HomeMy WebLinkAboutChange Order No. 04 with Brown Construction for Victory Road Sewer ConnectionCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 4 PROJECT NO. 10191 DATE: 3/23/2011 EFFECTIVE DATE: 3/23/2011 CONTRACTOR: BROWN CONSTRUCTION PROJECT: VICTORY ROAD SEWER CONNECTOR The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Brown Construction will move MH#4 approximately 5-10If to the east to allow direct alignment with the outflow line from Observation Point. This allows direct connection using the Reliner Inside Drop Assembly to MH#4. MH#4 would be lined using the Spray Roc sealing system. This proposal would eliminate aprox. 73 If of 8" sewer pipe, 1 ea 48" MH; and aprox 59 If of Type "P" surface restoration. Reason for Change Order. Realigns MH #4 with Observation Point Lift Station Gravity Line and provides cost savings to the project by not requiring the extra materials to cross Victory Road. This CO also prevents having to close Victory Road, Attachments: 1. CO #4 from Brown Construction showing the reduction in pricing regarding MH #4. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 365,115.75 Original Contract Times: 90 Net changes form previous Change Orders Net changes form previous Change Orders No. 1 to _3_ No._ to (calendar days) $ (1,300.00) 0 Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days) $ 363,815.75 90 Net Increase (decrease) of this Change Order: Net increase (decrease) of this Change Order: (calendar days) $ (8,738.50) 0 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $ 355,077.25 90 APPROVED: (CITY PURC ASIN AEN ACCEP ontr erj By: Keith Watt Date: ,� � � Date: RECOMMENDED: (C truction Manager f DATE APPROVED BY COUNCIL By: John Boyd NO SIGNATURE REQUIRED Date: 3�/�p/� DATE: IDAHO PUBLIC WORKS PWC -C -10436 -AAA -1 TOTAL $ (8,738.50) All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to the standard practices. Any alteration or deviation from the specifications involving extra costs, will be executed only upon written orders, and will become an extras charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. This proposal may be withdrawn by us if not accepted within 30 days. Authorized Signature: MICHAEL 'BROWN Acceptance of Proposal The attached prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment will be made for material and services as outlined in attached quote, and due on the 10th of each month. ACCEPTED: Name: Jpp Signature: 1; Date: 6.3 & A f )OHN L-ALM51Z JOHN LAUER, ESTIMATOR PDsv/! DfNSaEi'�NC;1�DN NG• P.O. Box las NAMPA. 1O as 34)4" P09 zoo... ,. f.ua m..,ss-=.s: CITY OF MERIDIAN PUBLIC WORKS DEPARTMENT 3/23/2011 33 E. BROADWAY AVE. SUITE 200 MERIDIAN, ID 83642 REVISED-CO#4.2 ATTN: JOHN BOYD r PROJECT CITY OF MERIDIAN: VICTORY ROAD SEWER CONNECTOR TRUNK-CO#4- REVISED DESIGN MANHOLE #2 & MANHOLE #4 Item # Item Description QTY UNITS UNIT PRICE BID AMOUNT MANHOLE 44: REVISED ALIGNMENT TO EAST 501.4.1.B.A GRAVITY SEWER PIPE -8" PVC 73 LF $ 93.50 $ (6,825.50 502.4.1.A.1 SANITARY SEWER MANHOLE -48" TYPE A 1 EA $ 4,090.00 $ (4,090.00 307.4.1.F.1 TYPE P SURFACE RESTORATION 59 LF $ 93.00 $ {5,487.00 ADDITIONAL DROP MANHOLE ASSEMBLY 1 EA $ 1,364.00 $ 1,364.00 ADDITIONAL MANHOLE LINER 28 VF $ 225.00 $ 6,300.00 ADDITIONAL REMOVAL OF LIFT STATION VAULT/WET WELL 1 LS $ - $ - "SUBOTOTAL" $ (8,738.50 IDAHO PUBLIC WORKS PWC -C -10436 -AAA -1 TOTAL $ (8,738.50) All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to the standard practices. Any alteration or deviation from the specifications involving extra costs, will be executed only upon written orders, and will become an extras charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. This proposal may be withdrawn by us if not accepted within 30 days. Authorized Signature: MICHAEL 'BROWN Acceptance of Proposal The attached prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment will be made for material and services as outlined in attached quote, and due on the 10th of each month. ACCEPTED: Name: Jpp Signature: 1; Date: 6.3 & A f )OHN L-ALM51Z JOHN LAUER, ESTIMATOR