Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
Amendment No 1 to Task Order 10601 A with Brown and Caldwell for WRRF Capacity Exansion for FY16
Approval of Master Agreements and Task Order from SPF Water to Wester W.E. LLC
Change Order No. 1 to Task Order 10461 with SPF Engineering for Well 29 Water Test Well Design
Contract Amendment No 1 with Taser International for Body Worn Cameras
Contract Amendment No 2 with BASF Corporation for Liquid Emulsion Polymer
Contract Amendment No 3 with Weschem for Bulk Ferric Chloride
Executed Change Order No 1 with Cascade Enterprises for the WWTP Safety Upgrades
Executed Change Order No 2 with DC Engineering for SCADA System Upgrades
Executed Contract Amendment No 1 - Goose Control Fy2016
Executed Task Order 10568 - JUB - Emergency Response Plan Update
Executed Task Order 10611 CH2M WRRF Lift Station Integration
Task Order 10012 e with Civil Survey Consultants for Well 30 Pumping Facilities
Task Order 10023 k with JUB Engineers for 2016 Meridian Sewer Master Plan Update
Task Order 10044 with CH2M Hill for the WRRF Headworks Capacity Expansion
Task Order 10055 D with CH2MHill for WRRF UV Disinfection System Expansion
Task Order 10135 b with Murray Smith for Sewer Line Replacement at Gregory Lift Station
Task Order 10383.A with SPF Water Engineering for Well 29 Interactive Display
Task Order 10461 e with SPF Water for Well 29 Well House Equipment
Task Order 10518a with Jensen Belts for Bellano Creek Park Design
Task Order 10519b with Mountain Waterworks Inco for WRRF Centrate Modifications
Task Order 10577 a with Civil Survey Cosultants for Water and Sewer Line Replacement at E Pine and Meridian to 6th
Task order 10596.a with CH2MHill for WWTP PLC Replacement
Task Order 10601A with Brown and Caldwell for WRRF Capacity Expansion
Task Order 10613 A with JUB for E Washington and Carlton Sewer Replacement
Task Order 10614 a with JUB Engineers for Black Cat Trunk Sewer Phase 5 Design
Task Order 10615 a with Bowen Collins for Controls Design and Programming
Task Order 10618 a with Civil Survey Consultants for W Washington to NW 4th Sewer Line Replacement
Task Order No 10417.j with DC Engineering for Meridian SCADA Communications
Task Order No. 10460.F with Brown and Caldwell for Meridian Upgrade Alternatives Analysis
Task Order No. 10533.a with Civil Survey Consultants for Amity Rd and Meridian Rd Waterline Extension