Loading...
HomeMy WebLinkAboutChange Order No. 01 with Knife River for McMillan Road Water MainCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83642 CONTRACT CHANGE ORDER N E ORD NO.OJECT NO. f 10230a E: 6/1/2011 ECTIVE DATE: 6/1/2011 CONTRACTOR: KNIFE RIVER CORPORATION PROJECT: MCMILLAN ROAD WATER MAIN The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Removal of 12" water main stubs from Contract - Locations are STA 62+86.00 an463+72.00 Although each stub being removed from the Contract has two valves apiece associated with it, only three will be removed from the Contract. One vaive is to be installed at the east side of the tee for the stub at 57+24.00 Excess blow -offs shall be salvaged to the Water Division Reason for Change Order: Neighboring property owners decided not to pay for these stubs. Adjustments to Quantities: Less 44 LF of 12" PVC Less 3 12" Gate Valves Less 2 "Relocate Blow-ofr' CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 159,485.06 Orlgina Contract Times, 40 Net changes form previous Change Orders Net changes form previous Change Orders No._ to _ No.,_, to _ (calendar days) $ - 0 Contract Price Prior to this Change Order. Contract Times prior to this Change Order. (calendar days) $ 159,485.06 40 Net decrease of this Change Order: Net Increase (decrease) of this Change Order. (calendar days) $ (8,208.00) 0 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $ 151,277.06 40 APPROVED: (CITY PuRcHA ING E ACC U. Contractor) Y. By: Keith Watts Date: —71f ( Date: 7- 0 RECOMMENDED: (Construction Manager) DATE APPROVED BY COUNCIL By: Tim Cums C� NO SIGNATURE REQUIRED Date: �_ DATE: