Loading...
HomeMy WebLinkAboutTask Order No. 10209 with Civil Survey Consultants for Water Line Replacement NW 1st Street�E IDIAN),;�-IS PURCHASING AGENT 33 E. Broadway Ave, Meridian, ID 83642 Phone: (208) 888-4433 x 417 Fax: (208) 887-4813 TASK ORDER NO. 10209 Between CITY OF MERIDIAN AND CIVIL SURVEY CONSULTANTS, INC. This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated April 13, 2010. WATER LINE REPLACEMENT (DESIGN) — NW 1sT STREET SCOPE OF SERVICES Per the City's request, the Engineer will provide professional engineering services related to the design of replacing approximately 620' of water main in NW 1St Street. The first section is approximately 350' long and is between Broadway Avenue and the railroad tracks. The other section is approximately 270' long from Pine Street to Meridian Elementary School. Task 1 —Administration 1.1 This task includes duties associated with setting up the contract and submitting monthly invoices. Task 2 — Design Surveying 2.1 This task includes field work associated with performing topographic survey required to complete the design topographic survey will cover existing utilities, irrigation, pavement, curb, gutter, sidewalk, water meters, and any other items within the public right-of-way required to complete the design. The City shall contact dig -line and have the existing utilities marked. 2.2 This task includes office work associated with drafting the topographic survey and establishing the public right-of-way and property lines. We anticipate that for the purposes of this project we will be able to define the existing public right-of—way and property lines from previous projects done in the area for the City and from record of surveys and subdivision plats recorded with Ada County. Task 3 — Design Water Service 3.1 This task includes work associated with coordinating potholing by contractor and the review of the results. The existing water main will be potholed to determine size and depth. 3.2 Determining replacement method and designing water improvements. It is anticipated that the plans will be developed to allow pipe bursting and open trench methods for replacing the existing water mains. The existing fire hydrants, water meters and service lines will be replaced at locations identified by the City. 3.3 Engineer with contact Meridian School District and obtain permission from them to replace water main located on Meridian Elementary School property. City shall pay all fees associated with the agreement. 3.4 We anticipate that there is not an existing water main easement with the school district and a new easement will be required. We will prepare the easement description and exhibit and assist the City in the execution of the easement. A title report will be ordered to establish the existence of an existing easement. 3.5 Send letters to property owners fronting project notifying them of the project and its anticipated construction schedule. The letter will be submitted to City staff for approval prior to the mailing of the letter. City will provide property owner mailing addresses as needed. This task also includes time responding to telephone calls from property owners. Task 4 — Construction Document Preparation and Review 4.1 Develop plans and specifications and bid schedule that meet current design standards and standard specifications of the City and ISPWC. The City shall provide the Engineer with a high resolution orthographic photo of area to be possibly included on the plans. 4.2 Submit one set of plans to ACHD for review and approval prior to construction. Includes one set of revisions per ACHD comments and then resubmitting to ACHD for approval. 4.3 Submit one set of plans to power, gas, telephone, and cable companies for review prior to construction. 4.4 Submit 2 full size physical copies of plans and special provisions to City Engineering for Development Services review and approval, Engineer to revise plans as necessary and resubmit. 4.5 Submit 4 full size physical copies of plans and special provisions to City Engineering for QLPE review and approval, Engineer to revise plans as necessary and resubmit. 4.6 Prepare an Erosion and Sediment Control Plan (ESCP) and submit the plan to the City and ACHD for review and approval. The ESCP will be prepared in accordance with the City of Meridian Construction Stormwater Management Program. All other stormwater management program requirements shall be completed by the City or the Contractor. 4.7 Prepare final construction documents with inclusion of any addenda from the bidding phase and provide one physical copy for City's use and 10 physical copies for contractor's use. Task 5 — Construction Services 5.1 Provide one set of construction stakes for each end of the new water mains. It is anticipated that the staking will be completed in one visit to each site. Staking will be completed as requested by the City and Contractor. 5.2 Attend pre -construction meeting. 5.3 Answer RFI's from contractor during bidding and construction about the design. 5.4 Review material specifications submitted by contractor. 5.5 Prepare record drawings meeting the City of Meridian Acceptance of Record/Electronic Drawings, dated August 26, 2009. TIME OF PERFORMANCE Engineer will work with project manage to complete design in a timely manner. COMPENSATION The Not -To -Exceed amount for this Task Order No. 10209 is Fourteen Thousand Nine Hundred Thirty dollars ($14,930). The hourly rate for services and direct expenses is attached and by reference made part hereof. CITY OF MERIDIAN Approved a to tent' BY: _ KEI / , PURL A G AGENT Dated: f r -- Depa nt A roval BY: Dwb ALLISON, STAFF ENGINEER Dated: 10125L10 CIVIL S NSULTANTS, INC. BY TIMO Y RGES , VICE PRESIDENT Dated:_ ) — Civil Survey Consultants Man -Hour And Fee Estimate City of Meridian -Task Order No. 10209 Water Line Replacement - NW 1st Street Task Description Project Manager Chief Project Design of Surveys Engineer 2 Engineer 1 Survey Crew Total Hours Task Cost $105.00 $210.00 Chief of Surveys 4.00 @ $105.00 $420.00 Task 1 - Administration 94.00 @ $95.00 $8,930.00 Design Engineer 1 0.00 @ 1.1 Contract and Invoices $0.00 3 32.00 Q 3 $285.00 Labor Subtotal 1 132.001 Task 2 - Design Surveying $13,880.00 2.1 Topo Survey -Field 2 24 26 $3,430.00 2.2 Topo Survey & Control - Office 20 20 $1,900.00 Task 3 - Design S & W Improvements 3.1 Potholing Coordination & Review 2 2 $190.00 3.2 Develop Design 12 1 12 $1,140.00 3.3 Coordination with School District 3 3 $285.00 3.4 School District Easement 4 3 7 $705.00 3.5 Property Owner Letters 2 2 $190.00 Task 4 - Construction Documents 4.1 Plans, Specifications, Sid Schedule 2 20 22 $2,110.00 4.2 Plans to ACHD for Review 1 1 $95.00 4.3 Plans to Other Utilities for Review 1 1 $95.00 4.4 Development Services Review 2 2 $190.00 4.5 QLPE Review 2 2 $190.00 4.6 Erosion and Sediment Control Plan 8 8 $760.00 4.7 Final Documents 6 6 $570.00 Task 5 - Construction Services 5.1 Construction Staking 4 4 $540.00 5.2 Pre -Construction Meeting_ 1 1 $95.00 5.3 Answer RFI's from Contractors 1 1 $95.00 5.4 Review Material Submittals 1 1 $95.00 5.5 Record Drawings 4 4 8 $920.00 Total Man -Hours 1 2 1 4 94 0 32 1 132 1$13,880.001 Classification Hours Rate Total Project Manager 2.00 @ $105.00 $210.00 Chief of Surveys 4.00 @ $105.00 $420.00 Project Engineer 2 94.00 @ $95.00 $8,930.00 Design Engineer 1 0.00 @ $85.00 $0.00 Survey Crew 32.00 Q $135.00 $4,320.00 Labor Subtotal 1 132.001 1 1 $13,880.00 Classification Each @ Rate Total Misc. Printing $300.00 Potholing - Circle H Construction 2.00 $250.00 $500.00 Title Report 1.00 $250.00 $250.00 Direct Subtotal $1,050.00 Subtotal Total Estimated Fees taskorder10209.xls $14,930.00 $14,930.00