ it. Indian CDBG Programs, Sec 106(a)(1) ❑ e. Surplus Urban Renewal Funds, Sec 112(b) ❑ I. Special Purpose Grants, Sec 107 ❑ g. Loan Guarantee, Sec 108 begin (mmlddlyyyy): City of Meridian, Idaho 82-6000225 028 451 367 10/01/2014 2. Grantee's Complete Address (as shown in item 5 of Standard Form 424) ) FY( ) 5a. ProjecVGrant No. 1 6a. Amount Approved 33 East Broadway It. Funds now being Approved B -14 -MC -16-0006 300,091 Meridian, ID 83642 c. Reservation to be Cancelled 11a minus 11 b 5b. Project/Grant No. 2 61b. Amount Approved 12a. Amount of Loan Guarantee Commitment now tieing Approved 12b. Name and complete Address of Public Agency Loan Guarantee Acceptance Provisions for Designated Agencies: 5c. Projecl/Gmnt No, 3 6c. Amount Approved brant Agreement 'I his t.irant Agreement between the Department of Housing and Urban Development (HUD) and the above named Grantee is made pursuant to the authority of Title I of the Housing and Community Development Act of 1974, as amended, (42 USC 5301 et seq.). The Grantee's submissions for Title I assistance, the HUD regulations at 24 CFA Pan 570 (as now in effect and as may be amended from time to time), and this Funding Approval, including any special conditions/addendums, constitute part of the Agreement. Subject to the provisions of this Gram Agreement, HUD will make the funding assistance specified here available to the Grantee upon execution of the Agreement by the parties. The funding assistance specified in the Funding Approval may be used to pay costs incurred after the date specified in item 4 above provided the activities to which such costs are related are carried out in compliance with all applicable requirements. Pre - agreement costs may not be paid with funding assistance specified here unless they are authorized in HUD regulations or approved by waiver and listed in the special conditions to the Funding Approval. The Grantee agrees to assume all of the responsibilities for environmental review, decision making, and actions, as specified and required in regulations issued by the Secretary pursuant to Section 104(g) of Tide I and published in 24 CFR Pan 58. The Grantee further acknowledges its responsibility for adherence to the Agreement by sub -recipient entities to which it makes fundin assistance hereunder available. U.S. Department of Housing and Urban Development (By Name) Grantee Name Doug Carlson Tammy De Weerd Title j ( Director, Community Planning & Development Title Batch P2 &1 Yl ✓ Date (mm/dd/yyyy) 11 /26/2014 I n (mtnldd/yyyy) F Date ( m/ddl 1 J O 1) c) 7. C teg ry of Title I Assistance for this Funding Action (check only one) ® a. Entitlement, Sec 106(b) ❑ b. State -Administered, Sec 106(d)(1) ❑ c. HUD -Administered Small Cities, Sec 106(d)(2)(B) ❑ it. Indian CDBG Programs, Sec 106(a)(1) ❑ e. Surplus Urban Renewal Funds, Sec 112(b) ❑ I. Special Purpose Grants, Sec 107 ❑ g. Loan Guarantee, Sec 108 8. Special Conditions (check one) None ❑ Attached 9a. Da Received Submission (m lyyyy) 08/12/2014 10. check one ® a. Orig. Funding Approval ❑ b. Amendment Amendment Number 9b. Date Grantee Notified (mm/dd/yyyy) 11/26/2014 9c. Date of Start of Program Year (mmlddlyyyy) 10/01/2014 11. Amount of Community Development Block Grant FY (2014) FY( ) FY( ) a. Funds Reserved for this Grantee 300,091 D It. Funds now being Approved 300,091 c. Reservation to be Cancelled 11a minus 11 b 0 12a. Amount of Loan Guarantee Commitment now tieing Approved 12b. Name and complete Address of Public Agency Loan Guarantee Acceptance Provisions for Designated Agencies: The public agency hereby accepts the Grant Agreement executed by the Department of Housing and Urban Development on the above date with respect to the above grant number(s) as Grantee designated to receive loan guarantee assistance, and agrees to comply with the terms and 12c. Name of Authorized Official for Designated Public Agency conditions of the Agreement, applicable regulations, and other requirements of HUD now or hereafter in effect, pertaining to the Pro a ct Num Title assistance provided it. Signature HUD Accounting use Only Effective Date Batch TAC Program Y A Reg Area Document No. Project Number Category Amount (mtnldd/yyyy) F 1153 76 [Ell = 0 O D Project Number Amount Pro a ct Num Amount Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: IDAHO SMART GROWTH PRESENTATION Idaho Smart Growth presentation: City Areas of Impact and Annexation MEETING NOTES Cjc Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: FINANCE DEPARTMENT Finance Department: Utility Billing Software Replacement Placeholder MEETING