Loading...
HomeMy WebLinkAboutChange Order No. 06 with Brown Construction Victory Road Sewer ConnectionCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 6 PROJECT NO. 10191 DATE: 4/13/2011 EFFECTIVE DATE: 4/13/2011 CONTRACTOR: BROWN CONSTRUCTION PROJECT: VICTORY ROAD SEWER CONNECTOR The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Revise the type of asphaltic concrete (AC) for the areas that require restoration. Reason for Change Order: Ada County Highway District requires a different AC mix design for collector and arterial roads (Victory Road is) to a more ruobust mix design that uses a more expensive asphalt emulsion and larger aggregates. Attachments: 1. CO #6 from Brown Construction showing the Increase in pricing regarding the AC. 2. Purchase Order Requisition Form CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 365,115.75 Original Contract Times: 90 Net changes form previous Change Orders Net changes form previous Change Orders No. 1 to _L No._ to — (calendar days) $ (3,949.50) 0 Contract Price Prior to this Change Order. Contract Times prior to this Change Order. (calendar days) $ 361,166.25 90 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days) $ 4,894.00 0 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $ 366,060.25 90 APPROVED: (CITY PORCH IN EN ACCEPT o� By: Keith Watts Date: -7RECOMMENDE rDATEAPPROVED (Engineenng Tec nician) p BY COUNCIL By: John Boyd 1 J NO SIGNATURE REQUIRED Date: 4I1 DATE: