HomeMy WebLinkAboutChange Order No. 06 with Cascade Pipeline for NW 4th Sewer and Water Replacement ProjectCITY OF MERIDIAN
33 EAST BROADWAY AVENUE
MERIDIAN, ID 83642
CONTRACT CHANGE ORDER
Change Order No.: 6
Project Number:
10193b
Date:
7/22/2011
Effective Date:
7/22/2011
CONTRACTOR: Cascade Pipeline
PROJECT: NW 4th Sewer & Water Replacement
The Contractor is hereby directed to make the following changes from the Contract Documents and Plans.
Desciption:
Work Change Directive #11
$1,360 to 359095000
Reason for Change Order:
Increase in quantities
Attachments:
WCD 11
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIMES:
Original Contract Price: $328,855.25
Original Contract Completion Date:
Original Contract Completion Days:
Net changes form previous C.O.'s.:
Net Days change form previous C.O.'s:
No. 1 to 5
No. 0 to 0
$109,773.00
Contract Price Prior to this C.O.:
Contract Completion Date before this C.O.:
$438,628.25
Net Increase (decrease) of this C.O.:
Net Days Increase (decrease) of this C.O.:
$1,360.00
Contract Price with all Approved C.O.'s:
Contract Completion Date with all Approved C.O: s:
$439,988.25
RECOMMENDED: (PROJECT MANAGER)
ACCEPTED (C T C
BY: far
By:
Date: L(
Date:
APPROVED: (CITY PURCHASIN-" AGEA) t'
COUNCIL APPROVAL
d
By: Keith Watts {}. " j
Date:
Date.
APPROVED: (CITY)
ATTEST:
By: Mayor Tammy de Weerd
By: City Cleric, Jaycee Holman
Date:
Date:
WORK CHANGE DIRECTIVE
No. 011
PROJECT: NW 4TH STREET SEWER & WATER REPLACMENT
DATE OF ISSUANCE: July 22, 2011 EFFECTIVE DATE: July 22, 2011
OWNER: City of Meridian
Project No. 10193b
CONTRACTOR: Cascade Pipeline
ENGINEER: Civil Survey
You are directed to proceed with the following change(s):**
ITEM
DESCRIPTION QTY
UNIT
UNIT PRICE
TOTAL
503.4.1.A.3
4" PVC, ASTM D3034, Service Line Cleanout 2
EA
$300.00
$600.00
SP -2
Connect House to Sewer Service Line 1
EA
$250.00
$250.00
SP -5
Full Width Asphalt Driveway Repair 30
SY
$17.00
$510.00
$1,360.00
Purpose of Work Change Directive:
Increase in quantities.
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change
order based thereon will involve one or more of the following methods of determining the effect of the change(s).
Method of determining change in Contract Price:
® Unit Prices (See table above)
❑ Lump Sum
❑ Other
Method of determining change in Contract Times:
❑
Contractor's records
❑
Engineer's records
❑
Other
Estimated increase (decrease) in Contract Price: $1,360.00 Estimated increase (decrease) in Contract Times:
If the change involves an increase, the estimated amount Substantial Completion: 0 days; Ready
is not to be exceeded without further authorization. for final payment: 0 days. If the change
involves an increase, the estimated times are not to
be exceeded without further authorization.
AUTHORIZED by OWNER:
Roxanne Holland, Project Manager
By:
(Authorized Signature)
S:=PUBLIC WORKS-PROJECTS°.CITYICURRENT4SEWER LINE REPLACEMENTS - VARIOUS LOCATIONSISITES
31CONSTRUCTIONIWCD'S WCD 11.DOC