NOTES 9t ill -90 Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS C -/W IDR IAN;:---- UBS Project—Executive Summary Executive Summary: Utility Billing System Replacement Project Background Finance has been weighing the need to replace the Utility Billing System since early in 2012, when it became apparent upgrades to the Caselle system were not providing added value in terms of substantially reducing the billing cycle, increasing auditability of all transactions and automating integration with other core systems (Accela, Hansen/IPS) that need to share information. RFP Process Late in 2013, the Finance Department solicited assistance from Moss Adams, a consulting firm specializing in accounting controls and computer systems, with expertise in the utility industry. Moss Adams provided a team of experts who conducted requirements gathering sessions with Billing/Finance, Water, Planning & Development, Public Works and IT resources. A Request for Proposal for a new Utility Billing System was created from a needs assessment developed by Moss Adams, based on vetted requirements. The RFP was distributed August 12; seven software vendors responded. The City proceeded to evaluate the vendor responses based on: 1) Technical Requirements, 2) Functional Requirements, 3) Vendor Profile, 4) References and 5) Overall Cost. Recommendation After narrowing the selection from seven vendors down to two, the City hosted system demonstrations conducted by each vendor. Per the RFP, and based on the evaluation results of the two system demonstrations, the City sent an evaluation team to conduct an onsite performance audit of TruePoint Solutions' TrueBill system, recently deployed at the Sacramento Suburban Water District. The team used TruePoint's responses to the RFP requirements to ensure requirements that were addressed as "out of the box" by the vendor, were truly operational and met the intent of the respective requirement. The evaluation team unanimously voted to award TruePoint Solutions the contract. Next Steps The City plans to announce the final ranking and award of the contract December 10`h—subsequent to the announcement, the City will begin contract negotiations based on the City's standard terms and conditions, and the RFP's documented system requirements, scope of services and cost proposal response. The City is targeting to present the fully -approved contract to City Council on or before January 6, 2015. Project Cost, Duration The estimated 5 -year cost -to -own of the TrueBill Utility Billing (Customer Information) System, including installation, data migration, configuration, training, testing and implementation is $505,000; the capital budget for system replacement is $710,000. The duration, from initial "out of the box" installation through post -implementation could take up to twelve months. RECEIVED DEC 0 5 2014 CITY OF C-WEKZ CITY CLERKS OFFICE Rev. 12.08.2014 Page 1 of 1 Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: 6 PROJECT NUMBER: ITEM TITLE: Items Moved From Consent Agenda MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9. 2014 ITEM NUMBER: 8A PROJECT NUMBER: ITEM TITLE: INFORMATION SERVICES DEPARTMENT UPDATE Information Services Department: Department Update MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: FIRE DEPARTMENT REPORT Fire Department Report: Compliance Engine MEETING NOTES Q I Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9. 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: PUBLIC COMMENT - COMPLIANCE ENGINE Public Comment: Compliance Engine - Web Based Reporting Software MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS CITY OF MERIDIAN CITY COUNCIL PUBLIC COMMENT SIGN-UP SHEET DATE December 9, 2014 ITEM # Number: Project Name: Compliance E ine PLEASE PRINT NAME I FOR I AGAINST I NEUTRALI Vk? CITY OF BROTHERS ,QC - CIE(: i. '-i /-k" CITY OFCICs ID��- December 9, 2014 CITY CLERKS OFF19k Mayor Tammy de Weerd, Council members. I appreciate you all taking time to review my comments. The companies I represent (Taylor Brothers Fire & Safety and Taylor Brothers Inc.) have been in the valley for over 50 years. We have members in our company who are active board members on the Idaho Fire Protection Forum and National Fire Equipment Distributors Association. I have reviewed the Meridian 2011 -2016 Strategic Plan and applaud Meridian Fire Department for identifying the importance of putting plans into place that actively manage "Risk Reduction' to keep the community as safe as possible. To that end having a way to managing Inspection, Testing and Maintenance Reports (Inspection Reports) is a key component to your initiative. We too identified in 2006 that we must have a better way of collecting, storing and submitting our Inspection Reports. Thus, in 2006 we launched our first software tool to convert from a paper-based process to an automated "Digital" system. After over $250k in development and thousands of hours of field-testing, today we have a system that allows us to track and schedule inspection services, capture Inspection Report data on a digital device in the field and in less than a month our system will allow us to submit Inspection Reports digitally to the Idaho Survey and Ratings Bureau, AHJs and the Property Owner, eliminating double entry and increasing our overall efficiency and visibility. Many of our fellow Fire Equipment Distributors (FEDs) have also invested in their own programs and/or are purchasing programs from software providers who offer systems to assist them in running their businesses. I am confident that Digital Submissions of Inspection Reports will be a national requirement within the next 10 years. However, I respectfully disagree with The Compliance Engine and the other "Third Party Reporting" company's methodology. BROTHERS I want to quickly describe the current process. 1. How are Inspection Reports collected? a. Local Fire Equipment Distributors go onsite and inspect (Sprinklers, Alarms, Suppression Systems, Kitchen Exhaust Systems). b. This data is collected by the FED's on; I. Paper Report ii. Into one of many software tools a FED can purchase iii. Directly into the FED's own software they have developed that is integrated into their accounting system for billing and in many cases scheduling and inventory. 2. How Inspection Reports are distributed? a. To the Property owner for insurance reasons - Paper or E -Mail b. To the AHJ in the form that they request (either Digitally or in Paper form) c. To the Idaho Survey and Rating Bureau d. Into the FED's system for next inspection. When thinking of Inspection Reports we must realize that there are five distinct actions required. 1. Collection of data (in the field by FEDs) 2. Store the data 3. Share the data from all FED's 4. Analyze the data 5. Schedule the next required inspection The current Third Party model wants to leverage the "authority" the AHJ has to; 1. Compel the FED's to use their input tool, even though many of us have our own tools. 2. Have exclusive rights to Store the Data in their database 3. Be the exclusive conduit for the AHJ to view the FED Inspection Reports 4. Have control overall the data for Analysis and reporting to the AHJ. 0 BROTHERS My proposal; 1. Allow the FED's to select their own tools for collection and submission of Inspection Reports. 2. Meridian should develop or purchase a database that all reports can be submitted into. 3. Allow the FEDs to submit Inspection Reports directly into the Meridian database 4. Develop an RFP for The Compliance Engine and/or other analytics companies to organize the data into reports for the City. As a Fire Equipment Distributor I would rather pay a fee to the City of Meridian for the development and maintenance of the data base than be forced to pay a company that requires me to do double input into both my system and their system - especially since many of us already have the data in a digital form. If The Compliance Engine has good tools allow them to sell these tools to us and to the City of Meridian. Coming in and offering a "Free" tool to the city in exchange for the city forcing all FEDs to pay a per inspection fee is not "Free" to community, it can only be called one thing, a Tax, levied on the FED to be paid to a company outside the State of Idaho. I am confident that if the council will provide the time and support to the Meridian Fire Department we can develop a local solution that keeps more dollars here in Idaho and requires software companies to sell their products based on the value they provide to their users. ind Regal s, jai s e al CEO Taylor Brothers Fire & Safety and Taylor Brothers Inc. Taylor Brothers Fire & Safety and Taylor Brothers Inc. are located at; 3604 Banner Ave. Boise, Idaho 83709 Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: MERIDIAN PARKS AND RECREATION DEPARTMENT Public Hearing: Proposed Winter 2014-2015 Fee Schedule of the Meridian Parks and Recreation Department MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: 7B PROJECT NUMBER: ITEM TITLE: RESOLUTION Resolution No. mC)A: A Resolution Adopting the Winter 2014-2015 Fee Schedule of the Meridian Parks and Recreation Department; Authorizing