Loading...
HomeMy WebLinkAboutTask Order 10258 with CH2M Hill, Inc. for WWTP RAS Chlorination System OptimizationTASK ORDER NO. 10258 Under the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND CH2MHILL (ENGINEER) This Task Order is issued by Owner and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above named parties dated April 13, 2010. CITY OF MERIDIAN WASTEWATER TREATMENT PLANT RAS Chlorination System Optimization PURPOSE This task order is developed for CH2M HILL to provide operator training on topics related to the operation of the Meridian Wastewater Treatment Plant (WWTP). CH2M HILL will work with the WWTP Superintendent to determine the topics to present to the operations staff. CH2M HILL will provide the following services as part of this task: • Design improvements to the existing RAS chlorination system • Provide recommended operational parameters for the optimized RAS chlorination system • Provide assistance during the installation of RAS chlorination system improvements (by others). A technical memorandum will be provided as the deliverable for this task, including the following: • Schematic of the recommended RAS chlorination system improvements • Recommended instrumentation (model and type) • Recommended operational parameters The Anticipated Project Schedule: • Draft Technical Memorandum — completed within 21 days of notice to proceed Final Technical Memorandum — completed within 15 days of receiving City comments COMPENSATION The Not -To -Exceed amount for this Task Order No. 10258 is ten thousand dollars ($10,000). The hourly rates for services and direct expenses are per the Master Service Agreement. Costs will be billed for actual time services are rendered up to the Not -to -Exceed amount. No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City WWTP RAS CHLORINATION SYSTEM OPTIMIZATOIN Page 1 of 2 Project 10258 in the form of a Change Order. Billing will be through a purchase order (PO) with the Wastewater Treatment Plant Operations for consulting services. CITY OF M RIDI N BY: KEITH KAT -F9, Purchasing Manager Dated: _ g Departmnt Approval BY: r TITLE_�,4Pr,r�-teYlrlQr}� Dated: WWTP RAS CHLORINATION SYSTEM OPTIMIZATOIN Project 10258 CH2M HIL BY: MARK 13OWEN, CH2M HILL Dated:lA/11' Page 2 of 2