CITY OF MERIDIAN
CONTRACT AMENnmFNT
CONTRACTOR NAME:
DEPARTMENT NAME:
Hillside Landscape Construction, Inc
Parks
ADDRESS:
ADDRESS:
3900 N. Can Ada Rd.
33 E. Broadway Ave
Nampa, ID 83687
Meridian, ID 83642
CURRENT CONTRACT INFORMATION:
Amendment Date: 9/02/10 Previous Amendments: 3 Previous Change Orders: 5
Current Contract Dates:
Area 1, 2, 4, 5 START: 7/28/2009 COMPLETION: 4/16/2010
Area 3 START: 4/21/20010 COMPLETION: 914!2010
Current Contract Amount (Inclusive of Previous AmendmentslChange Orders to Date): $1,115,878.60
X STANDARD AMENDMENT
AMENDMENT TO EXERCISE OPTION TO RENEW
(Check a!I that AaDW
Check aU that a
X Amendment to Contract Performance (Scope)
Amendment to Contract Performance
X Amendment to Contract Dates
Amendment to Contract Dates
Amendment to Contract Amount
Amendment to Contract Amount
Other. (Explain) Close-out Clarification
Other: (Explain)
DESCRIPTION OF REASON FOR AMENDMENT: (Attach all relevant documentation detailing amendment?:
The water feature basin had to be widened to accommodate the basin drain. The widening lessened the planting area
on which the Pond Pump Vault and Pump Station Enclosure was originally designed to be built upon. This relocation
will accommodate the space needed for the Pond Pump Vault and Pump Station Enclosure.
(Work Change Directive No. 4 Attached)
NEW CONTRACT INFORMATION:
Amendment Date: 1015110
New Contract Dates for Area 3:
START: 4121/2010
FINAL COMPLETION: 9124110
Contractor shall be liable to the City for any delay beyond these time periods in the amount of Three Hundred Dollars ($300.00) per day. Such
payment shalt be construed to be liquidated damages by the Contractor in lieu of any claim or damage because of such delay and not be
construed as a penally_
Amount of Amendment Change $ 28.025.00
Current Contract Amount Lnclusive of Previous Amendments to Dafe : 11,143,903.60.
ALL OTHER TERMS AND CONDITIONS OF THE ORIGNAL CONTRACT AND PREVIOUS
AMENDMENTS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT.
CIT;4HAt
IDIAN HILLSIDE LANDSCAPE CO STRUCTION, INC
BY:BY: PURCHASING MANAGER CLIFF-YOWLIM
Dated: 11—S-16 1t Dated: le I OS • 2,
City Projec Manage
BY:
Max ens , ai Projects Manager
CITY oFiYfffMfAN
Hm0 Parke Ph= 3 0=*w (=
ADACOUN[Y. WARD
WORK CHANGE DIRECTIVE
No. 4
DATE OF ISSUANCE 9-02-10 EFFECTIVE DATIB9-02-10
ParkPhase 3
ark Phase 3
No. PK0 ENCzINEBR deet No. _ _NA
You are directed to proceed promptly with the following chmW(s):
Description:
Relocate the Pond Fump Vault and Pump Station Enclosure and add additional landscaping.
1. Relocate the Pond Pump Vault and Pump Station Enclosure and add additional landscaping.
To be designed and stamped by a registered P.E. All designs must meet DEQ, ACRD, City
ofMeridion requirements and standards, and ISPWC standards:
Purpose of Work Change Directive:
The water feature basin had to be widened to accommodate the basin drain. The widening
lessened the planting area on which the Pond Pump Vault and Pump Station Enclosure was
originally designed to be built upon. This relocation will accoxrn►alte the space needed for the
Pond Pump Vault and Pump Station Enclosure.
Attachments: (List documents supporting change)
1 Landmark Engineering Sheet 3 of stamped 9 2-10
2 Landmark Engineering Sheet 4 of 4 stamped 9-2-10
3 Landscape plan sketch
4) Email dated 9/2/2010 3:15 PM
If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a
Change Order based thereon will involve ane or more of the following methods as defined in the
Contract Documents.