the Meridian Parks and Recreation Department to Collect Such Fees; and Providing an Effective Date MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS CITY OF MERIDIAN RESOLUTION NO. A— BY THE CITY COUNCIL: BIRD, BORTON, CAVENER, MILAM, ROUNTREE, ZAREMBA A RESOLUTION ADOPTING FEE SCHEDULE OF THE MERIDIAN PARKS AND RECREATION DEPARTMENT; AUTHORIZING THE MERIDIAN PARKS AND RECREATION DEPARTMENT TO COLLECT SUCH FEES; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, following publication of notice according to the requirements of Idaho Code section 63-1311 A, on December 9th, 2014, the City Council of Meridian held a hearing on the adoption of the proposed Fee Schedule of the Meridian Parks and Recreation Department, as set forth in ExhibitA hereto; and WHEREAS, following such hearing, the City Council, by formal motion, did approve said proposed Fee Schedule of the Meridian Parks and Recreation Department; NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF MERIDIAN CITY, IDAHO: Section 1. That the Fee Schedule of the Meridian Parks and Recreation Department, as set forth in Exhihit A hereto, is hereby adopted. Section 2. That the Meridian Parks and Recreation Department is hereby authorized to implement and cant' out the collection of said fees. Section 3. That this Resolution shall be in full force and effect immediately upon its adoption and approval. 2014. ADOPTED by the City Council of the City of Meridian, Idaho, this 9th day of December, APPROVED by the Mayor of the City of Meridian, Idaho, this 9t1' day of December, 2014. ADOPTION OF FEE SCHEDULE OF MERIDIAN PARKS & RECREATION DEPARTMENT PAGE 1 OF 1 Exhibit A CITY OF MERIDIAN NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN pursuant to the ordinances of the City of Meridian and the laws of the State of .,aho, that the City Council of the City of Meridian will hold a public hearing at 3:00 p.m, on Tuesday, December 9'", 2014, at Meridian City Hall, 33 East Broadway Avenue, Meridian, Idaho, regarding the 2015 Meridian Parks and Recreation Department Fee Schedule, including proposed new fees as set forth below. Further information regarding these fees; as well as the entire Parks & Recreation fee schedule, is available at the Parks & Recreation Department at Meridian City Hall, 33 East Broadway Avenue, Meridian, Idaho, (208) 888-3579. Any and all interested persons shall be heard at the public hearing. Written testimony is welcome; written materials should be submitted to the City Clerk no later than 48 hours prior to the public hearing. All testimony and materials presented shall become property of the City of Meridian. For auditory, visual, or language accommodations, please contact the City Clerk's Office at (208) 888-4433 at least 48 hours prior to the public hearing. Park Reservation Fees!. 8th Street Park Shelter Rental (1 -3 0 people) $30.00 Multi -Use Field Rental(per hour) $10.00 Multi -Use Field Rental (full da) $75.00 Activily Guide Class Fees: Beginning Jazz $26.00 Cultures Around the World $48,00 Dance and Tumbling Ages 2 — 3 $25.00 Dance and Tumbling Ages 4 — Kindergarten $30.00 Emergence of Creativity: Ancient World $48.00 Free Yourself by De -Cluttering: The Feng Shui Way $35.00 Game Programming for Kids $135.00 Jazz 1 $33.00 Mini Tumble & Cheer $25.00 Tumble and Twist $35.00 Undercurrent: Teen Leadership Training $22.00 UnderCurrent: Teen Experience $35.00 Zomba Fitness I Day per Week) Zumba Fitness 2 Das per Week) $42.00 — $54.00 DATED this 21" day of November, 2014. PUBLISH on November 24th, 2014 and December 1't, 2014. ¢n A UGI� �r 9�W City of 1 r SEAL Et�F Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: PUBLIC WORKS Public Works: Meridian Floodplain Administration & Community Rating System (CRS) MEETING NOTES i )CU& p Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: $ PROJECT NUMBER: ITEM TITLE: MERIDIAN PARKS AND RECREATION DEPARTMENT Meridian Parks and Recreation Department: Rail With Trail Arterial Crossing Design Study Presentation by Project Engineering Consultants (PEC) MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS F,; 7 , oe i - rem 0 .Z co L Q U O n W CL Ira . .� ... * m: c ■� O m. u cr � W ow � ,� ( ƒ §/ ., , Ow § §} 0 z el 5M. / \ � .�: a 7 ~� : 1 .., . - � ^� �.. `� ^ � • / °g)�| . . .� ... * m: c ■� O m. u cr � W ow � ,� CIO 3: 4L 0 1 4-j C- CD 70 m 0 C13 o _0 m 0 IM =m N 8C) E< .0 o W Z KN 30 P:L77\ 1117mR 0 0 uj w I gul WX IM IM W `O. �/w' C Y / (U O QQJ B- W 2 a K F LL JF U 7 W Y Y 01 6t ip of iN i Yii( U)70 � �✓ iIi gT w 0 Z)y Z)z �LL x LL X W a+ Q+ IJAI az vs z �> ;gip} O N N co Iny, Lu IM W `O. Z w0 7 � L=L W V W O_. CCG�CCG_J C� G w ~ cb O CJ V W O_. CCG�CCG_J O O U3 N 64 O O O W O Efl O O O r (A a o O O 0 o O o O O o C O 3 N v � W � Q M K3 V N K} (A O 0 O O O O O O O O O O O O N r, N I,- (A M CO, N} 47 O O O O O O O O 3 lq- N O It Lo O LO O U) 6 (23, L O Ln O O N ._ 0 ( b4 L 63 _ N O N O U} O ER O a o O 0o O O r� wo O o � o M 3 ' EA W O N A N 6s a N O O 00 O O O N y0 O O UO N J EA N a O O O ~ O O O G +N+ O 7 M N N d ® L � U) Cl) LO � O O O O O O a N O O of m O Co CY LJ N U3 0 U a y N v aIC 10 a o m a O of O iy 6i H C J V9J9pp VV V;) \ O O U3 N 64 O O O W O Efl O O O r (A a O O O o O O o C O C v � w � M O V V (A 613 0 O O O O O O O O O O O O O r, M I,- N M N} K3 (A O O O O O O O O O 6 L L Ln O n V N M b4 ER 63 O O O O O O O O O O r� O � N M H3 EA EA v ` v v 0 o a N �a O C N N O M UO J ~ s L G O O ® L � •3 � � CY LJ LW CL '_ 7 4 1 L J ii MI ra V W 0 0co LO om �.7 o LO �i ( LL C) � N M Gly 61) 0 0 rl- I- 00 d o O co 6S r 6q 0 0 00 o 00 (D N O V Lr) K3 U} N N N cc lE 2 L L N N > > C :el. U+. ,' •i o®� , 4 o 0 00 0000 0 o -.40Z CL ae • 030 0 0000 000 R7 0 0 o O a; (D 75 v U L. �pY9/ peoyn un M s W +Irp Pw�tlg wl g Y _s •� 1 P{ M ° t .1L � � c (� e u 4 umtl irlearg 9 Ir � V ala } 1 MEN8 VOR C o w _ 4) ® o% CD N e � n c� U) a) i O U) 0) ry .�I m (� z L c 5 Q L c_ la E o cah cn � a 0. °2a W N U 0 ^) tea) ry a) E 0 W w A o CC �® 9 Y— C- 2 _C -, 2 NJ ca N .0 N Y p U a a) 0 r `—o' 0 a) =-o o o CO a a�6i 3 N O -p aS C N@ �] G (�6 C N N •f6 3 0 ca L .2 > T U a) rna C:N ca N m o s o as . o E o-14 ro m a) E 0 d m o V c a '� Q Z } m 3 if I° z V W Ii cn 112, ECD m _ co� a) m com � . .. U m _ 4-1 c� m Jc: W C O C � � � m m � m � 0 Jc 2 � � A W C � � 2 k g k 'ƒ @ E 0 2Q_ 3 o * / 0 k / / r 0 @ 3 m = @ 2 ® \ \ _ / j m E 0 5 0 % S §£ =1/ § @: @ % 7 / -0 $ 0 2E a) Eƒ k o 2 2 u m' 0 c @ / ƒ o \ - ƒ c / 0 m c- o m ._ Z 0 §.7 / k f E f 0 '\ \ E \ 3 * 2 3= a o B 3 G m ° o n 3 @// 0 0 � J- - E 0 2 m g o ® o CO ° m m o* 0 2±\£ k\ k � -i & 0 (D E / CO / k / 7 « ¢ / D ? / % _0 2* 2 E/ 2 @ m m 2 >1 o f c C: d 2 2§ b@ f/ fƒ\/ 2/ o/ / o f \ = / ® % ® � / ® f 2 / 2 \ \ $ k / % ƒ m > o m ca/ ° / m 2 / 0 � / / w ° = o@ A e o m o o . 0. 0 'm L-@ @ _ i• - E E _ ® o> . e ® Lo f/ 3/ f ELn 0/ k 0/ 0 m kco E // / % f k / \ \ . . . . . R ... § k § \ }\ 7 d k < § \ ¥ [ r p 2 § f § \ a L)§ b f u a . LU — .. . cn E a) CD v / Q N (Aq 0 tl/ L CL V = CL W — V CL I, spa N ilN T 0 N d 1 C p� h 4 � � h � � G U � Q O m m cu O N_ L O (a N_ O N C aO E O F- fA � O is L 0— U) U L_ Q C-) F Lf)_ T (4) U) (4) 0 ^W W (D Aon r � m Or`` ^_r_ W E O T N T 0')TT QU) VJ LO (V T U U i L C 0 Q N (Aq 0 tl/ L CL V = CL W — V CL I, spa N ilN T 0 d 1 C p� h � � h � � G U � Q O m m O N_ O N_ O N C aO E O F- � (4) U) (4) Aon r � cn E a) cn > C/) .� ry � m � 70 m / e / 2 \ t \ £ 3 ® M ¢ ƒ \ R 7 = R / Se (j) » ° \ ° ° ° /_ 2 CO ) G @ ƒ / / @ / * o f/ 7 2% 2 2 E 2 E $ n @ — 0 @ @ E % / / E C) @ o .� / \ \ f » U - " 2 \ J n 2 G f� a/ 0 2 0- f § C 9 c a _G Co — E s Q 0 % \ / �'7 ® / / � � / ° 3 3 6 0& e 2 2 c 2 Lr— % / ° 0 k / � 0 cn § / k 7§/ o@\ 3= om B\ L w w 3 G* w«@ 2 w o m � IW W � � @ U) / § § / 2 k o ~' @ 0 � $ IL . .... . .. w— . .... . . IW W � � cn E a) � > CO .co � � .� ry � n � ; V4, 0 Z W A W � �� / / 2� f/% 0 ■ %_o ƒ C £ > .� j 2 -a \ \ § � & B o � - c U 0 / / ƒfE § § m § Ir $ ®'a /k� a U) @ /$// CO o c E 2 3 m E R0 / / =3 A W � �� / k 0 ■ %_o ƒ m £ > m :F; -a \ [ § mak[ f_ / / § § m § Ir $ ®'a m a @ , / / o 2 / @ w 5 2 m P a) 722% / k $ / / $cc � e 2kf§ )/ \ »'ƒa/ /§ad $ % C/) U) \ [{ / 0 Cl)= / E § = m - 7 = on E O 8 7 S§ � \ ) \ A W � �� ■ � ƒ m - > [ mak[ 2 § / § Ir $ � m , A W � �� co E � � � � .� ry E E 0 0 $ S ? E � @ @ 0 0 q .g & 2 CL Q @ L) = 2$\ 2 § 2 �CU (D 2 2 - § a > CU _9@ CO 0 E 2 Z3 -1 @ 4-1 0 / U) •E 0 0 0 o $ ) .��..... O R - = 6:0 ■ (/ _ U) % 0 a L- \ m 4 U E 0 $ � � \ / G e % _ 0 � 0 0 o O / C: F .s 7 C m CY) (/).2 % 'm 0- $ -0 / $ $ � > E E 0 0 $ S ? E � @ @ 0 0 q .g & 2 CL Q @ L) = 2$\ 2 § 2 �CU (D 2 2 - § a > CU _9@ CO 0 E 2 Z3 -1 @ 4-1 0 / U) •E 0 0 0 o $ ) .��..... R - = 6:0 ■ (/ j 0 0 a L- IM W � �� r - = 6:0 ■ (/ CD IM W � �� cn_ U) E m / k 7 � / CD a. 4� J- k � � cn¢ 3 cn E � � � 7 � — .� � � .§ � � � 0 � Q c 0 � 0 Q �7 � W � �� U) J / k 7 � / CD a. § c 0. L- k � W � �� U) d'2 .... � W � �� 0 (E ) c/ / D] ry .M T\ L a) V W+ WY cc \ x X ow d r■ m > Q `r ., o z z Y � f6 U ya a ca o O +r ^n CL CLO O U , CO +L+ c ° v O v c 4-4 d C � d O m Na L Q W E L L O Q NN� 1.1. M Q o Q O z LI ■ ■ w °' a � a 3 0 V WY \ x X ow r■ `r O z z M Q o Q O z LI ■ ■ w °' a � a �77 ( t ( ( ( K E £ J §�� G■ % . ° � / = k � � o \ y / § 6 .%f / } f ¢ 6% R . c y / » / k� > � M \ / / 0 2 y e f % 0 k \ g « / s 7 °E \ \ k x s & o o B = a c@ c § 0 m E o 7 \ & 7 / / / f 2. 00/q / / E R \ C:) CO g 9 » g e @ o ±' J §�� G■ . ° � ■ 2 °U I W CL 13 A W O. cn E � cn � � Jc: � � .co ry M, I M � A W � ro E� a ■ �7(§ : _ / $ (D [ 0 2 f 2 /.\ § 0 «mom f w— \�k OC �\e �R \\\ LT� \}_@ E# 0. (D n± Im 2 E .77\ D> OR&= 3E � A W � ro E� a ■ �7(§ (D 0 2 f 2 § w— � A W � ro E� A W � ro E� (n E � � cn � � Jc: � � .� ry .� � W A W CL E� 3 9 = 0 k \ \ \ \ m 0 7 /6\� G\ 0 0 0 U)\ e / y »ƒ\\ /\ / Cl? § %.g e .. ( = _ e /(7 L o gyp§ �+%\ sae fM2§ 7'2- CL 2§§ / 2 \ \ ml \e=« m ¥ �� / E/ m m 4) -0 a) e e m zE o\\ 7// § 2 ` k2 0 § � � 2 f . Q / y: ! . w - A W CL E� E A -a U) �>^t vJ co .co ry 0 0 O o co cc U � O O L U }' c a) F- ^` L Y NM W OL (6 OO D C) a 3 E E y ? y ZU Dui M a� i ry ca 49 L Q v L c 0 O70 U � N O U L L C3 N O O ui -C O 0 0) O U tf o L L -0 c: ca 0) O 0 o E o O H E z2 — CO 0 �C� o N o4 o W O 70 U N or aS p ca 49 L Q v L ai E IM C1 N 0 w0. CD } Lu IM Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: CITY COUNCIL LIAISON COMMITTEE UPDATES City Council Liaison/Committee Updates MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: 9A PROJECT NUMBER: ITEM TITLE: ORDINANCE Ordinance No. I,-( - Il, d An Ordinance (RZ 13-010 —Three Corners Subdivision) For The Re -Zone Of A Three Parcels Of Land Located In The NW '/4 Of The NW '/4 Of Section 29, Township 4 North, Range 1 East, Boise Meridian; Establishing And Determining The Land Use Zoning Classification Of C -C (Community Business District), R- 4 (Low Density Residential), And R-8 (Medium Density Residential) Zoning Districts In The Meridian City Code; And Providing An Effective Date. MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS CITY OF MERIDIAN ORDINANCE NO. 11.1 " 3 BY THE CITY COUNCIL: BIRD, BORTON, ROUNTREE, ZAREMBA, CAVENER, MILAN AN ORDINANCE (RZ 13-010 — THREE CORNERS SUBDIVISION) FOR THE RE- ZONE OF A THREE PARCELS OF LAND LOCATED IN THE NW'/, OF THE NW 11, OF SECTION 29, TOWNSHIP 4 NORTH, RANGE 1 EAST, BOISE MERIDIAN, CITY OF MERIDIAN, ADA COUNTY IDAHO, ESTABLISHING AND DETERMINING THE LAND USE ZONING CLASSIFICATION OF C -C (COMMUNITY BUSINESS DISTRICT), R-4 (LOW DENSITY RESIDENTIAL), AND R-8 (MEDIUM DENSITY RESIDENTIAL) ZONING DISTRICTS IN THE MERIDIAN CITY CODE; PROVIDING THAT COPIES OF THIS ORDINANCE SHALL BE FILED WITH THE ADA COUNTY ASSESSOR, THE ADA COUNTY RECORDER, AND THE IDAHO STATE TAX COMMISSION, AS REQUIRED BY LAW; AND PROVIDING FOR A SUMMARY OF THE ORDINANCE; AND PROVIDING FOR A WAIVER OF THE READING RULES; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY OF MERIDIAN, COUNTY OF ADA, STATE OF IDAHO: SECTION 1. That the following described land as evidenced by attached Legal Description herein incorporated by reference as Exhibit "A" is within the corporate limits ofthe City of Meridian, Idaho, and that the City of Meridian has received a written request for re -zoning by the owner of said property, to -wit: David Dean. SECTION 2. That the above-described real property is hereby re -zoned from the R-40 (High Density Residential) zoning district to the C -C (Community Business), R-4 (Low Density Residential) and R-8 (Medium Density Residential) zoning districts, in the Meridian City Code. SECTION 3. That the City has authority pursuant to the laws of the State of Idaho, and the Ordinances of the City of Meridian zone said property. SECTION 4. That the City has complied with all the noticing requirements pursuant to the laws of the State of Idaho, and the Ordinances of the City of Meridian to re -zone said property. SECTION 5. That the City Engineer is hereby directed to alter all use and area maps as well as the official zoning maps, and all official maps depicting the boundaries and the zoning districts of the City of Meridian in accordance with this ordinance. RE -ZONE ORDINANCE — RZ 13-010 THREE CORNERS SUBDIVISION Page 1 of 3 SECTION 6. All ordinances, resolutions, orders or parts thereof in conflict herewith are hereby repealed, rescinded and annulled. SECTION 7. This ordinance shall be in full force and effect from and after its passage, approval and publication, according to law. SECTION 8. The Clerk of the City of Meridian shall, within ten (10) days following the effective date of this ordinance, duly file a certified copy of this ordinance and a map prepared in a draftsman manner, including the lands herein rezoned, with the following officials of the County of Ada, State of Idaho, to -wit: the Recorder, Auditor, Treasurer and Assessor and shall also file simultaneously a certified copy of this