Loading...
HomeMy WebLinkAboutChange Order No. 03 with Ewing Company for WWTP Filters BuildingCITY OF MERIDIAN 33 EAST BROADWAY AVENUE MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.: 3 Project Number: 10160a Date: 9/22/2011 Effective Date: 9/22/2011 CONTRACTOR: Ewing Company PROJECT: WWTP Filters Building The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Desciption: Foundation revisions, abandon utilities, additional paving. Reason for Change Order: Utility conflicts Attachments: WCD-06, WCD-07, WCD-08, WCD-09, WCD-10, WCD-11 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $1,069,086.64 Original Contract Completion Date: Original Contract Completion Days: Net changes form previous C.O.'s.: Net Days change form previous C.O.'s: No. 1 to No. 0 to 0 $29,426.60 Contract Price Prior to this C.O.: Contract Completion Date before this C.O.: $1,098,513.24 Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $10,412.70 Contract Price with all Approved C.O.'s: Contract Completion Date with all Approved C.O.'s: $1,108,925.94 RECOMMENDED:(PROJECT MANAGER) ACCEPTED (CONTRACTO ) Date: C11 isf [ ( Date. APPROVED: (CITY PURCHASI AG COUNCIL APPROVAL B Keith Watts ,�•1 ' % IA t( P"0145 i #, C C t i 9 `Y Date: 9 „ 2-7 _ APPROVED: } ATTESTY By: Mayor Tamm a eerd _ 7. By: ,Cl erk,, J ee Holman Date: I l ate: "I ti tilifrt0',��� WORK CHANGE DIRECTIVE No. 006 PROJECT: WWTP FILTERS BUILDING DATE OF ISSUANCE: August 25, 2011 EFFECTIVE DATE: August 25, 2011 OWNER: City of Meridian Project No. 10160a CONTRACTOR: Ewing Company ENGINEER: CH2M HILL You are directed to the following change(s): No cost directive. The following resolutions to drilled pier locations were agreed upon by City, Engineer and Contractor. Contractor to proceed with drilling piers as outlined below. (Pier location numbers per attached sketch): Pier Location # Resolution Al CH2MHill to further investigate possible interference. Contractor will not drill until further instruction is provided by Engineer A4 Move pier cap 4" to west A6 Center of pier re -staked 12" toward NE corner of pier cap. Adjust pier cap 9" in same direction. Pedestal location to stay per construction plan. Use foam if necessary between pipe and bottom of pier cap. A7 No change — proceed with drilling as staked A8 No change — proceed with drilling as staked. If conflict becomes apparent after exposure, Contractor will notify City. A9 No change — proceed with drilling as staked. If conflict becomes apparent after exposure, Contractor will notify City. Al2 Conflict will be addressed when utility relocation is complete. Contractor to notify City when utility relocations are complete and center of pier has been staked. A13 Conflict will be addressed when utility relocation is complete. Contractor to notify City when utility relocations are complete and center of pier has been staked. A17 Conflict will be addressed when utility relocation is complete. Contactor to notify City when utility relocations are complete and center of pier has been staked. B20 CH2MHil1 to further investigate possible interference. Contractor will not place spread footing until further instruction is provided by Engineer. B21 Stake was moved 7.5" from grid line and 16.5" from center line of column. Contractor to proceed with new location. B24 No change — proceed with drilling as staked. B26 No change — proceed with drilling as staked. All other pier locations not addressed above will proceed with recommended solution per Work Change Directive 003 dated July 28, 2011. Purpose of Work Change Directive: Potential utility conflicts. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: I Unit Prices Lump Sum Other Estimated increase (decrease) in Contract Price: Not to Exceed 0 If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMEND by ENGINEER: an (Authorized Signature) Method of determining change in Contract Times: k Contractor's records Engineer's records Other Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED by OWNER: By: Roxanne Holland (Authorized Signature) WORK CHANGE DIRECTIVE No. 007 PROJECT: WWTP FILTERS BUILDING DATE OF ISSUANCE: August 29, 2011 EFFECTIVE DATE: August 29, 2011 OWNER: City of Meridian Project No. 10160a CONTRACTOR: Ewing Company ENGINEER: CH2M HILL You are directed to the following change(s): No cosi directive. Abandon non -potable water line located in utilidor along the east side of the secondary pump station Purpose of Work Chane Directive: If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Prices ❑ ® Lump Sum ❑ ❑ Other ❑ Contractor's records Engineer's records Other Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: Not to Exceed $0 Substantial Completion: 0 days; Ready If the change involves an increase, the estimated amount for final payment: 0 days. If the change is not to be exceeded without further authorization. involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: (Authorized Signature) AUTHORIZED by OWNER: By: Loi e J ( uthorized Signature) WORK CHANGE DIRECTIVE No. 008 PROJECT: W WTP FILTERS BUILDING DATE OF ISSUANCE: August 30, 2011 EFFECTIVE DATE: August 30, 2011 OWNER: City of Meridian Project No. 10160a CONTRACTOR: Ewing Company ENGINEER: CH2M HILL You are directed to the following change(s): Foundation Revisions per Design Clarification #4 issued on 814111 by CH2MHill and per attached pricing dated 8119111. The Prime Contractor, The Ewing Company and the subcontractor, Robert P. Jones Company shall not be responsible for any direct, indirect, incidental, or consequential damages occurring as a result of the excavation of the drilled pier sites for the Meridian WWTP Filters Building Project to equipment, structures, or material located below the surface of the ground which are not shown on the plans or marked in the field, and which are within the location of the sites for each of the drilled piers. Disclaimer shall only be inclusive of work completed in accordance with industry -accepted standards of caution and workmanship. In the event there is such an occurrence, and the city requests the Robert P. Jones Company to standby, Robert P. Jones shall be compensated for a standby time of a 4 man crew at $125.00/hour. If standby time lasts longer than 1 hour, subcontractor shall move to a different drilled pier site to resume operations while a repair or resolution is being completed. Purpose of Work Chane Directive: ._ Utility Conflicts If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Prices ❑ Contractor's records ® Lump Sum ❑ Engineer's records ❑ Other ❑ Other Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: Not to Exceed $3,012.00 Substantial Completion: 0 days; Ready If the change involves an increase, the estimated amount for final payment: 0 days. If the change is not to be exceeded without further authorization. involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: (Authorized Signature) AUTHORIZED by OWNER: By: �Wc,-v Authorized Signature) AwWwG Q MPAN Y .general contractors 1504 Eldorado, Suite 4 . Boise, Waho 83704 • i208) 377- 1500 Date: August 19, 2011 To: City of Meridian Attn: Roxanne Holland Re: Meridian WWTP Filters Building Project (Additional work per Design Clarification 04 Structural) Please see following pricing. Description QtV Price Excavation & Demo LS $2,850.00 Concrete Materials LS $2,855.00 Misc. Labor LS $2,716.00 Rebar LS $1,000.00 Railings (RFI#S) LS 2.970. Total $12,391.00 Overhead S 1239.00 Total $13,630.00 Profit $ 681.00 Total $14,311.00 Drilled Pier Credit LS ($11,299.00) Total $ 31012.00 Concrete material to