HomeMy WebLinkAboutJUB Engineers, Inc. for Ten Mile Franklin to Cherry DesignCITY OF MERIDIAN 33 EAST BROADWAY AVENUE MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.' 2 Project Number: 0610C Date: 7/15/2010 Effective Date. 7/15/2010 CONTRACTOR: JUB Engineers` Inc. PROJECT: Ten Mile Rd., Franklin - Cherry Design The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Desciption: Additional construction administration services per the attached letter dated June 2, 2010. Reason for Change Order: Increased design and surveying requirements. Attachments: 1 PO Requisition Form 2 Proposal from JUB dated June 2, 2010 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $46,994.00 Original Contract Completion Date: Original Contract Completion Days: Net changes form previous C.O.'s.: Net Days change form previous C.O.'s: No. Q to Q No. 0 to Q $6,451.00 Contract Price Prior to this C.O.: Contract Completion Date before this C.O.: $53,445.00 Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $7,600.00 Contract Price with all Approved C.O.'s: Contract Completion Dale with all Approved C.O 's: 7/31/2010 $61,045.00 RECOMMENDED: (PROJECT MANAGER) ACCEPT (CONTRA GTO ) By. T � C By: Date. // S li Zalt� Date: APPROVED: (CITY PURL ASIN NT COUNCIL APPROVAL r41A By: Keith Watts NIA Date: —7- Z I — 1 v Date: APPROVED: (CITY) HIP y ATTEST: N111 (Holman By: Mayor Tammy de Weerd By: City Clerk, Jaycee Date: Date: (0 -JUS June 2, 2010 Mr. John Boyd City of Meridian 33 Bast Broadway Avenue Meridian, ID 83642 Dear Mr. Boyd: J -U -B ENGINEERS, Inc. ENGINEERS •SURVEYORS•PLANNERS Regional Office 250 South Beechwood Avenue, Suite 201 Boise, ID 83709 208-376-7330 Fax: 208-323-9336 www.jub.com RE: Task Order 061OC: Ten Mile Road (Franklin to Cherry Lane) Reuse and Sewer Main Design — Construction Addendum We have attached for your review a proposed authorization for additional services which adjusts the contract amount on the above referenced project. Our justification to increase the budget over our original estimate is outlined below: 1) Staking Services • As you know, estimating the level of effort for construction support services is difficult, primarily due to the inherit nature of construction, contractor's capabilities, and difficulties encountered during the project. To date we have been called out to stake 20 times over the course of the project, and there remains more staking to be completed on the Ten Mile reuse line. This level of staking was not anticipated in our estimate. • Some re -staking was required due to communication/staging issues between roadway and pipeline contractors, and flooding issues on Ten Mile Creek. • We were requested by the contractor to calculate proposed finished street grades. This requires more effort than what we normally anticipate when completing staking project in existing streets. Consequently, our field survey and technician time is over our original budget estimate. • Scope of the project increased some with the addition of stub -outs and services. • Staking at 100' intervals has been requested by the contractor. 2) Construction Administration and Additional Design • There were additional service connections and stub -outs design during construction that required revisions to the construction plans. Specifically, plan sheets 103A, 104A, 107A, and 501A were revised. This design work was billed to construction services. TASK C - CONSTRUCTION ASSISTANCE SERVICES Construction $4,7661 $7,237-1 $1,9911 $13,994 Previous Adjustments -Transfer from Remaining Design Coordination Coordination & Construction Record $5,966 $7,237 Administration Staking Drawings TOTAL Original Contract Estimate $4,7661 $7,237-1 $1,9911 $13,994 Previous Adjustments -Transfer from Remaining Design Coordination $1,200 CURRENT CONTRACT AMOUNT $5,966 $7,237 $1 991 $15,194 Current Job to Date Costs - JUB $9,6741 $12,308 $223 X22 2p5 J -U -B ENGINEERS, Inc. ENGINEERS • SURVEYORS • PLANNERS 250 South Beechwood Avenue, Suite 201 Boise, ID 83709 208-376-7330 Fax: 208-323-9336 www.jub.com The above table summarizes the original budget and our current charges to date on the project. Approximately, $1200 was moved over from the agency permitting contract amount to help add in the extra design work, but we have incurred