Z - Revised Findings SignedCITY OF MERIDIAN
FINDINGS OF FACT, CONCLUSIONS OF LAW E
AND DECISION & ORDER 1,�"'�►1'� %—'�
In the Matter of the Request for Annexation and Zoning of 38.15 Acres of Land with an R-15
Zoning District; and Preliminary Plat consisting of (212) Single -Family Residential Building Lots,
(1) Multi -Family Building Lot and (22) Common Lots on 35.67 Acres of Land in the R-15 Zoning
District for Stapleton Subdivision, by Stapleton, LLC.
Case No(s). H-2018-0129
For the City Council Hearing Date of: May 7, 2019 (Findings on May 21, 2019)
A. Findings of Fact
1. Hearing Facts (see attached Staff Report for the hearing date of May 7, 2019, incorporated by
reference)
2. Process Facts (see attached Staff Report for the hearing date of May 7, 2019, incorporated by
reference)
3. Application and Property Facts (see attached Staff Report for the hearing date of May 7, 2019,
incorporated by reference)
4. Required Findings per the Unified Development Code (see attached Staff Report for the hearing
date of May 7, 2019, incorporated by reference)
B. Conclusions of Law
1. The City of Meridian shall exercise the powers conferred upon it by the "Local Land Use
Planning Act of 1975," codified at Chapter 65, Title 67, Idaho Code (I.C. §67-6503).
2. The Meridian City Council takes judicial notice of its Unified Development Code codified at
Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has, by
ordinance, established the Impact Area and the Amended Comprehensive Plan of the City of
Meridian, which was adopted April 19, 2011, Resolution No. 11-784 and Maps.
3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A.
4. Due consideration has been given to the comment(s) received from the governmental
subdivisions providing services in the City of Meridian planning jurisdiction.
5. It is found public facilities and services required by the proposed development will not impose
expense upon the public if the attached conditions of approval are imposed.
6. That the City has granted an order of approval in accordance with this Decision, which shall be
signed by the Mayor and City Clerk and then a copy served by the Clerk upon the applicant, the
Community Development Department, the Public Works Department and any affected party
requesting notice.
CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER
FILE NO(S). H-2018-0129 - 1 -
Meridian City Council Meeting Agenda October 22, 2019 — Page 171 of 793
7. That this approval is subject to the Conditions of Approval all in the attached Staff Report for the
hearing date of May 7, 2019, incorporated by reference. The conditions are concluded to be
reasonable and the applicant shall meet such requirements as a condition of approval of the
application.
C. Decision and Order
Pursuant to the City Council's authority as provided in Meridian City Code § 11-5A and based upon
the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that:
1. The applicant's request for annexation & zoning and preliminary plat is hereby approved with
the requirement of a Development Agreement per the provisions in the Staff Report for the
hearing date of May 7, 2019, attached as Exhibit A.
2. The City Council approved a modification to UDC 11-311-413.2 to allow anew access via SH -
69; and vacated the applicant's request for a Variance due to the Idaho Transportation
Department's approval of the proposed access via SH -69 in accord with UDC 11-3H-3.
D. Notice of Applicable Time Limits
Notice of Preliminary Plat Duration
Please take notice that approval of a preliminary plat, combined preliminary and final plat, or
short plat shall become null and void if the applicant fails to obtain the city engineer's signature
on the final plat within two (2) years of the approval of the preliminary plat or the combined
preliminary and final plat or short plat (UDC 11 -6B -7A).
In the event that the development of the preliminary plat is made in successive phases in an
orderly and reasonable manner, and conforms substantially to the approved preliminary plat,
such segments, if submitted within successive intervals of two (2) years, may be considered for
final approval without resubmission for preliminary plat approval (UDC 11 -6B -7B).
Upon written request and filed by the applicant prior to the termination of the period in accord
with 11-613-7.A, the Director may authorize a single extension of time to obtain the City
Engineer's signature on the final plat not to exceed two (2) years. Additional time extensions up
to two (2) years as determined and approved by the City Council may be granted. With all
extensions, the Director or City Council may require the preliminary plat, combined
preliminary and final plat or short plat to comply with the current provisions of Meridian City
Code Title 11. If the above timetable is not met and the applicant does not receive a time
extension, the property shall be required to go through the platting procedure again (UDC 11-
6B -7C).
