Project Final Acceptance Letter - Shelburne East Subdivision Offsite Water Line
Public Works Department ◼ 33 E Broadway Ave, Suite 200, Meridian, ID 83642
Phone 208-898-5500 ◼ Fax 208-898-9551 ◼ www.meridiancity.org
Mayor Robert E. Simison
City Council Members:
Joe Borton
Liz Strader
Brad Hoaglun
John Overton
Jessica Perreault
Luke Cavener
August 16, 2023
Randall S. Clarno – Managing Member
Shelburne Properties LLC
7440 E. Pinnacle Peak Road #142
Scottsdale, AZ 85255
RE: Shelburne East Offsite Water Line – Final Acceptance
Dear Randal S. Clarno:
Installation of this project’s sanitary sewer and/or domestic water systems has been satisfactorily
completed in accordance with the approved plans. These systems have passed the required testing in
accordance with City of Meridian Standard Specifications and Drawings, and therefore are hereby
accepted by the City for ownership and normal maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to the
Idaho Department of Environmental Quality. The engineer of record is responsible for certification of
the record drawings as to horizontal and vertical location of all public water and sewer facilities
installed.
In accordance with the City of Meridian’s Unified Development Code §11-5C-3, and the City of
Meridian’s Supplemental Specifications and Drawings to the Idaho Standards for Public Works
Construction, Current Edition, the installation and materials of the sewer and domestic water systems
are to be warranted against defect by the owner for a period of two-years from the date of this letter.
Sincerely,
Warren Stewart, P.E.
City Engineer
cc. City Clerk
PW - Water Division
PW - Wastewater Division
PW - Construction Division
File