Loading...
HomeSearchMy WebLinkAboutAddendum No. 1 to Task Order 2.1 with JUB Engineers for Authorization for Additional Services for Ten Mile Creek Sewer CrossingAmendment No. 1 to Task Order No. 2.5 with CH2M HILL, Inc. Filter 4 Final DesignAmendment No. 1 to Task Order No. 4 with Carollo Engineers for Biosolids Improvement ProjectAmendment No. 4 to Agreement with CH2M Hill for South Area Lift Station and PipelineTask Order No. 0663a with CH2M Hill, Inc. for Regulatory Floodway Encroachment AssistanceTask Order No. 0726 with Civil Survey Consultants, Inc. for Water Division Facility Phase 2Task Order No. 0726a with Civil Survey Consultants, Inc. for Water Division Facility Phase 2Task Order No. 0726b with Civil Survey Consultants, Inc. for Water Division Facility Phase 2Task Order No. 0726D with Materials Testing and Inspection, Inc. for Water Division Facility Phase 2Task Order No. 0732 with Hydro Logic, Inc. for Municipal Water Supply Well Rehabilitation and TestingTask Order No. 0732a with Civil Survey Consultants, Inc. for Well 14 Pump ReplacementTask Order No. 0733 with Hydro Logic, Inc. for Well No. 28 Exploratory Testing Water SupplyTask Order No. 0741 with Civil Survey Consultants, Inc. for Ten Mile Road Interchange UtilityTask Order No. 0742 with Civil Survey Consultants, Inc. for Franklin Road Touchmark to Five Mile UtilityTask Order No. 0746 with Hydro Logic, Inc. for Supply Well 17 Wellhead Plumbing ModificationTask Order No. 0750 with Civil Survey Consultants, Inc. for Powers Residence Sewer Main ExtensionTask Order No. 0754 with Civil Survey Consultants, Inc. for Engineering Consulting Municipal Water and Sewer SystemsTask Order No. 0759 with Hydro Logic, Inc. for Ground Water Level Monitoring and Aquifer TestingTask Order No. 0766 Amendment with Parametrix for Sanitary Sewer System Improvements in Conjunction with Road Improvements at Franklin Road between Ten Mlle Road and Linder RoadTask Order No. 0766 with Parametrix for Water Improvements in Conjunction with Road Improvements at Franklin Road between Ten Mlle Road and Linder RoadTask Order No. 0767 with DC Engineering for Pressure Release Valve Scada Installation and ProgrammingTask Order No. 0768 with Murray, Smith and Associates for Water Master Plan Addendum associated with switching Well 14 to Zone 4Task Order No. 0770 with Murray, Smith and Associates for Well 23 Alternative Improvements AnalysisTask Order No. 0771 with Civil Survey Consultants, Inc. for License Agreements for Existing Water System Flush LinesTask Order No. 07-72 with JUB Engineerings for Downtown Sewer Study and CIP Phase 1Task Order No. 07-72 with JUB Engineerings for Downtown Sewer Study and CIP Phase 1 2Task Order No. 0773 with Pharmer Engineering, LLC for WWTP Daft RetrofitTask Order No. 0774 with CH2M HILL, Inc. for Sludge Management and Disposal PlanTask Order No. 0775 with Brown & Caldwell for Stormwater Pollution Prevention Plan Reviews and Third Party InspectionTask Order No. 0775 with Brown & Caldwell for Stormwater Pollution Prevention Plan Reviews and Third Party Inspection 2Task Order No. 0778 with DC Engineering for Whitestone Lift StationTask Order No. 0779 with DC Engineering for Mosher Lift StationTask Order No. 0782 with Hydro Logic, Inc. for Ground Water & Wells Data CompilationTask Order No. 0787 with Murray, Smith & Associates for Seasonal Well ConceptTask Order No. 08-01-PF with HDR Engineering, Inc. for Citywide Environmental & Fiscal Stewardship InitiativeTask Order No. 2.1 with JUB Engineers for Ten Mile Creek Sewer Crossing ReplacementTask Order No. 2.1A with JUB Engineers for Ten Mile Creek Sewer Crossing ReplacementTask Order No. 2.5 with CH2M HILL for Plant Drain System DesignTask Order No. 2.6 with CH2M HILL for CEPT Pilot Test SupportTask Order No. 2.7 with CH2M HILL for CEPT and Centrate Drain RevisionsTask Order No. 5 with CH2M HILL for QLPE ReviewsTask Order No. 5 with HDR Engineering, Inc. for Reclaimed Water Master PlanningTask Order No. 6 with HDR Engineering for Technical Support for Heroes Park Water Reuse DemonstrationTask Order No. CH1 with Teracon Consultants, Inc. for Limited Site InvestigationTask Order No. PKS 08-006 with Materials Testing and Inspecting for Settlers Village Square Phase One Improvements