HomeMy WebLinkAboutTask Order No. 10450 with Johnson Architects for City Hall 3rd Floor Tenant ImprovementsTASK ORDER NO. 10450 Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND JOHNSON ARCHTIECTS (CONSULTANT) This Task Order is made this Q' day of August, 2013 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by (JOHNSON ARCHTIECTS), hereinafter referred to as "CONSULTANT" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated June 16, 2011. The Project Name for this Task Order 10450 is as follows: CITY OF MERIDIAN CITY HALL 3RD FLOOR TENTANT IMPROVEMENTS PROJECT SCOPE The project shall consist of an interior alteration (approx. 2,100 s.f.) to an unfinished area of the third floor of the existing Meridian City Hall. This proposal is based upon the approved floor layout furnished by the City with the understanding that minor adjustments may still be warranted. This proposal assumes no site or exterior improvements shall be required and that no alteration occurs beyond expansion area as identified on pian. SCOPE OF SERVICES This project shall be approached with the understanding that the City will act as the Project/Construction Manager. CONSULTANT shall provide customary architectural drawings and specifications suitable for permitting and general construction. In addition, CONSULTANT will provide general HVAC, plumbing and electrical engineering services, including the preparation of a Lighting Analysis (ComCheck), as will be required for permit processing. Additional engineering required by the City or any other jurisdiction to obtain the building permit, shall be furnished by the City or by CONSULTANT as an additional service. Scope assumes CADD files of existing conditions shall be developed by CONSULTANT based on as -built information (PDF format) as furnished by Owner. CONSULTANT'S services shall include General Coordination Services, Schematic Design (modifications as needed), Design Development and Construction Documentation. CONSULTANT shall be responsible for the preparation, coordination, and application of submittal documents, as required, to obtain the necessary approvals from the various regulatory agencies. Specifications will be noted on drawings; preparation of a project manual is excluded from the scope. Services during the Bidding phase shall include general clarifications to the contract documents and participation of the Team at the Pre -Bid Conference. Services during the Construction phase shall include monitoring of construction activities through the review and processing of RFIs (clarification requests) and submittals, site visits (Arch - 3, MEP - 2 each) including a punchlist walkthrough, and review of O&M manuals and Record Task Order 10450 CITY HALL 3RD FLOOR TENTANT IMPROVEMENTS Page 1 of 4 JOHNSON ARCHTIECTS Drawing preparation at Project Closeout. Services during bidding and construction beyond those described here shall be performed on a Time and Materials basis. ASSUMPTIONS Scope of Services not included: Structural Engineering (if required) Fire Sprinkler Design (shall be Design -Build through City) Interior Signage / Development (except as required by ADA) Payment of all Application/Permit Fees required shall be the responsibility of the City. TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by AUGUST 2013 and resulting in Final Design being completed by September 2013. A NTP issued on a different date will change the schedule accordingly. COMPENSATION AND COMPLETION SCHEDULE - Task Description Due Date Compensation 1 Architectural ■ September 2013 ■ $5,450 2 Mechanical, Plumbing & Electrical ■ September 2013 • $6,500 TASK ORDER TOTAL $11,950 The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10450 is eleven thousand nine hundred fifty dollars ($11,950.00). No compensation will be paid over the Not -to - Exceed amount without prior written approval by the City in the form of a Change Order. The hourly rates for services and direct expenses are per the Master Agreement (by this reference made a part hereof) and current attached Rate Schedule and will be the basis for any additions and/or deletions in services rendered. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITY OF MERIDIAN BY: Z/' KE TS, Purchasing Manager Dated: �b JOHNSON ARCHTIECTS !�� MR jrrim," Dated: 5 - ?4• /5 Department Approval N MCCORMICK, Deputy PW Director Dated: 6 Y 1. Task Order 10450 CITY HALL 3RD FLOOR TENTANT IMPROVEMENTS Page 2 of 4 JOHNSON ARCHTIECTS EXHIBIT A 2013 RATE SCHEDULE for ALL CATEGORIES UNDER $25,000 JOHNSON ARCHTECTS Name / Title Hourly Rate Principal Architect $125 Pro'ect Manager $105 Intern Architect/Job Captain $85 Drafter $70 Clerical 65 ALLOWABLE REIMBURSABLES The following reimbursable expenses will be allowed ONLY if addressed in any resulting task order. Amounts will be reimbursed at cost. Expense Rate Sub -Consultants Cost Outside Printing and Reproduction with Receipt Cost Travel See Below TRAVEL EXPENSES The City will only pay for meal, lodging and transportation expenses for official business that consists of consultants traveling to or from, outside of the Treasure Valley, and that are directly related to the specific task orders. Reimbursement will NOT exceed the limits allowed under the US General Services Administration Per Diem Rates for the Boise area. These rates can be found at the following website: httpl/www.gsa.gov/portal/category/100120 The current FY2013 rate for meals is $46 per full day, and $34.50 (75%) for both travel days. Receipts for meal per diem allowances are not required. Task Order 10450 CITY HALL 3RD FLOOR TENTANT IMPROVEMENTS Page 3 of 4 JOHNSON ARCHTIECTS The current FY2013 GSA hotel rate is $77.00/night. Lodging, transportation and hotel expenses will only be reimbursed when accompanied with an itemized receipt and proof of prior approval by the Project Manager. Transportation (Pre -approved by Project Manager): All travel must be by the most economical means practical. If there is interruption of travel or deviation from the direct route for the traveler's convenience, the deviation may not exceed the cost of uninterrupted travel. Airline: Consultants will only be reimbursed for coach or economy class rates. Rental Cars: A vehicle is only allowed with prior authorization by the City Project Manager. ALL OTHER EXPENSES ARE CONSIDERED INCIDENTAL AND ARE NOT REIMBURSABLE Task Order 10450 CITY HALL 3RD FLOOR TENTANT IMPROVEMENTS Page 4 of 4 JOHNSON ARCHTIECTS