Loading...
Z - Project Final Acceptance Letter ◼ ◼◼ January 26, 2022 Mr. Jonathan Gillen – Operations Officer West Ada School District 1303 East Central Drive Meridian, ID 83642 RE: Idaho Fine Arts Academy-West Ada School District – Final Acceptance Dear Mr. Jonathan Gillen: Installation of this project’s sanitary sewer and/or domestic water systems has been satisfactorily completed in accordance with the approved plans. These systems have passed the required testing in accordance with City of Meridian Standard Specifications and Drawings, and therefore are hereby accepted by the City for ownership and normal maintenance. Record drawings submitted to us for this project are also accepted and are being forwarded to the Idaho Department of Environmental Quality. The engineer of record is responsible for certification of the record drawings as to horizontal and vertical location of all public water and sewer facilities installed. In accordance with the City of Meridian’s Unified Development Code §11-5C-3, and the City of Meridian’s Supplemental Specifications and Drawings to the Idaho Standards for Public Works Construction, Current Edition, the installation and materials of the sewer and domestic water systems are to be warranted against defect by the owner for a period of two-years from the date of this letter. Sincerely, Warren Stewart, P.E. City Engineer cc. City Clerk PW - Water Division PW - Wastewater Division PW - Construction Division File