Notice of Development Agreement Duration
The city and/or an applicant may request a development agreement or a modification to a
development agreement consistent with Idaho Code section 67-6511A. The development
agreement may be initiated by the city or applicant as part of a request for annexation and/or
rezone at any time prior to the adoption of findings for such request.
A development agreement may be modified by the city or an affected parry of the development
CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER
FILE NO(S). H-2018-0129 -2-
Meridian
2 -
Meridian City Council Meeting Agenda October 22, 2019 — Page 172 of 793
agreement. Decision on the development agreement modification is made by the city council in
accord with this chapter. When approved, said development agreement shall be signed by the
property owner(s) and returned to the city within six (6) months of the city council granting the
modification.
A modification to the development agreement may be initiated prior to signature of the
agreement by all parties and/or may be requested to extend the time allowed for the agreement
to be signed and returned to the city if filed prior to the end of the six (6) month approval
period.
E. Notice of Final Action and Right to Regulatory Takings Analysis
1. The Applicant is hereby notified that pursuant to Idaho Code 67-8003, denial of a development
application entitles the Owner to request a regulatory taking analysis. Such request must be in
writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the
final decision concerning the matter at issue. A request for a regulatory takings analysis will
toll the time period within which a Petition for Judicial Review may be filed.
2. Please take notice that this is a final action of the governing body of the City of Meridian.
When applicable and pursuant to Idaho Code § 67-6521, any affected person being a person
who has an interest in real property which may be adversely affected by the final action of the
governing board may within twenty-eight (28) days after the date of this decision and order
seek a judicial review as provided by Chapter 52, Title 67, Idaho Code.
F. Attached: Staff Report for the hearing date of May 7, 2019.
CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER
FILE NO(S). H-2018-0129 -3 -
Meridian City Council Meeting Agenda October 22, 2019 — Page 173 of 793
By action of the City Council at its regular meeting held on the
2019.
COUNCIL, PRESIDENT JOE BORTON
COUNCIL VICE PRESIDENT LUKE CAVENER
COUNCIL MEMBER ANNE LITTLE ROBERTS
COUNCIL MEMBER TY PALMER
COUNCIL MEMBER TREG BERNT
22nd dayof QC�Obr�—
VOTED A7P
VOTED �h
VOTED
VOTED
VOTED—
COUNCIL
OTED
COUNCIL MEMBER GENESIS MILAM VOTED &v
MAYOR TAMMY de WEERD V OTED_--\-
(TIE BREAKER)
Mayor Ta de Weerd
Attest:
P�E0 AUGUST
doe- '• ,�
o�
z c•;ty of
g IDIAN�
1s J w .
Clerk �y�
O��TFR or the TREP�`
Copy served upon Applicant, Community Development Department, Public Works Department and City
Attorney.
By: OvLpy W—?-) Dated:
City Clerk's Office
CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER
FILE NO(S). H-2018-0129 - 4 -
S�a pion Revi5ecl
EXHIBIT A
STAFF REPORT
COMMUNITY DEVELOPMENT DEPARTMENT
HEARING May 7, 2019
DATE: (Continued from April 2, 2019)
TO: Mayor & City Council
FROM: Sonya Allen, Associate Planner
208-884-5533
Bruce Freckleton, Development
Services Manager
208-887-2211
SUBJECT: H-2018-0129
Stapleton Subdivision
LOCATION: 4435 S. Meridian Road
I _W11111111
C%WEF�
�J
NOTE: Durinz the processinz of this application, City staff had not receive ITD's formal
recommendation for the access to SH 69 and a variance application was submitted
concurrently with the annexation and preliminary plat application. After the proiect was
scheduled for the Commission hearing, the TIS submitted with the application
corroborated the need for the access to SH 69 based on the trips Qenerated by the proposed
development. Further, the study confirmed the proposed access point would receive ITD
approval. Based on this information, it has been determined by City staff that a variance
application is no lon>;er warranted however, the decision of the access is the City Council's
discretion in accord with UDC 11-3H-3. Because the variance is not required, staff
recommends that the Council acknowledw the vacate the variance from the a,-enda before
acting; on this application. Further, the staff report has been updated in a strike-throueh
format removin;; any references to the variance commentary. A UDC Text Amendment is
currently in process to remove the access to highways for the variance section in Chapter S
to avoid this confusion movinm forward.
