HomeMy WebLinkAboutAgency CommentsDate: August 26, 2014
To: Boise Slam Basketball Club
683 W. Bird Way
Meridian, ID 83646
Subject: MER14-0044 / MCUP14-014
3660 E. Lanark St.
Boise Slam Basketball Club
John S. Franden, President
Mitchell A. Jaurena, Vice President
Rebecca W. Arnold, Commissioner
Sara M. Baker, Commissioner
Jim D. Hansen, Commissioner
In response to your request for comment, the Ada County Highway District (ACHD) staff has
reviewed the submitted application and site plan for the item referenced above. The applicant
shall be required to meet the following conditions of approval:
• Comply with all ACHD Standard Conditions of Approval (attached) as well as all ACHD
Policies.
• Prior to the construction, repair, or installation of any roadway improvements (curb, gutter,
sidewalk, pavement widening, driveways, culverts, etc.), a permit must be obtained from
ACHD.
If you have any questions, please feel free to contact me at (208) 387-6335.
Sincerely,
U�w
Austin Miller
Planner I
Development Services
CC: Project file,
City of Meridian, via e-mail
Volante Investments (Ron VanAuker), via e-mail
Thornton Oliver Keller ( Karena Gilbert), via e-mail
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Ce
DI TRICT CENTRAL DISTRICT HEALTH DEPARTMENT Return to:
HEALTH Environmental Health Division 0 �— L3ACz
DEPARTMENT
( ' ❑ Boise
❑ Eagle
Rezone # S I cu�y��k�-tea 11 ❑ Garden City
Conditional Use # ('Lke JLC— `Ol ❑ Kuna
Preliminary / Final / Short Plat Aeridian
❑ Star
❑ 1. We have No Objections to this Proposal.
❑ 2. We recommend Denial of this Proposal.
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ bedrock from original grade ❑ other
❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
❑ 8. After written approval from appropriate entities are submitted, we can approve this proposal for:
❑ central sewage ❑ community sewage system ❑ community water well
❑ interim sewage ❑ central water
❑ individual sewage ❑ individual water
❑ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
❑ central sewage ❑ community sewage system ❑ community water
❑ sewage dry lines ❑ central water
❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
❑ 12. We will require plans be submitted for a plan review for any:
❑ food establishment ❑ swimming pools or spas ❑ child care center
❑ beverage establishment ❑ grocery store
❑ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDFID.
4. 1-% t.�.� �sS �P t?c� —tt. Reviewe
J By: h2rS
D.
L A
Review Sheet
15726-001 EH1 111
Traffic Information
Condition of Area Roadways:
Traffic Count is based on Vehicles per hour (VPH)
* Acceptable level of service for a two-lane collector is "D" (425 VPH).
Average Daily Traffic Count (VDT):
Average daily traffic counts are based on ACHD's most current traffic counts
The average daily traffic count for Lanark Drive east of Eagle Road was 1,770 on
March 14, 2012.
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Functional
PM Peak Hour
PM Peak Hour
Roadway
Frontage
Classification
Traffic Count
Level of Service
Lanark Dr. /
615 -feet
Collector
73
Better than "D"
Gaudians Ave.
* Acceptable level of service for a two-lane collector is "D" (425 VPH).
Average Daily Traffic Count (VDT):
Average daily traffic counts are based on ACHD's most current traffic counts
The average daily traffic count for Lanark Drive east of Eagle Road was 1,770 on
March 14, 2012.
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Standard Conditions of Approval
All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including
all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-
of-way (including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within
the ACHD right-of-way.
3. In accordance with District policy, 7203.6, the applicant may be required to update any
existing non-compliant pedestrian improvements abutting the site to meet current Americans
with Disabilities Act (ADA) requirements. The applicant's engineer should provide
documentation of ADA compliance to District Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at
387-6280 (with file number) for details.
5. A license agreement and compliance with the District's Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall
be borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way.
The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant.
The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business
days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD
Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are
compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in
writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file
numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC
Standards and approved supplements, Construction Services procedures and all applicable
ACHD Standards unless specifically waived herein. An engineer registered in the State of
Idaho shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant's authorized representative and an
authorized representative of ACHD. The burden shall be upon the applicant to obtain
written confirmation of any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the
site plan and may require additional improvements to the transportation system at that time.
Any change in the planned use of the property which is the subject of this application, shall
require the applicant to comply with ACHD Policy and Standard Conditions of Approval in
place at that time unless a waiver/variance of the requirements or other legal relief is
granted by the ACHD Commission.
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Request for Appeal of Staff Decision
Appeal of Staff Decision: The Commission shall hear and decide appeals by an
applicant of the final decision made by the Development Services Manager when it is
alleged that the Development Services Manager did not properly apply this section
7101.6, did not consider all of the relevant facts presented, made an error of fact or law,
abused discretion or acted arbitrarily and capriciously in the interpretation or
enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be
charged the applicant for the processing of appeals, to cover administrative
costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with
the Secretary of Highway Systems, which must be filed within ten (10) working
days from the date of the decision that is the subject of the appeal. The notice
of appeal shall refer to the decision being appealed, identify the appellant by
name, address and telephone number and state the grounds for the appeal.
The grounds shall include a written summary of the provisions of the policy
relevant to the appeal and/or the facts and law relied upon and shall include a
written argument in support of the appeal. The Commission shall not consider
a notice of appeal that does not comply with the provisions of this subsection.
