Loading...
HomeMy WebLinkAboutTask Order 10049b with Civil Survey Consultants, Inc. for WWTP Micellaneous Asphalt Repair Topgraphic Mapping SurveysTASK ORDER NO. 10049b Under the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND CIVIL SURVEY CONSULTANTS, INC (ENGINEER) This Task Order is made this I JTT day of November, 2011 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by CIVIL SURVEY CONSULTANTS, INC, hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated April 13, 2010. The Project Name for this Task Order 10049b is as follows: WASTEWATER TREATMENT PLANT — MISCELLANEOUS ASPHALT REPAIR TOPOGRAPHIC MAPPING SURVEYS SCOPE OF SERVICES Surveyor will provide professional surveying services related to the design of asphalt repair for four (4) locations at the Wastewater Treatment Plant totaling approximately 32,000 square feet. The services are at the direction of SPF Water Engineering. Task 1 — Topographic Survey 1.1 This task includes providing field surveys to locate edge of pavement, nearby facility features and spot elevations at an approximate 25 foot grid for use by SPF Water Engineering to generate a surface and contours. DELIVERABLES This task includes drafting of topographic mapping of field surveys and preparing data for submission to SPF Water Engineering. TIME OF COMPLETION Surveying services will be completed by November 30, 2011. COMPENSATION The Not -To -Exceed amount for this Task Order No. 10049b is One thousand seven hundred eighty-eight dollars ($1,788.00). The hourly rates for services and direct expenses are per the Master Agreement and by this reference made a part hereof. No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. Travel and meals are Task Order 10049b Page 1 of 2 WWTP Drying Basin Survey excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITAOFERIDJAN BYKES, Pu using Manager Dated: Department Approval BY: V4,j 1i1�i 5� TITLE: ccs Dated: Task Order 10049b WWTP Drying Basin Survey CIVIL SURVEY CONSULTANTS, INC } BY: Glenn Bennett, Presid nt Dated: [ 1-11-11 Page 2 of 2