HomeMy WebLinkAboutChange Order No. 10 with Brown Construction for Victory Road Sewer ConnectionCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 10 PROJECT NO. 10191 DATE: 5/10/2011 EFFECTIVE DATE: 5/10/2011 CONTRACTOR: BROWN CONSTRUCTION PROJECT: VICTORY ROAD SEWER CONNECTOR The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Install removable plug in diversion pipe to north. Reason for Change Order. The city would like to have the option of using the diversion sewer to the north through Glacier Springs Sub at a later date. This plug allows that rather than poring a concrete plug in the pipe. Attachments: 1. CO #9 from Brown Construction showing the increase in area and pricing for Asphalt 2. Purchase Order Requisition Form CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 365,115.75 Original Contract Times: 90 Net changes form previous Change Orders Net changes form previous Change Orders No._.L to _9_ No.. _ to _ (calendar days) $ 8,070.81 0 Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days) $ 373,186.56 90 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days) $ 350.00 0 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $ 373,536.56 90 APP 0 . ED TY PU LNG AGENT) ACCEPTED 6ntfat to¢ , r B . K ' Watts { Date: �, �, r Date. RECOMMENDED- (Assi nt City Engineer) DATE APPROVED BY COUNCIL. By: Clint Dolsby``��''ff)) NO SIGNATURE REQUIRED Date: S�Z4 t t ` DATE: