Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
Change Order No. 1 with Civil Survey Consultants, Inc. for Unexpected re-work due to Easements
Task Order No. 0606a with DC Engineering for Weather Station
Task Order No. 0612 with Transportation & Civil Solutions for Utilities in Conjunction with ACHD
Task Order No. 0658a with Civil Survey Consultants, Inc. for Surveying related to Water Main Easement
Task Order No. 0664 with Civil Survey Consultants, Inc. for Cherry Lane Mobile Home Parks Water System
Task Order No. 0666 with Civil Survey Consultants, Inc. for Downtown Meridian Sewer Relocation Study
Task Order No. 0669 with Civil Survey Consultants, Inc. for Meridian & Main Split Corridor Utility Improvements
Task Order No. 0672 with Parametrix for Water and Sewer Improvements in Conjunction with Road Improvements at Meridian & McMillan
Task Order No. 0713 with Civil Survey Consultants, Inc. for Flush Lines
Task Order No. 0718 with Civil Survey Consultants, Inc. for Consulting for Water and Sewer Systems
Task Order No. 0725 with Civil Survey Consultants, Inc. for Black Cat Road Water Main Extension
Task Order No. 0725 with Civil Survey Consultants, Inc. for Black Cat Road Water Main Extension Phase 2
Task Order No. 0730 with Civil Survey Consultants, Inc. for Bower Street Water Main Improvements
Task Order No. 0733a with Civil Survey Consultants, Inc. for Well 28 Pumping Facility
Task Order No. 1 with Hydro Logic, Inc. for Regulatory Compliance Ground Water Quality Issues
Task Order No. 1 with Hydro Logic, Inc. for Regulatory Compliance Ground Water Quality Issues 2
Task Order No. 1 with Murray Smith and Associates, Inc. for Water System Redundancy and Storage Evaluation
Task Order No. 1 with Murray Smith and Associates, Inc. for Water System Redundancy and Storage Evaluation 2
Task Order No. 2 with CH2M Hill, Inc. for Plant Optimization Desktop Analysis
Task Order No. 2 with HDR Engineering Inc. for Miscellaneous on-call GIS Services
Task Order No. 2 with Hydro Logic for Municipal Water Supply Well Evaluation and Rehabilitation
Task Order No. 2 with Hydro Logic, Inc. for Municipal Water Supply Well Evaluation and Rehabilitation
Task Order No. 2 with Murray Smith & Associates for Storm Water Program Analysis
Task Order No. 2.2 with CH2M HILL, Inc. for Design Ferric Chloride Feed Facilities
Task Order No. 3 with HDR Engineering, Inc. for Initial Distribution System Evaluation Oversight and Review
Task Order No. 3.0 with Brown & Caldwell for Storm Water Management Third Party Inspection
Task Order No. 3.0 with CH2M HILL, Inc. for Operations and Maintenance Audit
Task Order No. 4 with HDR Engineering, Inc. for Implementation of Heroes Park Water Reuse Demonstration