Method of determining change in
Contract Price:
■ Unit Prices
0 Lump Sinn
❑Cost of the Work
Not To Exceed increase (decrease) in Contract Not To Exceed increase (decrease) in Contract
Price: $ 28, 025.00 Times if executed by September 3, 2010:
Final Completion: 20 days;
Ready for final payment; 20 days-
.......
ays....... _ Contractor shall be liable to the-City£or uuy.'..
delay beyond these time periods in thV emount
of Three Hundred Dollars ($300.00) per day.
Such payment shall be construed to be
liquidated damages bythe Contractor in lieu of
cnycwmmtwm
Ho=?Wk Ph=7 Gym
AAACOUMY, WAND
F-1-12VICf)O
any claims or damagos bet;auw of swlt delay
and not be constfued as a penalty.
pl
n Hfside La
ndcape Cons ctior
-Scltyl,77
CoNMACrM
By
LJCDC N 19l (19 EdWthm) It 01 10
Pic"
Jby�Cftin—JoWeCwftdDowamift0 muiWxWcnd OW by noAwucWWrimmiflon6�0oaofll�aamm" Cm &w*m�8peR6mu=
Page 1 of 7
Max Jensen
From: Cliff Yochum [Ciiff@hlllsideco.com]
Sent: Thursday, September 02, 2010 3:15 PM
To: Max Jensen
Subject: IE: Heroes Park
Hillside proposes to do the work for a harts number of $ 28,025.00. It will be neither less nor more than
$ 28,02S.00.
Thanks, Cliff
From: Max Jansen [mallbo:mjensen@meridiancity org]
Sent. Thursday, Sepbember 02, 2010 3:11 PM
To: Cliff Yochum
Subject: RE: Heroes park
Thanks Cliff, I noted that you in your email you state that you "estimate this cost at
$28,025.00" but I need a Not to Exceed amount. I realize this might have been a typo, can you
please revise your email and reseed to me? To clarify, the Not To Exceed amount is for the
work associated with the attachments.
I will attach your response email to the Work Change Directive and email to you for your
signature.
Thank you
Max S. Jensen
Capital Projects Manager
City of Meridian
33, E. Broadway Ave, Ste 200
Meridian, 10 83642
Phone: (208) 898-5500
Fax: (208) 898-9551
Email: mlegsen@rnerld anci_ vont
From: Cliff Yochum [maiito:CIW@htilsideco.com]
Seni0 Thursday, September 02, 20141.131 PM
To., Max Jensen
Subject: RE: Heroes Park
For your approval. I estimate that this will cost $ 26,026.00. lam available this afternoon or untir 10 am
tomorrow to sign the change order. Bob is ready to proceed on this as soon as the CO Is signed.
Thanks, Cliff Yochum :...,. _, ..., . :, • .
From: Max Jensen fmaitto:mjemen@metfdiancity.org]
9/2/2010
C
i
I
3
onand NVIQtHaW $
03 voq aummAw
• 0
bpao xaelo-Mm+
a
Ree Gp a iwr fie+
suOMnrrAL REWEw
i]FEMANDY+�OA'i
1�i\lttGORa*Q
FIM3E�OCETAM
Yid8O1969i MF3WAra1NRIIBCTIIOliraA
q RiBJBCf 1@rE
AW A6W OM M09E
�11iGF1tEtIN16NORBdgtOp111NC10N 4NE6rdF
MEFGROIMMV lftKOFX=IipGOR��1gW1�E
As � forA M PROCEMPi SIO 1R5110ifEf OF CORRliIL M
t COOl�Ml1p{OFi6rldtliMFlRpi0FA1L(A1�11RIGPt�N01Fi910t•
• 19FAC[p1YMAA0gWMCEOFMRYgRIL
� (�Wp.Cfi mp�+.�g4�'0.
G3Y OF NERW M PLgm WORK
O O RDA AYAYE.6EERIMAF OlRilp
C eip _2.-1JE'�AAga2C�
Cl4t�
• 0
bpao xaelo-Mm+
a