Loading...
HomeSearchMy WebLinkAboutTask Order No. 0610C with JUB Engineers for Ten Mile Road Franklin to Cherry Reuse and Sewer Main DesignTask Order No. 0642C with Civil Survey Consultants, Inc. for Ten Mile Road Cherry Lane to Ustick Rd. Utility ImprovementsTask Order No. 0642c with Civil Survey Consultants, Inc. for Ten Mile Road Cherry Lane to Ustick Utility ImprovTask Order No. 0669B with Civil Survey Consultants, Inc. for Meridian Road and Main Street Split CorridorTask Order No. 0670f with Terracon Consultants for Well No. 27 Pumping FacilitiesTask Order No. 0710a with Hydro Logic for Municipal Water Supply Well #20 EvaluationTask Order No. 0711A with Hydro Logic for Well 18 EvaluationTask Order No. 0717a with DC Engineering, Inc. for Well 20 Control System StudyTask Order No. 0747 with CH2M HILL, Inc. for Design of the Ferric Chloride Feed FacilityTask Order No. 0766A with Parametrix for Sanitary Sewer and Muncipal Wastewater Reclamation LinesTask Order No. 0770a with Murray, Smith & Associates for Preparation of Operational Manual Addenda for Well 23Task Order No. 0772A with JUB Engineers for Downtown Sewer Study and CIP Phase 2Task Order No. 0775 Amendment with Brown & Caldwell for SWPPP and third party inspectionsTask Order No. 0775 Amendment with Brown & Caldwell for SWPPP and third party inspections (2)Task Order No. 0777a with HDR Engineering for Reclaimed Water Master PlanningTask Order No. 0784 with Hydro Logic, Inc. for Hydrogeologic framework and ground water geochemistryTask Order No. 0795 with Pharmer Engineering for Wastewater Capacity Situational AnalysisTask Order No. 0799 with HDR Engineering for 8th Street Cherry to Camella Utility adjustments and relocationTask Order No. 0805a with CH2M Hill, Inc. for Sidestream Nitrogen Removal Pilot TestTask Order No. 10000 with CH2M Hill, Inc. for Conceptual Design for Organic Waste Composting Facility (2)Task Order No. 10000 with CH2M Hill, Inc. for Conceptual Design for Organic Waste Composting Facility 1Task Order No. 10001 with CH2M Hill, Inc. for Engineering Services for Tertiary Filtration ProjeTask Order No. 10002 with CH2M Hill, Inc. for Odor Control StudyTask Order No. 10002a with CH2M Hill, Inc. for Odor Control Preliminary DesignTask Order No. 10002a with CH2M Hill, Inc. for Odor Control Preliminary Design (2)Task Order No. 10003 with DC Engineering for WWTP SCADA AutomationTask Order No. 10004 with T-O Engineers for Flood Study on Eight Mile CreekTask Order No. 10004A with T-O Engineers for Silverstone Letter of Map Revision, Phase 2 Eight Mile CreekTask Order No. 10005 with Civil Survey Consultants, Inc. for Meridian Road and Main Street Split Corridor Phase 2Task Order No. 10006 with Murray, Smith & Associates for On-Call Collection System Engineering ServicesTask Order No. 10008A with DC Engineering, Inc. for Tertiary Filter and DAFT Retrofit SCADATask Order No. 10009 with HDR Engineering for Heroes Park Pond Liner Replacement and Reclaimed Water Distribution and ReclaimationTask Order No. 10018a with CH2M Hill, Inc. for Additional Office Services and Contruction StakingTask Order No. 10060a with Brown & Caldwell for Reclaimed Water Booster Station and Reservoir Project DevelopmentTask Order No. 10081 with SPF Water Engineering for Well 9 Evaluation and RehabilitationTask Order No. 10082 with Hydro Logic for Well 23 Evaluation for Ground Water Quality Improvements In Municipal Supply Well 23 Including ASRTask Order No. 10083 with DC Engineering for Heroes Park Water Quality Analyzer RelocationTask Order No. 10085 with Hydro Logic for Continueing Services on Water Rights HousekeepingTask Order No. 10086 with Hydro Logic for Comprehensive Municipal Well Completion ReportsTask Order No. 10094 with Transportation & Civil Solutions for Downtown Water Line Replacement NW 4thTask Order No. 10095 with Civil Survey Consultants, Inc. for McMillan & Locust Grove Utility ImprovementsTask Order No. 10127 with Murray, Smith and Associates, Inc. for Infiltration and Inflow Monitoring Engineering ServicesTask Order No. 10138 with CH2M Hill, Inc. for WWTP Air Quality Permit Engineering and DesignTask Order No. 10143 with Brown & Caldwell for Construction Stormwater Management ProgramTask Order No. 10145 with Civil Survey Consultants, Inc for Engineering Consulting in Conjunction with Eagle and Victory Rd Intersection UtilityTask Order No. 10170 with Civil Survey Consultants, Inc. for Linder and Pine Intersection Utility ImprovementsTask Order No. 2.8 with CH2M HILL, Inc. for Sidestream Nitrogen Removal StudyTask Order No. 4 with Carollo Engineers for Biosolids Improvement Project Amendment No. 2Task Order No. 4 with Carollo Engineers for Biosolids Improvement Project Amendment No. 2 (2)Task Order No. GH-09-001 with CH2M Hill, Inc. for Air Quality Emissions Inventory Project 802Task Order No. PKS 09-002 with STRATA for 8th Street Park Pedestrian Pathway and Box Culverts