HomeMy WebLinkAboutChange Order No. 01 with Ewing Co. for WWTP Filters BuildingCITY OF MERIDIAN 33 EAST BROADWAY AVENUE MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.: 1 Project Number: 10160a Date: 7/2812011 Effective Date: 7/28/2011 CONTRACTOR: Ewing Company PROJECT: WWTP Filters Building The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Desciption: Exploratory excavation & RAS line abandonment per WCD_01 Reason for Change Order: Utility conflicts Attachments: W CD_01 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $1,069,086.64 Original Contract Completion Date: Original Contract Completion Days: Net changes form previous C.O.'s.: Net Days change form previous C.O.'s: No. 0 to 0 No. 0 to 0 $0.00 Contract Price Prior to this C.O.: Contract Completion Date before this C.O.: $1,069,086.64 Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $8,592.50 Contract Price with all Approved C.O.'s: Contract Completion Date with all Approved C.O.'s: $1,077,679.14 RECOMMENDED: (PROJECT MANAGER) ACCEPTED (CONTRACTOR) By..; v` <JG By: Date: - Date: % Z APPROVED: (CITY PURCHAS G A NT) COUNCIL APPRO Al- LBy: By:Keith Watts Date: - 3 Date: APPROVED: (CITY) ATTEST: /� By: Mayor Tammy de Weerd I By: City Clerk, Jaycee Holman r Date: Date: WORK CHANGE DIRECTIVE No. 001 PROJECT: W WTP FILTERS BUILDING DATE OF ISSUANCE: July 8, 2011 EFFECTIVE DATE: July S, 2011 OWNER: City of Meridian Project No. 10160a CONTRACTOR: Ewing Company ENGINEER: CH2M HILL You are directed to provide a price quotation for the following change(s): • Cap existing RAS line running along west side of buildings. Removal of pipe downstream of cap with backfill/compaction as outlined in response to RFI #7. Confirm with plant staff prior to work that it is the correct line being removed. Exploratory excavation near pier locations for utility depth conflicts. Contractor to explore up to 7 locations as shown in attached sketch. City will not be charged for locations that are not excavated beyond pier cap depths. Location 2 & S eliminated due to removal of RAS line that was in conflict with those piers. Purpose of Work Change Directive: Response to RFI #7. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: x Unit Prices Lump Sum Other Estimated increase (decrease) in Contract Price: 18592.50 If the change involves an increase, the estimated amount is not to be exceeded without finther authorization. RECOMMEND by ENGINEER: LM (Authorized Signature) Method of determining change in Contract Times: Contractor's records Engineer's records Other Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED by OWNER: By: i-&,P6-TU0 =Q (Authorized Signature)