Annexation and zoning of 38.15 acres of land with an R-15 zoning district; Preliminary plat
consisting of (212) single-family residential building lots, (1) multi -family building lot and (22)
common lots on 35.67 acres of land in the R-15 zoning district; -uad�r-ia-nee to UPC 11 3144B fe
aeeess to Stme Highway 69/S. Mer-idian Rd.
Page 1
Meridian City Council Meeting Agenda October 22, 2019 — Page 175 of 793
II. SUMMARY OF REPORT
A. Project Summary
Description Details
Acreage
35.67
Future Land Use Designation
MU -R (Mixed Use — Regional)
Existing Land Use
Existing home & accessory structures (vacant)
Proposed Land Use(s)
Residential (SFR & MFR)
Current Zoning
RUT in Ada County
Proposed Zoning
R-15
Lots (# and type; bldg/common)
213 building/22 common
Phasing plan (# of phases)
Yes; 5 phases
Number of Residential Units (type
240 units total (96 attached/116 detached SFR, 28 MFR)
of units)
Density (gross & net)
6.73 gross
Open Space (acres, total [%] /
5.43 acres (15.2%)
buffer / qualified)
Amenities
Basketball court, dog park for small dogs, 24' x 36' children's
play structure, swings, rock climbing boulders and a climbing
dome structure, big wheel track, benches, pedestrian
pathways, segment of multi -use pathway system.
Physical Features (waterways,
An irrigation ditch runs along the northeast corner of the site,
hazards, flood plain, hillside)
the Carlson Lateral runs along the west boundary of the site,
and the Northwest gas pipeline runs along the southwest
corner of the site. The topography of this site slopes
considerably down on the northeast portion of the site.
Neighborhood meeting date; # of
July 18, 2018; 6 attendees
attendees:
January 16, 2019; 3 attendees
History (previous approvals)
• CPA -08-001 (amendment to the Comprehensive Plan
FLUM to change the land use designation from MDR to
MU -R - approved);
• AZ -08-005 (a Development Agreement was required as a
provision of annexation — the DA was never signed,
therefore the annexation approval is null and void);
• VAR -08-008 (approved 3 access points to SH 69/S.
Meridian Rd. — this approval has since expired because
the property was never annexed);
• MDA -11-010 (modification to the DA to extend the time
period allow for the agreement to be signed — the DA was
never signed and expired)
B. Community Metrics
Page 2
Meridian City Council Meeting Agenda October 22, 2019 — Page 176 of 793
Description
Details
Pa
ge
Ada County
Highway District
• Staff report
Yes (draft) — see Section VII.