C. Time to Reply: The Development Services Manager shall have ten (10)
working days from the date of the filing of the notice of appeal to reply to the
notice of the appeal, and may during such time meet with the appellant to
discuss the matter, and may also consider and/or modify the decision that is
being appealed. A copy of the reply and any modifications to the decision
being appealed will be provided to the appellant prior to the Commission
hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of
the appeal will be noticed and scheduled on the Commission agenda at a
regular meeting to be held within thirty (30) days following the delivery to the
appellant of the Development Services Manager's reply to the notice of
appeal. A copy of the decision being appealed, the notice of appeal and the
reply shall be delivered to the Commission at least one (1) week prior to the
hearing.
e. Action by Commission: Following the hearing, the Commission shall either
affirm or reverse, in whole or part, or otherwise modify, amend or supplement
the decision being appealed, as such action is adequately supported by the
law and evidence presented at the hearing.
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Ad
e,Dra_o
August 26, 2014
Boise Slam Basketball Club
683 W. Bird Way
Meridian, ID 83646
John S. Franden, President
Mitchell A. Jaurena, Vice President
Rebecca W. Arnold, Commissioner
Sara M. Baker, Commissioner
Jim D. Hansen, Commissioner
RE: MER14-0044 / CUP14-014 13660 E. Lanark St. / Boise Slam Basketball Club
PLAN ACCEPTANCE
The District has reviewed the building plans for the above referenced project for assessment of impact
fees. The District has no comment on the site improvements because all proposed improvements are
outside of ACHD right-of-way. If the scope of work changes to include work within the right-of-way, the
District will need to review and approve those changes.
Requirements Prior to Starting Work
1. Comply with all Standard Requirements of approval.
2. The impact fee must be paid prior to issuance of a building permit.
When Ready to Request ACHD Occupancy Sign -Off
1. Call 387-6380 and provide all information as shown in the header of this letter, i.e. the file
number, site address, and the name of the project. Please include your name and return phone
number.
Total Impact Fee due: $0
ACHD inspection is not required.
If you have any questions or concerns please feel free to contact me at (208) 387-6335.
Sincerely,
Austin Miller
Planner I
Development Services
cc: Project File
Volante Investments
Thornton Oliver Keller
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208 387 6170 • FX 387 6393 • www.achdidaho.org
OANO IDAHO TRANSPORTATION DEPARTMENT
P.O. Box 8028 (208) 334-8300
Boise, ID 83707-.2028 itd.idaho.gov
O 7.
ArRr10N
August 21, 2014
Machelle Hill
Meridian City Clerk's Office
33 East Broadway
Meridian, ID 83642
VIA EMAIL
RE: CUP -14-014 BOISE SLAM BASKETBALL CLUB
The Idaho Transportation Department has reviewed the proposed conditional use application
for the Boise Slam Basketball Club at 3660 E. Larnark Street east of SH -55 (Eagle Road).
ITD has the following comments:
1) ITD has no objection to this application and requires no mitigation. The trip volume is
similar to that anticipated under the Comprehensive Plan and there is no new access to
the State Highway System.
If you have any questions, you may contact Shona Tonkin at 334-8341 or me at 332-7191.
Sincerely,
fIQ
d
James K. Morrison
Development Services Manager
jim.morrrson(a7itd.idaho.gov
Machelle Hill
From: Mack Myers <mack@settlersirrigation.org>
Sent: Monday, September 15, 2014 11:56 AM
To: clerk; Bruce Freckleton
Subject: RE: City of Meridian Dev App - CUP 14-014
This will not impact any Settlers facilities.
Thanks,
Mack Myers
District Manager
Settlers Irrigation District
P.O. Box 7571
Boise, ID 83707
Office 208-343 5271 Fax 208 343-1642
From: Machelle Hill [mailto:mhill@meridiancity.org]
Sent: Wednesday, August 20, 2014 1:30 PM
Subject: City of Meridian Dev App - CUP 14-014
The City of Meridian is requesting comments and recommendations on the application referenced above. To review
detailed information about the request, please click on the file number above to take you directly to the application.
We request that you submit your comments or recommendations by date specified above. When responding, please
reference the file number of the project. If responding by email, please send comments to clerk cD-meridiancity.org.
For additional information associated with this application please contact City Clerk's Office at number below.
City of Meridian
EIDI
City Clerk's Office
33 E. Broadway Avenue
IDO
bAH
Meridian, ID 83642
Planning and Zoning Commission
Development Application Transmittal
To: Outer Agencies
j Comments due by: September 11, 2014
Transmittal Date: August 20, 2014
1 File No.: I CUP 14-014
HearingDate: September 18, 2014
Request:
Public Hearing: Conditional Use Permit approval for an indoor recreation facility in
an I -L zoning district for Boise Slam Basketball Club
B
Boise Slam Basketball Club
Location of Property or Project: 13660 E. Lanark
The City of Meridian is requesting comments and recommendations on the application referenced above. To review
detailed information about the request, please click on the file number above to take you directly to the application.
We request that you submit your comments or recommendations by date specified above. When responding, please
reference the file number of the project. If responding by email, please send comments to clerk cD-meridiancity.org.
For additional information associated with this application please contact City Clerk's Office at number below.
September 4, 2014
City of Meridian
City Clerk's Office
33 E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
RE: CUP14-014/Boise Slam Basketball Club
Dear Jaycee:
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Nampa & Meridian Irrigation District (NMID) has no comment on the above -referenced
application as this is shown to occupy an existing building.
All laterals and waste ways must be protected including private water users' facilities. All
municipal surface drainage must be retained on-site. If any surface drainage leaves the site,
Nampa & Meridian Irrigation District (NMID) must review drainage plans.
Sincerely,/t
LL
1.�•"
Greg G. Curtis
Water Superintendent
Na =.,,a & Mer aian.Irrigation District
GGC/dbg
PC: Office/File
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000