Loading...
HomeMy WebLinkAboutChange Order No. 01 with JUB Engineers for Victory Road Sewer ConnectorCITY OF MERIDIAN 33 EAST BROADWAY MERIDIAN, ID 83842 CONTRACT CHANGE ORDER CHANGE ORDER NO. 1 PROJECT NO. 10191a DATE: 3/21/2011 EFFECTIVE DATE: 3/21/2011 CONTRACTOR: JUB ENGINEERS PROJECT: VICTORY ROAD SEWER CONNECTOR The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Evaluate realignment options, additional survey staking and review of submittals relating to re- alignment options. Reason for Change Order: The city looked at several options to re -align the sewer design and JUB assisted from a technical point. The city also authorized more survey staking to facilitate sewer line installation and the contractors ability to install the line closer to tolerance than normal due to depth and flat grades. JUB will need to review several submittals regarding changes that were made to the original installation that will ultimately save the city money on the project. Attachments: Authorization for Additional Services No. 1 to Task Order # 10191A. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ $ 29,034.00 Original Contract Times: 0 Net changes form previous Change Orders Net changes form previous Change Orders No.— to. _ No._ to_ (calendar days) $ - 0 Contract Price Prior to this Change Order: Contract Times prior to this Change Order: (calendar days) $ 29,034.00 0 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days) $ 3,710.00 0 Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (calendar days) $ 32, 744.00 0 APPROVED: (CITY I A T) ACCEPT D: (contractor) f' By: Keith Watts � By: Dale: �lZ r Date: S64 (o RECOMMENDED: Construction Manager) DATE APPROVED BY COUNCIL. �. By: 3 2 r Zd k I NO SIGNATURE REQUIRED Date: DATE: ��E IDIZ IAN�- �.J PURCHASING AGENT 33 E. Broadway Ave, Meridian, ID 83642 Phone: (208) 888-4433 x 417 Fax: (208) 887-4813 AUTHORIZATION FOR ADDITIONAL SERVICES NO. 1 TASK ORDER NO. 10191A Between CITY OF MERIDIAN AND J -U -B Engineers, INC. This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated April 13, 2010, VICTORY ROAD CONNECTOR DESIGN SERVICES SCOPE OF SERVICES 1) Assist the CITY in evaluating realignment options to avoid the power poles east of the Kennedy Lateral. 2) Set horizontal and vertical control at 100' intervals and recalculate and re -stake the site based on moving Manhole #1. 3) Review the contractor's plan to remove the existing lift station and wet well and move manhole #4 North approximately 15'. Review contractor submittals (2) for the substitution of inside drops at Manholes #2 and #4. TIME OF PERFORMANCE J -U -B will perform the above noted work at the CITY's request. Per the original staking agreement, the contractor will provide 48 hours notice for staking requests. J -U -B will review and respond in writing to the above noted contractor submittals within 24 hours. COMPENSATION Create a new task 3.5 Additional Services — with a total not to exceed budget of $3,710.00, broken down as follows: 1) $750.00 2) $2400.00 3) $560.00 CITY OF MERIDIAN Approved as to Content BY: KEITH WATTS, PURCHASING AGENT Dated: Department Approval BY: TITLE: 9W Dated: S&, 2 11 ENGINEER: J -U -B Engineers, INC. 250 S. Beechwood Ave, Ste. 201 Boise, 1{)83709 , BY:- I .. Phillip H. Kri hbaum, PS —Area Manager