Include all formwork, concrete, embeds, epoxy. Misc. Laborto include concrete forming, placing, & stripping, Installation of rebar, and installation of railings. On approval of pricing The Ewing Company requests a meeting to discuss time and money lost due to redesigns of foundation. Thank you, Ryan Steinwand/Project Manager E 4.1g16 R5E EXCAVATION 3826 E_ Wormwood Ct. + Boise. ID 83716 Phone: 861-8875 - Fax: 639--1416 Idaho Slate Coetweatoies Lloomme NKCr6s28720 Idako State Pab1Ea Works Liee=e 004'1364-8-4 Additional Work per Design,CYaritication #4 TO: The Ewing Company Date 08-19-11 Attn: Ryan Steinwand Estimator: Mike Basabe 'Subject to the terms hereof, we hereby agree to furnish all labor, material and equipment for the complatim, in a proressionai and workmanlike manner, of the work described belowee the following described properly. PROJECT, Meddignildi DESCRIPTION OFFoundation Pricing Demo DESCRIPTION QUANTITY UNIT PRICE TOTAL Excavate and Backfill for Proposed Column Footings 1 LS $1,ss0 Derno and Remove Concrete 1 LS $1,300 f GRANDTOTAL -- $2,850 'This proposal may be withdrawn if not aceepted within ten l2Dj days of Issuance. EXCLUSIONS: Permits, bonds, survey, layout, landscaping, additional work, testing and Inspection, hidden condkions, striping and dgnmge, rock excavation and dewatering. _. Mike Basabe Accepte=d (Buyer) Countersigned (Seller) 04/19/2011 14:31 FAL ZU88881188 HAltklU-ASW 1 SWIM; W woul/uul )fim�� Allik Ndff-ll-mmmrAK8 A 101VISIO" OF MARRi# OTBLL LTO L 1+1 c 2181 E LANARK MERIDIAN, IDAHO 83642 208888-0439 FAX DATE: if /z>// TO: COMPANY: FAX; NUMBER OF PAGES (INCLU INC3 COVER): SENDER: ,J FAX NUMBER: MESSAGE: %NW���4�8 se 720 Corporate Circle Unit J CO 80401-5628 PHONE: 303-279-5807 Website: www.goidenrailings.com FAX: 303-279-6214 OFFICE HOURS: 7:OOAM—4:OOPM MON—THURS. 7:00AM—10:00AM FRI. MISCELLANEOUS ESTIMATE Date: 7171201 l To: The Ewing Company Aan: Ryan Steinwand Subject: Mechanical Railing System Meridian, ID [WWTP] GRI Standard 3 -Rail System with 33 If. of "T' Toe Board 1-112" Sch. 40 6005-T5 Rail and 1-112" Sch. 80 6005-T5 Posts Arch. Class I Clear Satin Anodized Finish, .7 Mil (AAM 101M 12 -C22 -A41) G.R.I. 1s Quoting 5" x 8" Base Mounts Fasteners: 318" x 4-112" T304 Anchors w/ Hilti RE -500 -SD Epoxy Freight To Site Included Rivet Sub -Assembled If @ avg. per ft Rivet Assembled if @ avg. per ft a Friction Fit Sub -Assembled 41 If @ $ 35.85 avg. per ft = $ 1,470.00 «/.•/««* Friction Fit Assembled 41 If @ $ 43.17 avg. per ft = $ 1,770.00 Submittal 2 TO 3 weeks after receipt of Contract Drawings and Purchase Order. Delivery to Commence 6 TO 8 weeks after approved drawings for mechanical railing. *If a Brush Anodized Finish IAA -M32 -C22 -A411 is required, add $70.00 to the base bid and 4 weeks to delivery. **If O/P x 4-112" T304 Epoxy Anchors are required, add 530.00 to the base bid. ***Idaho PE Stamped Calculations not to exceed $1,200.00. TERMS: NET 30 DAYS NO RETENTION FREIGHT: F.O.B. PLANT, F.F.A. JOB SITE IN I SHIPMENT EXCLUSIONS : Tases, Iastatlatloo, Field dimensions, Tools, Embed tons, Lacquer, Ladder Returns, Plastic Wrap, Beveled Washers. Tae Board ships loose in full length for field attachment. If required Calculations by Eogineer registered In the state of Project. **Note. Dire ro AC131d apaekdix D, cwausion anchors will be excluder! fr in all}abs, " Thank You, Golden Rallings Inc. Sales Team Richard Kane, Ausda Adams & Russ Mazurik E -Mail: sates®goldrall.com EXPLORATORY DRILLING FOUNDATION INVEVIGATIONS ROBERT P. JONES CO. P,O. BOX 6093 BOISE, IDAHO 83707 TELEPHONE (208) 385•-0151 August 18, 2011 FAX# (208) 376-1481 Ewing Co. 1500 Eldorado Street Boise, Idaho 83704 Reference: Meridian Waste Water Treatment Filter Buildings including Addendum #1, #2, #3 Gentlemen: FOUNDATION CONSTRUCTION MONITORING WELL8 We re pleased to quote the following lump sum price for the drilled piers for the Meridian waste Water Treatment Filter Buildings including Addendum #1, 02, #3. This quote is per the plans and specifications of CH2M Hill dated April 11, 2011 plus changes since August 11, 2011. This price includes mobilization, demobilization, all excavation for drilled piers, removal of soil from site, furnishing all casing, dewatering, extraction of casing, placing rebar cages, placing of concrete, furnishing concrete, famish rebar cages and submittal of all reports. The prime contractor to locate center of drilled piers, coordinate location of all utility lines, famish permits and all testing. Our lump sum price for the drilled piers as listed in the bid documents is as follows: Filter Building (A) 13 - 36" dia. drilled piers........................$17,368.00 Filter Building (B) 7 — 36" dia. drilled piers ........................ • 8,517.00 Total Lump Sum Price ................................................ $25.885.00 The Prime Contractor, Ewing Company and Subcontractor -- Robert P. Jones Co. shall not be responsible for any direct, indirect, incidental or consequential damages occurring as a result of the excavation of the drill pier sites for the Meridian WWTP Filters Building to equipment, structures or material located below the surface of the ground and within the location of the sites for each of the drilled piers. In the event there is such an occurrence the Subcontractor shall be compensated for standby time of a 4 man crew at $125lhour. We plan to complete the drilled piers in 15 days or less, weather and working conditions permitting. If you have any questions, please let us know. Thank you. 1 is DESIGN CLARIFICATION A011111 CH7MHILL PROJECT: MERIDIAN WWTP FILTERS BUILDING CONTRACTOR: EWING CONSTRUCTION DC NO: 04Strurctural ._ DATE: 8/412011 PROJECT NO: 411539 Clarification Initiated By: CH2M HILL Response to Foundation Conflicts Identified by Ewing Regarding: FOUNDATION REVISIONS IN RESPONSE TO CONFLICTS WITH EXISTING UNDERGROUND UTILITY CONFLICTS 1. Sheet S101 (Re -issued) 2. Sheet S112 (NEW Sheet) 3. Sheet 5201 (Re -issued) 4. Sheet S202 (Re -issued) Wayne Kohler CH2M HILL 8/4/2011 Dale REV 10/95 FORM 270 10 "aC z a 0 z P! VA oil 6�ir }jHa�■�� IF it. q @A : £ � ;1111a it o CH2MHILL. lit $9g�� i � ���9s8 3�l39S3_6�9�Sidi439 WWTP ' °"01"' Gi0M1 "" WM !E oil 6�ir }jHa�■�� IF it. q @A : £ � ;1111a it o CH2MHILL. lit $9g�� ca4r�sr ✓u.�s..Meiidlan � ���9s8 3�l39S3_6�9�Sidi439 WWTP ' °"01"' Gi0M1 "" WM !E FOUNDATION PLAN F9tera 8uHding BY 1W0 8 Q0. M Oil�1i �� M �_ i� yFyF yy � pei Q i RA YAF 4 4�a oil 6�ir }jHa�■�� IF it. q @A : £ � ;1111a it o wam..u�ainwwwm CH2MHILL. lit ca4r�sr ✓u.�s..Meiidlan WWTP ' °"01"' Gi0M1 "" WM !E FOUNDATION PLAN F9tera 8uHding BY 1W0 wam..u�ainwwwm z IT :2 oil N�q MA q I M 1 21 1 M m z Ap m 0> (a CH2MH'LL* 9W.MW ENLARGEOPLANS. SECTIONS. AND DETAILS Meridian wwm FUters BuIWIng MUM (a I� CH2MHILL. Q. 7 WW„ fx,16,C/,710M2 Lm ,MMK * ii !■! O 2 Z s ? , DETAILS Fillers Building "D °A1 "�'� °X 0 oeox ■ 4 \\ c III it ` I � III CH2MHILL. Q. 7 WW„ fx,16,C/,710M2 Lm ,MMK ii !■! Meridian WWTP , wi wM,c s ? , DETAILS Fillers Building "D °A1 "�'� °X � oeox ■ i s III, 1i 13 50 Z ,m I it a�Ag i ps 4 CH2MHILL. til I iP " � VV� �I KIM' a�rATM se ww J F@Oerra SECTIONSND DETAILS Mg�w On wn+ n A 10 T;c=cmlj) i G a a 91 i s III, 1i 13 50 Z ,m I it a�Ag i ps 4 a "'��•°�'�"•am....°�'�"ne�'�rm.Y"�e"'��ea..r r.raP'��eTer"ri�iaSr'w�w'•'y'S'�'&a^'ia :�'� auwruaer. CH2MHILL. I iP VV� �I KIM' a�rATM se ww J F@Oerra SECTIONSND DETAILS Mg�w On wn+ n A 10 a "'��•°�'�"•am....°�'�"ne�'�rm.Y"�e"'��ea..r r.raP'��eTer"ri�iaSr'w�w'•'y'S'�'&a^'ia :�'� auwruaer. WORK CHANGE DIRECTIVE No. 009 PROJECT: WWTP FILTERS BUE,DING DATE OF ISSUANCE: September 8, 2011 EFFECTIVE DATE: September 13, 2011 OWNER: City of Meridian Project No. 10160a CONTRACTOR: Ewing Company ENGINEER: CH2M HILL You are directed to provide a price quotation for the following change(s): Cut/cap 2" waterline just outside of the utilidor. Coordinate with plant staff to shut off water prior to any work. Purpose of Work Change Directive: Request from plant staff to move the water line out from underneath the utilidor. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ❑ Unit Prices x Lump Sum ❑ Other Estimated increase (decrease) in Contract Price: 577.50 If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMEND by ENGINEER: Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED by OWNER: By: By: (Authorized Signature) Authorized Signature) )TWW,,NG OMPA NY eneral contractors 1500 Eldorado, Suite 4 s Boise. Idaho 83704 0 {208) 377.1600 September 13, 2011 To: Gty of Meridian Attn: Roxanne Holland Re: Meridian WWTP Building Project ( Additional Pricing Per WCD 009) Please see the following pricing. Description Cap 2" Waterline outside of Utilidor LS Overhead Profit Price $ 500.00 Total $ 550.00 27.50 Total $ 577.50 If you have any questions on above proposal, please contact me at the office or on my cell at 890-2278. Thank you, Ryan Steinwand Project Manager orY EXCAVATION 3828 E. Wormwood Ct. • Boise, ID 83718 Phone- 8451-8875 + Fax: 639 -1416 Rdtelee erste• contmetomes 6 ev. Nawc-asaao fdadw Stu" Pablio Works Uoeause 1110040e;4-Ei-4 PROPOSAL TO: The Ewing Company Attn: Ryan 5teinwand Date 09-12-11 Estimator: Mike Basabe RSubied to the terms hereof, we hereby agree to furnish aN labor, material and equipment for the completion, In a prop tonal and worka mlike manner, of the work dosalhed below on the folowlns described property. DESCRIPTION QUANTITY Relocate scum une t Relocate Waterline in Utilider 1 UNIT PRICE TOTAL L5 LS $500 DRANO TOTAL $1,350 *7hIs proposal may be withdrawn 0 not accepted whin ten 110) days of Issuance. EXCLUSIONS: Pesmibr bonds. sunray, IayotktrsfNc control, landuWng, additional work, testing and Inspection, hidden moons, striphts and sbam rock excavation end deweterb g. Mike Basabe Accepted (Buyer) Countersigned (Seller) WORK CHANGE DIRECTIVE No. 010 PROJECT: WWTP FILTERS BUILDING DATE OF ISSUANCE: September 13, 2011 EFFECTIVE DATE: September 13, 2011 OWNER: City of Meridian Project No. 10160a CONTRACTOR: Ewing Company ENGINEER: CH2M HILL You are directed to provide a price quotation for the following change(s): The following resolutions to drilled pier locations were agreed upon by City, Engineer and Contractor. Contractor to proceed with drilling piers as outlined below: Pier Location # Resolution A10 Move center of pier 4" to south and proceed with drilling Al2 Move center of pier 4" to east and proceed with drilling A16 No change — proceed with drilling as staked A17 Excavate a minimum of 5'-6" below pier cap to expose drain line. (If drain line is not exposed at this minimum depth, continue to excavate to a total of 6'-6" below pier cap until drain is located) Cut and cap drain line. Install corrugated casing at a depth of 5'-6" below pier cap backfill and compact around outside of casing and fill with concrete. All Excavate and install corrugated casing at a depth of 5'-0". Backfill and compact around outside of casing and fill with concrete. Purpose of Work Change Directive: Utility conflicts. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ❑ Unit Prices ® Lump Sum ❑ Other Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: Not to Exceed $1,542.50 Substantial Completion: 0 days; Ready If the change involves an increase, the estimated amount for final payment: 0 days. If the change is not to be exceeded without further authorization. involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: By: (Authorized Signature) AUTHORIZED by OWNER: r14j By: — --- (Authorized Signature) WING nMPANY general contractors 1500 Eldorado, Suite 4 0 Boise, Idaho 83704 • {2081 377-1500 Date: September 20, 2011 To: The City of Meridian Attn: Roxanne holland Re: Meridian WWTP Filters Building Project ( Additional Pricing per WCD 10) Please see the following pricing. Description QTY Price Excavate and Cap Drain line LS $ 350.00 Excavate,Backfill, Compact CMP LS $1,400.00 Modify &Set Cages & Pour Concrete LS 5 750.00 Total $ 2500.00 Overhead S 250.00 Total $ 2,750.00 Profit S 137.50 Total $ 2,887.50 Drilled Pier Credit L5S(I.345.001 Total $ 1,542.50 If concrete pumping is required add $ 420.00 to total. If you have any questions you can contact me at the office or on my cell at 890-2278. Thank you, X' z:::D :)7WO-004 Ryan Steinwand Project Manager ori EXCAVATION 3828 E. Wormwood Ct_ • Boise, ID 83716 Phone: 861-8875 + Fax: 639-1416 Idako State Contmw4ow's Wceaxse ORCB-28220 Idaho State F=bUc Wosrks Ucetlsse 9004364-B-4 PROPOSAL TO: The Ewing Company Attn: Ryan Steinwand Date 09-14-11 Estimator: Mike Basabe `Subject to the terms hereof, we hereby agree to furnish ail labor, material and equipment for the completion, in a professional and workmanlike manner, of the work described below on the following described property. PROJECT: Meridian WWTP Filters -0 uildines DESCRIPTION OF WORK: CMP Pier Columns and " Drain Pipe DESCRIPTION QUANTITY UNIT PRICE TOTAL Excavate and Cap 8" Drain Line 1 _ LS $350 Excavate 2 Pier Columns, Provide & Place 36" CMP 1 L5 $1,400 Assumed backfill around CMP to be native material. Materials 36" CMP (20' Length) 1 $800. _— S" M1 Cap and Accessorles - 1 $80 . - r k I I I GRAND TOTAL $1,750 *This proposal may be withdrawn if not accepted within ten 110j days of issuance. EXCLUSIONS: Permits, bonds, sunray, layout, traffic control, landscaping, additional work, testing and inspection, hidden conditions, striping and signage, rock excavation and dewatering. Mike Basabe Accepted (Buyer) Countersigned (Seller) WORK CHANGE DIRECTIVE No. 011 PROJECT: W WTP FILTERS BUILDING DATE OF ISSUANCE: September 21, 2011 EFFECTIVE DATE: September 21, 2011 OWNER: City of Meridian Project No. 10160a CONTRACTOR: Ewing Company ENGINEER: C112M HILL You are directed to the following change(s): • Cap and Abandon 4" scum line (RFI#13) • Sawcut & repave additional 2' outside of utilidor Purpose of Work Chane Directive: Utility conflicts. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ❑ Unit Prices ® Lump Sum ❑ Other Method of determining change in Contract Times: ❑ Contractor's records ❑ Engineer's records ❑ Other Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: Not to Exceed $5,2$0.66 . _ Substantial Completion: 0 days; Ready If the change involves an increase, the estimated amount for final payment: 0 days. If the change is not to be exceeded without further authorization. involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: AUTHORIZED by OWNER: By: _ _... By: t, (Authorized Signature) (A4thorized Signatu e) City of Meridian Attn: Roxanne Holland 33 E Broadway Avenue, Meridian ID 83642 Phone: 489-0416 Fax: 898-9551 Engineer: CH2M Hill 322 East Front Street Suite 200. Boise, IA 83702. P: (208) 345-5310. F: (208) 345-5315. City of Meridian WWTP Filters Building Project Subject Inteference @ A6 Pier General The Ewing Company, Inc. Contractor: Address: 1500 Eldorado Boise, ID 83704 Phone: (208) 377-1500 Fax: (208) 376-1481 To: Al Hofer Email: ahofer@ewinocomaany.com Fax: (208) 376-1481 Contractor: Ewing Address: Phone: Fax: Contractor's RFI No. Specification Section: Paragraph: Drawing Reference: Detail: RFI #13 Request: 4" scum line and elelectrical conduit were encountered at drilled pier A6 (as referenced in utility interference plan. Proposed Solution: 4" Scum line- Cap and Abandon (Please provide directive with locations/dimensions) Electrical Conduit — Relocate (Please provide directive with locations/dimensions) ❑ Attachments: Bv: Ryan Date: 9107111 Response: Cap the scum line north of the drilled pier location and pour thrust block to safeguard the line. Repair electrical lines that were damaged and relocate to the north near the asphalt cut to avoid further damage during drilling of the pier. Please make redlines of these changes on the construction plans. ❑ Attachments: By: Roxanne Holland Slanalure Date: 918111 JLMWWING QMPANY general contractors 1500 Eldorado, Suite 4 Boise, Idaho 83704 • (208) 377-1500 Date: September 19, 2011 To: City of Meridian Attn: Roxanne Holland Re: Meridian WWTP Filters Building Project (Additional Pricing per RFI #13) Please see the following pricing. Description QTY Scum Line Ex/Cap/Backfill LS Overhead Profit Price $ 850.00 85.00 Total $ 935.00 46.75 Total $ 981.75 if you have any questions on the above proposal, please contact me at the office or on my cell at 890-2278. Thank you, Ryan Steinwand Project Manager �rl ORSE EXCAVATION 3828 E. Wormwood Gt. + Boise, ID 83716 Phone: 851-8875 -w Fax: 639-1416 Idaho Miele Qvafareetlesr s; Liveasse #RCE -28720 Make Male Pesblile Vowks Liaease #004364.W4 PROPOSAL TO: The Ewing Company Attn: Ryan Steinwand Date 09-12-11 Estimator: Mike Basabe 'Subject to the terms hereof, we hereby agree to furnish all Tabor, materfal and agwpmant for the completion, in a professlonal and workmanlike manner, of the work dasalbed below an the fabowmil described property. s � • a •;. a is i� . _ , This proposal may be withdrawn If not aecepled within ten (10) days of issuann. EXCLUSIONS: Peranits, bonds, survey, layout, traffic control, landscaping, additional work, testing and Inspection, hidden conditions, stripim and signage, rock excavation and dewatering. Mike Basabe Accepted (Buyer) Countersigned (Seller) )MING 7 ANY gent contractors 1500 Eldorado, Suite 4 • Roise, Idaho 83704 • {208i 377.150€3 September 13, 2011 To: City of Meridian Attn: Roxanne Holland Re: Meridian WWTP Filter Buildings Project ( Additional Paving Patch Option)Revised Please see the following pricing, Description CITY Price Demo/Paving Patch at Utilidor LS $ 3,722,00 Overhead S 372,20 Total $ 4,094.20 Profit 204,7 Total $ 4,298.91 If you have any questions on above proposal, please contact me at the office or on my cell phone at 890 2278. Thank you, Ryan 5teinwand Project Manager r ORSE EXCAVAT10N 3828 E. Wormwood Ct. + Boise, ID 83716 Phone: 861 -8875 • Fax: 639-1416 Idaho State Contractor's Liceaase #RCE■28720 Idaho State pobRa Works License 0004384484 PROPOSAL TO: The Ewing Company Attn: Ryan Steinwand Date 09-12-11 Estimator: Mike Basabe *Subject to the terms hereof, we hereby agree to furnish all labor, material and equipment for the completion, in a professional and workmanlike manner, of the work described below on the following described property. PROJECT: Meridian WVffP Filters Buildings DESCRIPTIQN OF WORK: Additional Wilidor Paying (REVISEDI DESCRIPTION QUANTITY UNIT PRICE TOTAL Sawcut U_tilidor Asphalt 360 LF _ — $3/LF $1,080 Demo AC _ 94 SY $3/SY $282 Prep Patch with 3/4" Road Mix 84 SY $2.10/SY $176 Patch Back Asphalt 84 SY i $26/SY $2,184 w I GRAND TOTAL —` $3,721 'This proposal maybe withdrawn if not accepted within ten (10) days of issuance. EXCLUSIONS: Penults, bonds, survey, layout, traffic control, landscaping, additional work, testing and inspection, hidden conditions, striping and signage, rock excavation and dewatering. Mike Basabe Accepted (Buyer) Countersigned (Seller)