approximately $5,000 in costs over the original construction services estimate. We are requesting consideration of increasing the budget an additional $7,600 to finish completion of the record drawing and remaining staking on the reuse pipeline. Please review this proposal and feel free to contact me if you have any questions or concerns. If this is acceptable, we will prepare an addendum for signature. Thank you for your consideration of this request. Sincerely, ]-U-B ENGINEERS, Inc. A�q .k"'J Phillip H. Krlchbaum, P.E. 1'•Boise6les1public\Projects\JUB-.10-08-100 -Meridian -Ten Mile Road Reuse & Sewer Main Design.10-08-100-Admin\Contracts and BillmgsWd no2\April28.docx E IDIAN*- Public IDAHO Works Department Mayor Tammy de Weerd City Council Members: Keith Bird Brad Hoaglun Charles Rountree David Zaremba TO: Warren Stewart Engineering Manager FROM: John Boyd Engineering Technician II DATE: 6/10/2010 SUBJECT: AUTHORIZATION FOR ADDITIONAL DESIGN AND CONSTRUCTION SERVICES FOR THE TEN MILE RD — FRANKLIN TO CHERRY REUSE PIPELINE AND FRANKLIN ROAD SEWER MAIN AND REUSE PIPELINE INSTALLATION PROJECT IN CONJUNCTION WITH THE ACHD ROAD PROJECT WITH JUB ENGINEERS FOR A NOT TO EXCEED AMOUNT OF $7,600.00 IN ACCORDANCE WITH THE MASTER AGREEMENT DATED JANUARY 1, 2006. L RECOMMENDED ACTION A. Approve the Task Order 0610C for Additional Services No. 2 with JUB Engineers for the Ten Mile Road -- Franklin Rd to Cherry Lane Improvement Project in Conjunction with ACHD Project Number 504003 for a not to exceed amount of $7,600.00. B. Authorize the Purchasing Department to issue a purchase order in the amount of $7,600.00. II. DEPARTMENT CONTACT PERSONS John Boyd, Engineering Technician II (Project Manager) 489-0364 Warren Stewart, PW Engineering Manager 489-0350 Page I of 3 TEN MILE RD — FRANKLIN TO CHERRY REUSE PIPELINE AND FRANKLIN ROAD SEWER MAIN AND REUSE PIPELINE INSTALLATION PROJECT IIY. DESCRIPTION A. Background Construction staking has taken more time than was included in the original scope of work due to the scattered and disconnected locations of our utilities within this project. The nature of the work requiring those was unknown when the original scope was developed. The City also requested JUB to add several utility extensions to the project, which required additional design and construction surveying. Extra work is also required to increase the amount for record surveying and drafting required by these additional features. B. Proposed Project Attached is an Authorization for Additional Services No. 2 Task Order with JUB Engineers for the additional design of City requested utility additions, construction staking, record surveying, record drawing production of those additions and additional staking required due to the complexity of this project. Please see attached documentation from JUB regarding these additional requested costs. This addendum is for $7,600.00. IV. IMPACT A. Strategic Impact: This project meets our mission requirements to indentify and prioritize work to anticipate, plan and provide public services and facilities that support the needs of our growing community, ensuring modern reliable facilities while maintaining financial stewardship. This project will complete approximately half of the pipeline required to serve the Ten Mile Interchange area with Class "A" reclaimed water. B. Service/Delivery Impact: This Task Order will compensate JUB for the extra work required to complete this project and allows for an increase in the amount for the record surveying and drafting required by those additional features indicated in Item III above. C. Fiscal Impact / Project Costs The funding requested for this project is a not to exceed amount of $7,600.00 and will bring the total project Design and Construction Assistance costs to $61,045.00. Page 2 of 3 TEN MILE RD — FRANKLIN TO CHERRY REUSE PIPELINE AND FRANKLIN ROAD SEWER MAIN AND REUSE PIPELINE INSTALLATION PROJECT D. Project Funding Costs Re -Use Code ................................ E. Budget .3590-96151 ...............................$7,600.00 Funds are budgeted and available for the costs above. V. LIST OF ATTACHMENTS 1. JUB Engineers request for additional funding. 2. Purchase Order Requisition 3. Budgetary Information Department Approval: e a Page 3 of 3