(yes/no)
• Requires
Yes, for modification to Master Street Map for collector street
ACHD
Commission
Action
es/no
Fire Service
• Distance to
2.9 miles from Fire Station #1
Fire Station
• Fire
5 minutes under ideal conditions
Response
Time
• Resource
63% from Fire Station #1 — does not meet the target goal of 85% or greater
Reliability
• Risk
1 (residential)
Identificatio
n
• Accessibility
signage for addressing needs to be provided for homes accessed by the common
driveways on Lots 10 & 61, Block 1; Lots 23 & 29, Block 2; and Lot 28, Block 3
• Special/reso
None
urce needs
• Water
Requires 1,000 gallons per minute for 2 hours
Supply
• Other
NA
Resources
Police Service
• Distance to
3.5 miles
Police
Station
• Police
3-4 minutes
Response
Time
• Calls for
104 within a mile of the site between 1/1/18-12/31/18
Service
• Accessibility
Harris St. and SH -69; future stub to south
• Specialty/res
No additional staffing, equipment needs or other resources needed to serve this
ource needs
development
• Crimes
• Crashes
12 crashes within a mile of the site 66% injury related between 1/1/18 and 12/31/18
West Ada School
District
• Distance
Mary McPherson Elementary — 1 mile; Victory Middle School — 1.6 miles; Meridian
(elem, ms,
High School — 4.4 miles
Its)
• Capacity of
Mary McPherson Elementary 650; Victory Middle School 1,000; Meridian High
Schools
School 2,400
• # of Students
Mary McPherson Elementary 525; Victory Middle School 928; Meridian High
Enrolled
Schoo11,913
Page 3
Meridian City Council Meeting Agenda October 22, 2019 — Page 177 of 793
• Anticipated 178
schoolaged
children
generated by
this
Wastewater
• Distance to
200 -feet, Bore under Meridian Road
Sewer
Services
• Sewer Shed
NA
• Estimated
See application information
Project
Sewer
ERU's
• WRRF
13.57 MGD
Declining
Balance
• Project
Yes
Consistent
with WW
Master
Plan/Facility
Plan
Water
• Distance to
0 -feet
Water
Services
• Pressure
5
Zone
• Estimated
See application information
Project
Water
ERU's
• Water
None
Quality
• Project
Yes
Consistent
with Water
Master Plan
• Impacts/Con
Each phase must be modeled as developed to ensure adequate fire flow. If a
cerns
transportation/pathway connection is built to the west (proposed Graycliff
Apartments), a water main connection shall be required under said connection.
C. Project Area Maps
Future Land Use Map
Page 4
Aerial Map
Meridian City Council Meeting Agenda October 22, 2019 — Page 178 of 793
ol"All IN
LAMIT
IV. NOTICING
Newspaper Notification
Radius notification mailed to
properties within 300 feet
Public hearing notice sign posted
on site
Nextdoor posting
V. STAFF ANALYSIS
A. ANNEXATION & ZONING
Planning & Zoning
Posting Date
12/28/2018
12/26/2018
1/4/2019
12/26/2018
Comprehensive Plan (https://www.meridianciU.or /� compplan):
City Council
Postine Date
The Future Land Use Designation (FLUM) for this site is Mixed Use — Regional (MU -R) — The
purpose of this designation is to provide a mix of employment, retail, and residential dwellings
and public uses near major arterial intersections. The intent is to integrate a variety of uses
together, including residential, and to avoid predominantly single -use developments such as a
regional retail center with only restaurants and other commercial uses. Developments should be
anchored by uses that have a regional draw with the appropriate supporting uses. MU -R
developments are encouraged to be designed according the MU -R plan depicted in Figure 3-5
below:
3-5.
0001
I loViAdiry
OAT Parks'
I k,d 1La1rn
Transportation:
I
i
k Kdi 4r fnlwor f wd fr
r-+�
171 471 f
ArGerol I#+ad
wgit hmiy
FvArda
AmkF
5114MUse
The Master Street Map (MSM) depicts a planned north/south collector street through and along
the west boundary of the site from W. Harris St. to W. Amity Rd. (see blue and orange dashed
line on map below).
Page 6
Meridian City Council Meeting Agenda October 22, 2019 — Page 180 of 793
The collector street designation was placed on this property because of the Comprehensive Plan
amendment to the FLUM approved in 2008 which changed the land use designation on this
property and the property to the south to MU -R. Because of the intensity of uses (i.e. commercial,
office and multi -family residential — see concept plan below) planned with the associated
development, there was a need to disperse traffic to the signals at Amity Rd. and Meridian
Rd./SH-69 and the future signal at Harris St. and Meridian Rd./SH-69. This street was intended to
serve as a backage road for the commercial development along SH -69. However, the property
was never annexed and the property was not developed as intended.
Page 7
Meridian City Council Meeting Agenda October 22, 2019 — Page 181 of 793
The proposed plat depicts a short segment (400'+/-) of the collector street (N. Lone Pine Way)
from W. Harris St. to the intersection of W. Radiant Edge Dr.; and W. Lyra St. from SH -69 and
S. Solaris Ave. to the south; a continuous collector street is not proposed through the site
therefore, the proposed street network is not consistent with the MSM. However, ACHD is of the
opinion the proposal to construct two discontinuous collector streets meets the intent of the MSM
and doesn't preclude the construction of the southern segment in the future.