ordinance and map with the State Tax Commission ofthe State of Idaho. SECTION 9. That pursuant to the affirniative vote of one-half (1/2) plus one (1) of the Members of the full Council, the rule requiring two (2) separate readings by title and one (1) reading in full be, and the same is hereby, dispensed with, and accordingly, this Ordinance shall be in full force and effect upon its passage, approval and publication. PASSED BY THE CITY COUNCIL OF THE CITY OF MERIDIAN, IDAHO, this day of &Cpj .. m n , 2014. APPROVE, D BY THE MAYOR OF THE CITY OF MERIDIAN, IDAHO, this day of 2014. RE -ZONE ORDINANCE — RZ 13-010 THREE CORNERS SUBDIVISION Page 2 of 3 STATE OF IDAHO, ) ) ss: County of Ada ) On thisq%ay of De e EVYI 6t r 2014, before me, the undersigned, a Notary Public in and for said State, personally appeared TAMMY de WEERD and JAYCEE L. HOLMAN, known to me to be the Mayor and City Clerk, respectively, of the City of Meridian, Idaho, and who executed the within instrument, and acknowledged to me that the City of Meridian executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. (SEAL) M ae_ e 0.6 L NOTARY PUBLIC FOIDAHO IDAH'O,, //'' nn , r� RESIDING AT: � CCIL d (A}- -�- MY COMMISSION EXPIRES: S -d 9 — RE -ZONE ORDINANCE — RZ 13-010 THREE CORNERS SUBDIVISION Page 3 of 3 EXHIBIT A Legal Description Sawtooth land 5urvcymy, LLC ra�l:y4..wv_T[ N+ 008) 398 8104 r: (205) 396 43 105 10 1 ranal $t.. Cmnlett, In 8:3617 August21,2013 Three Corners Zone CC Legal A parcel of land located in the NW11/4 of the NW114 of Section 29, T. 4 N., R. 1 E., S.M., City of Meridian, Ada County, Idaho, more particularly described as follows; BEGINNING at a found brass cap marking the northwest corner of said Section 29; Thence South 89026'414 East, coincident with the north line of said NW114 of the NW114 of Section 29, a distance of 1036.58 feet; Thence South 0034'24" West, parallel with the east line of said NW114 of the NW1/4 of Section 29, a distance of 405.05 feet; Thence North 89025'36" West, 340.00 feet; Thence South 0034'24" West, parallel with said east line of said NW114 of the NW1/4 of Section 29, a distance of 178.64 feet; Thence North 89°22'30" West, 187.14 feet; Thence South 09°59'56" West, 509.08 feet to said west line of the NW114 of the NW1/4 of Section 29; Thence North 0°37'24" East, parallel with said west line of the NW1/4 of the NW114 of Section 29, a distance of 688.21 feet to the POINT OF BEGINNING, The above described parcel contains 12.62 acres more or less. Together with and subject to covenants, ^e--yKreatdction of record. End Description Pt5201W304e41OCK SOLID -THREE CORNERS SU�tnl;* gs30escdp11onsVONE CC.docx 1':ayW It Three Comers Subdivision RZ-13.010; . _. EXHIBI'I' A 5awtcoth Land 5urveying, LLC ';7l�ik;ZL�1:J7 7 P: (208).395-b 104 F: (208) 89843105 101 Canal 5c., Emmett, 10 63617 August 21, 2013 Three Corners Zone R-4 Legal A parcel of land located in the NW1/4 of the NW114 of Section 29, T. 4 N., R. 1 E., B.M., City of Meridian, Ada County, Idaho, more particularly described as follows; COMMENCING at a found brass cap marking the northwest corner of said Section 29; Thence South 89°26'41"East, coincident with the north line of said NW114 of the NW114 of Section 29, a distance of 35.00 feet; Thence South 0°37'24" West, parallel with the west line of said NW1/4 of the NW114 of Section 29, a distance of 40.00 feet; Thence South 89°28'41" East, parallel with said north line of the NW114 of the NW1/4 of Section 29, a distance of 1291.61 feet; Thence South 0034'24" West, coincident with said east line of said NW1/4 of the NW114 of Section 29, a distance or 365.14 feet to the POINT OF BEGINNING; Thence continuing South 0034'24" West, coincident with sold east line of the NW114 of the NW114 of Section 29, a distance of 919.46 feet to the southeast cornor of said NW1/4 of the NW1/4 of Section 29; Thence North 89036'15" West, 817,79 feet; Thence North 0°37'24" East, parallel with said west line of the NW1/4 of the NW114 of Section 29, a distance of 743.62; Thence South 89°22'36" East, 167,14 feet; Thence North 01424" East, parallel with said east line of the NW1/4 of the NW114 of Section 29, a distance of 178.54 feet; Thence South 89025'36" East, 630.00 feet to ilia POINT OF BEGINNING, PA4201W 3048 -ROCK SOLID -THREE CORNERS SUMDraWngslUescrollonsVONE R4.doox Pa tie 11 Three Comers Subdivision RZ-13-010, EXHIBIT A The above described parcel contains 16.59 acres more of less. Together with and subject to covenants, easements and restriction of record. Three Comers Subdivision RZ`13.010 EXHIBIT A Sawtooth Land 