Loading...
HomeMy WebLinkAboutChange Order No. 07 with Brown Construction for Victory Road Sewer ConnectionCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 7 PROJECT NO. 10191 DATE: 4/13/2011 EFFECTIVE DATE: 4/13/2011 CONTRACTOR: BROWN CONSTRUCTION PROJECT: VICTORY ROAD SEWER CONNECTOR The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Replace a sewer manhole at the end of a sewer crossing with a T -Type cleanout. Reason for Change Order: Contractor was unable to install the above manhole due to conflicts with water and pressure irrigation and the constraint of the right of way. Attachments: 1. CO #7 from Brown Construction showing the net decrease in pricing regarding the installation of the T -Type cleanout. 2. Purchase Order Requisition Form CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 365,115.75 Original Contract Times: 90 Net changes form previous Change Orders Net changes form previous Change Orders No. 1 to 6 No. ,to (calendar days) $ 944.50 0 Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days) $ 366,060.25 90 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days) $ (2,712.00) 0 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $ 363,348.25 90 APPROVED: (CITY PURCHASI GAG 7) ACCEPT tact By: Keith Watts Date: Date: /Z — RECOMMENDED: (Engineering Technician) DATE APPROVED BY COUNCIL P By: John Boyd NO SIGNATURE REQUIRED Date:�/� �Q! f DATE: �e�ua etis>EJ��ctZerz roc. P.0— BOY 444 WMPA. 10 020124M!6 Vft 200.446.0274 Fw 200.460.7622 tr"e mor CITY OF MERIDIAN PUBLIC WORKS DEPARTMENT 4/13/2011 33 E. BROADWAY AVE. SUITE 200 MERIDIAN, ID 83642 CO#7 ATTN: JOHN BOYb r PROJECT CITY OF MERIDIAN: VICTORY ROAD SEWER CONNECTOR TRUNK-CO#7- REPLACE 48" MANHOLE W/ 8" TYPE "T" CLEAN-OUT Item # Item Description QTY UNITS UNIT PRICE BID AMOUNT 502.4.1.A.1 SANITARY SEWER MANHOLE -48" TYPE A 8" SEWER TYPE "T" CLEAN-OUT ASSEMBLY "SUBTOTAL" IDAHO PUBLIC WORKS PWC -C -10436 -AAA -1 1 EA $ 4,090.00 $ (4,090.00 1 EA $ 1,378.00 $ 1,378.00 $ (2,712.00 TOTAL $ (2,712.00) All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to the standard practices. Any alteration or deviation from the specifications involving extra costs, will be executed only upon written orders, and will become an extras charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. This proposal may be withdrawn by us if not accepted within 30 days. Authorized Signature: RICHARD BROWN Acceptance of Proposal, The attached prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment will be made for material and services as outlined in attached quote, and due on the 10th of each month. ACCEPTED: Name: J0 44 NJ BC) L'{ j] Signature: Date: /0"N LALi6R JOHN LAUER, ESTIMATOR