The Applicant is requesting a modification to the MSM to eliminate the continuous collector
street through this site to better reflect the proposed land uses. With development applications to
the west of this site, a north/south collector street from Harris to Amity is required to be
constructed at the half mile in accord with the MSM.
Land Use:
The proposed land use for this site is a mix of single-family residential attached and detached
units (212 units) with a small portion of multi -family 4-plex units (28 units) at an overall gross
density of 6.73 units per acre. This land is part of a larger Mixed Use designated area in this
vicinity. The MU -R designation stretches along the frontage of SH -69 from W. Harris St. to W.
Amity Rd. with MU -C (Mixed Use — Community) to the south across Amity; MU -NR (Mixed
Use — Non -Residential) designated land exists to the east across SH -69 and south of Amity (see
FLUM below).
The Applicant submitted a bubble plan included in Section VII.G that demonstrates how the
property owner to the south of this site anticipates that property developing with a mix of uses
consisting of office/multi-family residential as a buffer and transition to the single-family
residential planned on this site with commercial, office and retail uses further to the south.
Page 8
LFR,
E 1.tiL}}bT�
E Pmt
E ARrj
Meridian City Council Meeting Agenda October 22, 2019 — Page 182 of 793
Comprehensive Plan Policies (https://www.meridiancity.or /g compplan):
Goals, Objectives, & Action Items: Staff finds the following Comprehensive Plan policies to be
applicable to this application and apply to the proposed use of this property (staff analysis in
italics):
"Provide for a wide diversity of housing types (single-family, modular, mobile homes and
multi -family arrangements) and choices between ownership and rental dwelling units for all
income groups in a variety of locations suitable for residential development." (3.07.03B)
A mix of single family attached and detached homes and multi family apartment units are
proposed within this development which will provided ownership and rental options for
various income groups in this area.
• "Provide housing options close to employment and shopping centers." (3.07.02D)
The proposed development will provide housing options in close proximity to future office
and commercial uses planned to develop on the adjacent property to the south.
"Locate high-density development, where possible, near open space corridors or other
permanent major open space and park facilities, Old Town, and near major access
thoroughfares." (3.07.02L)
The proposed development falls within the medium -density category. The site is located in
close proximity to a future City park to the west and an existing City Park (Bear Creek) to the
north and a segment of the City's multi -use pathway system to the west and along SH -69, a
major access thoroughfare. For this reason, Staff is of the opinion a higher density would be
more appropriate in this area; however, the proposed density is higher than the adjacent
residential developments to the north and west and although at the low end, it falls within the
desired density range of 6 to 40 units per acre in mixed use designated areas.
"Consider ACHD's Master Street Map (MSM) in all land use decisions." (3.03.04K)
The MSM depicts a north/south collector roadway across this site providing access between
W. Harris St. and W. Amity Rd. and to the future signal at Harris St./SH--69 and the existing
signal at Amity/SH-69. The proposed plan depicts a 400+1 -foot long segment of a collector
street (N. Lone Pine Way) at the entry of the development from Harris St. and a 225+1 -foot
long segment of a collector street (S. Solaris Ave) at the south boundary with local streets in
between that do not provide a direct connection between Harris and Amity which is not
consistent with the MSM. However, because the development plan for this site and the
property to the south has changed from that previously proposed which warranted the
provision of a collector street in this area and because ACHD has approved the proposed
street layout/designations, Staff is amenable to the proposed design without the provision of a
full collector street.
• "Require open space areas within all development." (6.01.01A)
An open space exhibit is included in Section MLD that appears to comply with the minimum
UDC standards although some of the areas (as noted) do not count toward qualified open
space per the standards listed in UDC 11-3G-3.
• "Permit new development only where urban services can be reasonably provided at the time
of final approval and development is contiguous to the City." (3.01.01F)
The proposed development is contiguous to the City and urban services can be provided to
this development.
• "Restrict private curb cuts and access points on collectors and arterial streets." (3.06.02D)
One (1) access is proposed via W Harris St., a collector street; and one (1) access is
proposed via SH -69, a state highway. Access via SH -69 is prohibited per UDC 11-3H-4B,—a
Page 9
Meridian City Council Meeting Agenda October 22, 2019 — Page 183 of 793
. Note: Without access
via SH -69, a secondary emergency access is required that meets Fire Department
requirements (IFC Section D104.3).
• "Work with ACHD, COMPASS, and VRT on bringing public transportation to and through
Meridian." (3.03.04H)
The Applicant contacted VRT to see if a bus stop is needed on this site; VRT stated their long-
term plan (ValleyConnect 2.0) does not include any service along S. Meridian Rd./SH--69.
"Require pedestrian access connectors in all new development to link subdivisions together to
promote neighborhood connectivity as part of a community pathway system." (3.03.03B)
A segment of the City's multi -use pathway system is proposed at the southwest corner of the
site which will assist in providing connectivity with adjacent developments and the future City
Park to the west. Pedestrian access connectors are provided internally to the sidewalks along
Harris St. and the multi -use pathway along SH -69. One other pedestrian connection is
proposed to the west on Lot 26, Block 3 which also serves as the access driveway to a new
pressure irrigation pump station and an existing irrigation diversion structure.
"Work with transportation agencies and private property owners to preserve transportation
corridors, future transit routes and infrastructure, road and highway extensions, and to
facilitate access management planning." (3.01.01J)
The Applicant has been working with ITD on the proposed access via SH -69 and with ACHD
on the proposed access via W. Harris St. and internal roadways. The UDC (I1 -3H-4)
prohibits new approaches to state highways;
aeeess. Stafffinds approving the access via SH -69 does notpreserve the transportation
corridor.
• "Develop alternative modes of transportation through pedestrian improvements, bicycle
lanes, off-street pathways, and transit -oriented development as appropriate." (3.03.03D)
VRT (ValleyConnect 2.0) does not have any bus service along S. Meridian Rd./SH--69. A 10 -
foot wide multi -use pathway is required as proposed along SH -69 and across the southwest
corner of this site within the Northwest Pipeline easement for pedestrian/bicycle use.
In reviewing development applications, the following items will be considered in all Mixed
Use areas, per the Comprehensive Plan (pgs. 23-24): (Staffs analysis in italics)
"Residential densities should be a minimum of six dwellings/acre."
The gross density of the proposed development is 6.73 units per acre which falls at the low
end of the 6 to 40 unit per acre range desired in MU -R designated areas but is within the
desired range. Higher residential densities are anticipated on the R-40 zoned property to the
west.
"Where feasible, higher density and/or multi -family residential development will be
encouraged, especially for projects with the potential to serve as employment destination
centers and when the project is adjacent to US 20/26, SH -55, SH -16 or SH -69."
Although the proposed development does include a multi family component and meets the
minimum density desired in mixed use areas, because this site is adjacent to a major
transportation corridor (SH -69) and within a mile and a half of a mobility corridor (Lake
Hazel Rd.), AND is designated on the FL UM as MU -R in which large employment and retail
uses with a regional draw are anticipated, Staff is of the opinion a higher density and/or
more multi family units would be appropriate in this area to support the future
commercial/office%mployment uses desired in this area.
• "A conceptual site plan for the entire mixed-use area should be included in the application."
Page 10
Meridian City Council Meeting Agenda October 22, 2019 — Page 184 of 793
A bubble plan was submitted for the overall MU -R area (see Section VII. G); however, only
the northern 36+/- acre portion of that area is included in this application, the remaining
30+/- acres is not apart of this application and therefore future development cannot be held
to the plan. Without both properties developing together; staff believes that the projects may
not be as well-intregrated as desired by the Comprehensive Plan.
• "In developments where multiple commercial and/or office buildings are proposed (not
residential), the buildings should be arranged to create some form of common, usable area,
such as a plaza or green space."
This development does not contain commercial/office buildings.
"The site plan should depict a transitional use and/or landscaped buffering between
commercial and existing low- or medium -density residential development."
The proposed plan depicts multi family 4 Alex residential uses as a transitional use between
the planned multi family apartments to the west and the proposed single-family residential
units in this development. Common area with landscaping and a multi -use pathway is
proposed along the southern boundary providing a transition to planned office/multi-family
uses on the adjacent property to the south.