5urveying, LLC r" 1205) 398.81 04 r! (7015) 398 tl 10'S 1Q1 Cabal 5h., rnmott, IA 53617 August 21, 2013 Three Corners Zone R-8 Legal A parcel of land located in (he NW1/4 of the NW114 of Section 29, T. 4 N., R. 1 E„ B.M., City of Meridian, Ada County, Idaho, more particularly described as follows; COMMENCING at a found brass cap marking the northwest corner of said Section 29; Thence South 89°2641" East, coincident with the north line of said NW114 of the NW1/4 of Section 29, a distance of 1036.58 feet to the POINT OF BEGINNING; Thence continuing South e9"28'41"East, coincident with said north line of the NW114 of the NW1/4 of Section 29, a distance of 290,00 feet to the east line of said NW114 of the NWt/4 of Section 29; Thence South 0034'24" West, coincident with said east line of the NWIM of the NW1/4 of Section 29, a distance of 405.14 feet; Thence North 89025'36" West, 290.00 feet; Thence North 0°34'24" East, parallel with said east line of the NW1/4 of the NW114 of Section 29, a distance of 405.05 feet to the POINT OF BEGINNING. The above described parcel contains 2.70 acres more or less. Together with and subject to covenants, easements and restriction of record. PA2013113048-ROCK $OLIO -THREE CORNERS 8U8V)rawhgs%Descr1pU6n620NE R-8.docx Pagu 11 Three Comers Subdivision RZ-13.010; EXHIBIT 9 THREE CORNERS SUBDIVISION NO. 2 "C -C ZONE$ A PARM OF L40 LOO W X W NIF 114 OF OF UT MY 1/4 MOTION 89, M.., RIS., BX, MY OF XMIM, ADA COUNTY, MWO BOlO T OF BEGINNING NS 29 $�V'26'N" E 1076'x' C -C ZONE �^ � N 69'15 Jr4' W 34000 N- L— 6-89919 w s0u,e^a x fis7 w 167.14' A ROCK S.O##LID CIVIL Civil Engineering and Lend DOyelOPMent Consulting 181 Eest 50th Street, Gorden City, ID 63714 Office Phone: 208.342,3277 200 0 100 200 400 SCALE IN FEET 1" = 200' Three Comers Subdivision RZ-13.010; EXHIBIT.g THREE CORNERS SUBDIVISION NO. 2 "R-4 ZONE' S 891511' E d PARBi, OF L M WCAW N =MIA OF OF 7W Bf 1/4 XIMW A 35,00' LIR, RIR, RIL, CRY OF MWMW, ADA OVUM,, BM COR. S WR -24' W E013 40.00' IIS N ' ONT OF BEGINNING ZONE I N II _—.7__ �J N 09'361Tv' W 817.78 zoo o 100 200 aoo ROCK SOLID CIVIL Civil Engineering and Land Davaiopmant Consulting SCALE IN FEET 181 East 501h Street, Garden City, l0 83714 1 _ 200' Office Phone: 206.342.3277 v .racksolldcivlfcorn Three Comers Subdivision RZ-13-010 EXHIBIT$ THREE CORNERS SUBDIVISION NO. 2 'R--8 ZONE' A PARM OF LAND LOCAM Dr nff W 1/4 of Of nff ilk 1/4 lLG W 09, MY, AM.., DAL, MY Of WMIW, ADA OOtOVl1; MW M3 NW GOR,— S28--- POINT OF BEGINNING R-8 i* ZONE y ea 5%, W 2ao. A* 200 0 100 200 40o ROCK SOLID CIVIL Clvll Englneering and Lend Development Consulting SCALE IN FEET 181 East 50th Stroe4 Gordon City, ID 83714 1" = 200' Office Phone_ 209;342.3277 Three Comers Subdivision R7.-13-010, NOTICE AND PUBLISHED SUMMARY OF ORDINANCE PURSUANT TO I.C. § 50-901(A) CITY OF MERIDIAN ORDINANCE NO. 14 - PROVIDING FOR RE ZONING ORDINANCE An Ordinance of the City of Meridian granting re -zoning of three parcels of land located in the NW %4 of the NW %4 of Section 29, Township 4 North, Range 1 East, Boise Meridian, City of Meridian, Ada County. These parcels contain 12.52, 16.51 and 2.70 for a total of 31.73 acres more or less. Also, this parcel is SUBJECT TO all easements and rights-of-way of record or implied. As in attached exhibit `B" and is not based on an actual field survey. A full text of this ordinance is available for inspection at City Hall, City of Meridian, 33 East Broadway Avenue, Meridian, Idaho. This ordinance shall become effective on the day of . 2014. City of Meridian Mayor and City Council By: Jaycee L. Holman, City Clerk First Reading: Adopted after first reading by suspension of the Rule as allowed pursuant to Idaho Code 50-902: YES NO Second Reading: Third Reading: _ STATEMENT OF MERIDIAN CITY ATTORNEY AS TO ADEQUACY OF SUMMARY OF ORDINANCE NO. 14 - The undersigned, William L.M. Nary, City Attorney of the City of Meridian, Idaho, hereby certifies that he is the legal advisor of the City and has reviewed a copy of the attached Ordinance No. 14- of the City of Meridian, Idaho, and has found the same to be true and complete and provides adequate notice to the public pursuant to Idaho Code § 50-901A (3). DATED this day of 2014. William. L.M. Nary City Attorney ORDINANCE SUMMARY — RZ 13-010 — THREE CORNERS SUBDIVISION Page 1 Meridian City Council Meeting DATE: December 9, 2014 ITEM NUMBER: PROJECT NUMBER: ITEM TITLE: Future Meeting Topics MEETING NOTES Community Item/Presentations Presenter Contact Info./Notes CLERKS OFFICE FINAL ACTION DATE: E-MAILED TO STAFF SENT TO AGENCY SENT TO APPLICANT NOTES INITIALS