Loading...
HomeSearchMy WebLinkAboutTask Order 0637g with Hydro Logic, Inc. for Well 20b Uranium SolutionsTask Order 0766 with Parametrix for Revisions to Potable Water, Sanitary Sewer, Reclaimed Water 2nd AmendmentTask Order 10002C with Brown and Caldwell for WWTP Headworks Odor Control DesignTask Order 10011C with Civil Survey Consultants, Inc. for Well 10 Redesign Pumping FacilitiesTask Order 10011j with SPF Water Engineers for Well 10B DesignTask Order 10029 with JUB Engineers Inc. for Pine Trunk Sewer ConnectorTask Order 10045 with CH2M Hill, Inc. for WWTP Fermentation Design ProjectTask Order 10046d with JUB Engineering for WWTP Grit System Improvement ProjectTask Order 10049b with Civil Survey Consultants, Inc. for WWTP Micellaneous Asphalt Repair Topgraphic Mapping SurveysTask Order 10157 with Brown and Caldwell for SCADA planTask Order 10158b with SPF Water Engineers for WWTP Chemical Feed ProgramTask Order 10160b with Strata, Inc. for WWTP Tertiary Filters BuildingTask Order 10205G with Hydro Logic, Inc. for Well No. 16 Water Quality ImprovementsTask Order 10220 with Brown and Caldwell for Construction Stormwater ManagementTask Order 10221 with DC Engineers for Coordination Study Arc Flash Analysis for the WWTPTask Order 10222 with JUB Engineers for South Black Cat Lift Station Screening ImprovementsTask Order 10223 with DC Engineers for Coordination Study Arc Flash Analysis for Water DepartmentTask Order 10229A with Murray Smith and Associates for Sewer Study and RehabilitationTask Order 10230 with Civil Survey Consultants, Inc. for McMillan Road Water MainTask Order 10232 with Murray Smith Associates for Water Supply PlanningTask Order 10236 with Centra Consulting, Inc. for Runoff Management PlanTask Order 10237 with Murray Smith & Associates for NE 5th Street Water ReplacementTask Order 10238 with Brown and Caldwell for Implementation Plan Study for Microthrix ControlTask Order 10256a with Civil Survey Consultants, Inc. for Ten Mile Road and Ustick Road Intersection UtilityTask Order 10258 with CH2M Hill, Inc. for WWTP RAS Chlorination System OptimizationTask Order 10259 with CH2M Hill, Inc. for WWTP Operator TrainingTask Order 10261A with JUB Engineers for Tremont Lift Station AbandonmentTask Order 10262 with LCA Architects for Records Office Reconfiguration Concepts PDTask Order 10264 with HDR Engineering for NPDES Permit Strategy and Technical AssistanceTask Order 10268 with SPF Water Engineers for Reuse Tank Mixing and Disinfection Improvements Project WWTPTask Order 10272 with JUB Engineers for WWTP Secondary Clarifier RetrofitTask Order 10275a with Civil Survey Consultants, Inc. for Water Service Replacement Design W. Idaho Ave.Task Order 10277 with Civil Survey Consultants, Inc. for Nine Mile Creek Pipe Replacement Utility AdjustmentTask Order 10284 with CH2M Hill, Inc. for Iron and Manganese Pilot Testing