HomeMy WebLinkAboutChange Order No. 06 with Cascade Pipeline for NW 4th Sewer and Water Replacement ProjectCITY OF MERIDIAN 33 EAST BROADWAY AVENUE MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.: 6 Project Number: 10193b Date: 7/22/2011 Effective Date: 7/22/2011 CONTRACTOR: Cascade Pipeline PROJECT: NW 4th Sewer & Water Replacement The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Desciption: Work Change Directive #11 $1,360 to 359095000 Reason for Change Order: Increase in quantities Attachments: WCD 11 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $328,855.25 Original Contract Completion Date: Original Contract Completion Days: Net changes form previous C.O.'s.: Net Days change form previous C.O.'s: No. 1 to 5 No. 0 to 0 $109,773.00 Contract Price Prior to this C.O.: Contract Completion Date before this C.O.: $438,628.25 Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $1,360.00 Contract Price with all Approved C.O.'s: Contract Completion Date with all Approved C.O: s: $439,988.25 RECOMMENDED: (PROJECT MANAGER) ACCEPTED (C T C BY: far By: Date: L( Date: APPROVED: (CITY PURCHASIN-" AGEA) t' COUNCIL APPROVAL d By: Keith Watts {}. " j Date: Date. APPROVED: (CITY) ATTEST: By: Mayor Tammy de Weerd By: City Cleric, Jaycee Holman Date: Date: WORK CHANGE DIRECTIVE No. 011 PROJECT: NW 4TH STREET SEWER & WATER REPLACMENT DATE OF ISSUANCE: July 22, 2011 EFFECTIVE DATE: July 22, 2011 OWNER: City of Meridian Project No. 10193b CONTRACTOR: Cascade Pipeline ENGINEER: Civil Survey You are directed to proceed with the following change(s):** ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL 503.4.1.A.3 4" PVC, ASTM D3034, Service Line Cleanout 2 EA $300.00 $600.00 SP -2 Connect House to Sewer Service Line 1 EA $250.00 $250.00 SP -5 Full Width Asphalt Driveway Repair 30 SY $17.00 $510.00 $1,360.00 Purpose of Work Change Directive: Increase in quantities. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ® Unit Prices (See table above) ❑ Lump Sum ❑ Other Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other Estimated increase (decrease) in Contract Price: $1,360.00 Estimated increase (decrease) in Contract Times: If the change involves an increase, the estimated amount Substantial Completion: 0 days; Ready is not to be exceeded without further authorization. for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED by OWNER: Roxanne Holland, Project Manager By: (Authorized Signature) S:=PUBLIC WORKS-PROJECTS°.CITYICURRENT4SEWER LINE REPLACEMENTS - VARIOUS LOCATIONSISITES 31CONSTRUCTIONIWCD'S WCD 11.DOC