Loading...
HomeMy WebLinkAboutTask Order No. 10210 with Civil Survey Consultants for Water Line Replacement Frontier TireE IDIAN,;*� PURCHASING AGENT 33 E. Broadway Ave, Meridian, ID 83642 Phone: (208) 888-4433 x 417 Fax: (208) 887-4813 TASK ORDER NO. 10210 Between CITY OF MERIDIAN AND CIVIL SURVEY CONSULTANTS, INC. This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated April 13, 2010. WATER LINE REPLACEMENT (DESIGN) - FRONTIER TIRE WATER SERVICE SCOPE OF SERVICES Per the City's request, the Engineer will provide professional engineering services related to the design of replacing the existing 2" water service to Frontier Tire located at 614 N. Main Street. The design will include a new 2" meter and water service line from the main to the meter. The existing service line on the property side of the meter will be reconnected to the new meter. Task 1 —Administration 1.1 This task includes duties associated with setting up the contract and submitting monthly invoices. Task 2 — Design Surveying 2.1 This task includes field work associated with performing topographic survey required to complete the design. The City shall contact dig -line and have the existing utilities marked. 2.2 This task includes office work associated with drafting the topographic survey and establishing the public right-of-way and property lines. We anticipate that for the purposes of this project we will be able to define the existing public right-of—way and property lines from previous projects done in the area for the City and from record of surveys and subdivision plats recorded with Ada County. Task 3 — Design Water Service 3.1 This task includes work associated designing the new water service. 3.2 The existing water services is located on property owned by Union Pacific Railroad. Engineer will prepare and submit a pipeline installation agreement to the railroad. City shall pay all fees associated with the agreement. Task 4 -- Construction Document Preparation and Review 4.1 Develop plans and specifications and bid schedule that meet current design standards and standard specifications of the City and ISPWC. The City shall provide the Engineer with a high resolution orthographic photo of area to be possibly included on the plans. 4.2 Submit 2 full size physical copies of plans and special provisions to City Engineering for Development Services review and approval, Engineer to revise plans as necessary and resubmit. 4.3 Submit 4 full size physical copies of plans and special provisions to City Engineering for QLPE review and approval, Engineer to revise plans as necessary and resubmit. 4.4 Prepare an Erosion and Sediment Control Plan (ESCP) and submit the plan to the City and ACHD for review and approval. The ESCP will be prepared in accordance with the City of Meridian Construction Stormwater Management Program. All other stormwater management program requirements shall be completed by the City or the Contractor. 4.5 Prepare final construction documents with inclusion of any addenda from the bidding phase and provide one physical copy for City's use and 10 physical copies for contractor's use. Task 5 — Construction Services 5.1 Provide one set of construction stakes for the new water service. It is anticipated that two points may need to be staked to provide horizontal line. Staking will be completed as requested by the City and Contractor. 5.2 Attend pre -construction meeting. 5.3 Answer RFI's from contractor during bidding and construction about the design. 5.4 Review material specifications submitted by contractor. 5.5 Prepare record drawings meeting the City of Meridian Acceptance of Record/Electronic Drawings, dated August 26, 2009. TIME OF PERFORMANCE Engineer will work with project manage to complete design in a timely manner. COMPENSATION The Not -To -Exceed amount for this Task Order No. 10210 is Five Thousand Five Hundred Fifty - Five dollars ($5,555). The hourly rate for services and direct expenses is attached and by reference made part hereof. CITY OF MERIDIAN Approvedto Co en BY: KE._ ATTS, 'U G AGENT Dated: /d � 6 Depart" t App oval BY: DAVID ALLISON, S//6 AFF ENGINEER Dated: 10h 5 CIVIL SU CONSULTANTS, INC. BY: TIMOTHY B R ESS, VICE PRESIDENT Dated: — — Civil Survey Consultants Man -Hour And Fee Estimate City of Meridian- Task Order No. 10210 Frontier Tire Water Service Replacement Task Description Project Manager Chief Project Design of Surveys Engineer 2 Engineer 1 Survey Crew Total Task Hours Cost Project Manager 1.00 @ $105.00 $105.00 Task 1 - Administration 0.00 @ $105.00 $0.00 1.1 Contract and Invoices 0.00 1 $100.00 $95.00 Project Engineer 2 25.00 @ $95.00 $2,375.00 Task 2 - Design Surveying OAO @ $85.00 $0.00 2.1 Topo Survey - Field 0.00 @ 8 $1,080.00 2.2 To o Survey & Control - Office 12.00 8 $135.00 $760.00 Task 3 - Design Water Service 38.00 $4,100.00 3.1 Design Water Service 1 $95.00 3.2 UPPR License Agreement 2 $190.00 Task 4 - Construction Documents 4.1 Plans, Specifications, Bid Schedule 1 4 $485.00 4.2 Development Services Review 1 $95.00 4.3 QLPE Review 1 $95.00 4.4 Erosion and Sediment Control Plan 2 $190.00 4.5 Final Documents 1 $95.00 Task 5 - Construction Services 5.1 Construction Staking 2 $270.00 5.2 Pre -Construction Meeting 1 $95.00 5.3 Answer RFI's from Contractors 1 $95.00 5.4 Review Material Submittals 1 $95.00 5.5 Record Drawings 1 2 $365.00 Total Man -Hours 1 1 1 0 1 25 1 0 12 0 $4,100.00 Classification Hours Misc. Printing Rate Total Project Manager 1.00 @ $105.00 $105.00 Chief of Surveys 0.00 @ $105.00 $0.00 Project Engineer 1 0.00 @ $100.00 $0.00 Project Engineer 2 25.00 @ $95.00 $2,375.00 Design Engineer 1 OAO @ $85.00 $0.00 Design Engineer 2 0.00 @ $80.00 $0.00 Survey Crew 12.00 @ $135.00 $1,620.00 Labor Subtotal 38.00 $4,100.00 Classification Hrs/Miles Rate Total Misc. Printing $50.00 Potholing - Circle H Construction 2.00 @ $175.00 $350.00 UPRR Agreement Application Fee $1,055.00 Direct Subtotal $1,455.00 Total Estimated Fees taskorder10210.xls $5,555.00