Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
Task Order No. 0610C with JUB Engineers for Ten Mile Road Franklin to Cherry Reuse and Sewer Main Design
Task Order No. 0642C with Civil Survey Consultants, Inc. for Ten Mile Road Cherry Lane to Ustick Rd. Utility Improvements
Task Order No. 0642c with Civil Survey Consultants, Inc. for Ten Mile Road Cherry Lane to Ustick Utility Improv
Task Order No. 0669B with Civil Survey Consultants, Inc. for Meridian Road and Main Street Split Corridor
Task Order No. 0670f with Terracon Consultants for Well No. 27 Pumping Facilities
Task Order No. 0710a with Hydro Logic for Municipal Water Supply Well #20 Evaluation
Task Order No. 0711A with Hydro Logic for Well 18 Evaluation
Task Order No. 0717a with DC Engineering, Inc. for Well 20 Control System Study
Task Order No. 0747 with CH2M HILL, Inc. for Design of the Ferric Chloride Feed Facility
Task Order No. 0766A with Parametrix for Sanitary Sewer and Muncipal Wastewater Reclamation Lines
Task Order No. 0770a with Murray, Smith & Associates for Preparation of Operational Manual Addenda for Well 23
Task Order No. 0772A with JUB Engineers for Downtown Sewer Study and CIP Phase 2
Task Order No. 0775 Amendment with Brown & Caldwell for SWPPP and third party inspections
Task Order No. 0775 Amendment with Brown & Caldwell for SWPPP and third party inspections (2)
Task Order No. 0777a with HDR Engineering for Reclaimed Water Master Planning
Task Order No. 0784 with Hydro Logic, Inc. for Hydrogeologic framework and ground water geochemistry
Task Order No. 0795 with Pharmer Engineering for Wastewater Capacity Situational Analysis
Task Order No. 0799 with HDR Engineering for 8th Street Cherry to Camella Utility adjustments and relocation
Task Order No. 0805a with CH2M Hill, Inc. for Sidestream Nitrogen Removal Pilot Test
Task Order No. 10000 with CH2M Hill, Inc. for Conceptual Design for Organic Waste Composting Facility (2)
Task Order No. 10000 with CH2M Hill, Inc. for Conceptual Design for Organic Waste Composting Facility 1
Task Order No. 10001 with CH2M Hill, Inc. for Engineering Services for Tertiary Filtration Proje
Task Order No. 10002 with CH2M Hill, Inc. for Odor Control Study
Task Order No. 10002a with CH2M Hill, Inc. for Odor Control Preliminary Design
Task Order No. 10002a with CH2M Hill, Inc. for Odor Control Preliminary Design (2)
Task Order No. 10003 with DC Engineering for WWTP SCADA Automation
Task Order No. 10004 with T-O Engineers for Flood Study on Eight Mile Creek
Task Order No. 10004A with T-O Engineers for Silverstone Letter of Map Revision, Phase 2 Eight Mile Creek
Task Order No. 10005 with Civil Survey Consultants, Inc. for Meridian Road and Main Street Split Corridor Phase 2
Task Order No. 10006 with Murray, Smith & Associates for On-Call Collection System Engineering Services
Task Order No. 10008A with DC Engineering, Inc. for Tertiary Filter and DAFT Retrofit SCADA
Task Order No. 10009 with HDR Engineering for Heroes Park Pond Liner Replacement and Reclaimed Water Distribution and Reclaimation
Task Order No. 10018a with CH2M Hill, Inc. for Additional Office Services and Contruction Staking
Task Order No. 10060a with Brown & Caldwell for Reclaimed Water Booster Station and Reservoir Project Development
Task Order No. 10081 with SPF Water Engineering for Well 9 Evaluation and Rehabilitation
Task Order No. 10082 with Hydro Logic for Well 23 Evaluation for Ground Water Quality Improvements In Municipal Supply Well 23 Including ASR
Task Order No. 10083 with DC Engineering for Heroes Park Water Quality Analyzer Relocation
Task Order No. 10085 with Hydro Logic for Continueing Services on Water Rights Housekeeping
Task Order No. 10086 with Hydro Logic for Comprehensive Municipal Well Completion Reports
Task Order No. 10094 with Transportation & Civil Solutions for Downtown Water Line Replacement NW 4th
Task Order No. 10095 with Civil Survey Consultants, Inc. for McMillan & Locust Grove Utility Improvements
Task Order No. 10127 with Murray, Smith and Associates, Inc. for Infiltration and Inflow Monitoring Engineering Services
Task Order No. 10138 with CH2M Hill, Inc. for WWTP Air Quality Permit Engineering and Design
Task Order No. 10143 with Brown & Caldwell for Construction Stormwater Management Program
Task Order No. 10145 with Civil Survey Consultants, Inc for Engineering Consulting in Conjunction with Eagle and Victory Rd Intersection Utility
Task Order No. 10170 with Civil Survey Consultants, Inc. for Linder and Pine Intersection Utility Improvements
Task Order No. 2.8 with CH2M HILL, Inc. for Sidestream Nitrogen Removal Study
Task Order No. 4 with Carollo Engineers for Biosolids Improvement Project Amendment No. 2
Task Order No. 4 with Carollo Engineers for Biosolids Improvement Project Amendment No. 2 (2)
Task Order No. GH-09-001 with CH2M Hill, Inc. for Air Quality Emissions Inventory Project 802
Task Order No. PKS 09-002 with STRATA for 8th Street Park Pedestrian Pathway and Box Culverts