"A mixed-use project should include at least three types of land uses [i.e. commercial
(includes retail, restaurants, etc.), office, residential, civic (includes public open space, parks,
entertainment venues, etc.), and industrial]. Exceptions may be granted for smaller sites on a
case-by-case basis."
The proposed development plan only includes one land use type (i.e. residential); however,
three different types of residential units are proposed (i.e. single-family detached/attached
and multi family 4 Alex units). The concept plan submitted for the off-site MU -R designated
area to the south depicts a mix of land use types as desired (i.e. office, multi family,
commercial, retail). Because the adjacent mixed use designated area to the east does not
allow new residential uses, Staff is of the opinion all residential uses on this site is
appropriate in order to serve the future commercial/office%mployment uses.
• "Community -serving facilities such as hospitals, churches, schools, parks, daycares, civic
buildings, or public safety facilities are expected in larger mixed-use developments."
This is a relatively small portion of the overall mixed use designated area; none of these
types of uses are proposed on this site. However, they may be in the future on the adjacent
larger portions of the mixed use area.
"Supportive and proportional public and/or quasi -public spaces and places including but not
limited to parks, plazas, outdoor gathering areas, open space, libraries, and schools are
expected; outdoor seating areas at restaurants do not count."
The proposed plan does not incorporate public and/or quasi public spaces and places; the
common area proposed in the residential development is owned by the Homeowner's
Association and does not satisfy this requirement. These types of public spaces should be
included in the adjacent mixed use designated area when it develops.
"All mixed-use projects should be directly accessible to neighborhoods within the section by
both vehicles and pedestrians."
The only neighborhood that would be directly accessible to the proposed development is the
future multi family development to the west. A couple of pedestrian connections are proposed
but no vehicular connections are proposed. In order to comply with this guideline, a
vehicular connection should be provided
• "Street sections consistent with the Ada County Highway District Master Street Map are
required within the Unified Development Code."
Page 11
Meridian City Council Meeting Agenda October 22, 2019 — Page 185 of 793
The Master Street Map depicts a north/south collector street through and along the west
boundary of this site providing access to W. Harris St. and W. Amity Rd and the traffic
signals (planned and existing) at the SH -69 intersections of those streets. The proposed
plan does not depict a continuous collector street as planned and therefore is not in
compliance with the MSM and UDC 11 -6C -3B.1, which requires arterial and collector
streets as shown on the Comprehensive Plan to be dedicated to the public in all cases.
However, because the developmentplan has changed for this area, the collector street may
not be needed.
"Because of the existing small lots within Old Town, development is not subject to the
Mixed -Use standards listed herein."
The proposed development is not within Old Town; therefore, this provision is not applicable.
In reviewing development applications, the following items will be considered in MU -R
areas, per the Comprehensive Plan (pg. 30):
• "Development should comply with the general guidelines for development in all Mixed -Use
areas."
See analysis above.
• "Residential uses should comprise a minimum of 10% of the development area at densities
ranging from 6 to 40 units/acre."
The proposed residential uses on this site comprise approximately 55% of the overall MU -R
area at a density of 6.73 units per acre in accord with this guideline.
• "Retail commercial uses should comprise a maximum of 50% of the development area."
No retail commercial uses are proposed with this development; however, the remainder of
the area to the south consists of approximately 45% of the overall MU -R area and is planned
to develop with a mix of commercial, retail, and office uses in accord with this standard.
• "There is neither a minimum nor a maximum imposed on non -retail commercial uses such as
office, clean industry, or entertainment uses."
No commercial uses are proposed with this development.
Zoning:
Based on the analysis above, Staff is of the opinion the requested annexation with the R-15
zoning district and proposed development is generally consistent with the MU -R FLUM
designation for this site and is appropriate for this site.
The proposed annexation area is contiguous to City annexed property to the north and west and is
within the Area of City Impact Boundary. A legal description for the annexation area is included
in Section VII.A.
The City may require a development agreement (DA) in conjunction with an annexation pursuant
to Idaho Code section 67-6511A. In order to ensure the site develops as proposed with this
application, staff recommends a DA as a provision of annexation with the provisions
included in Section VIII.
B. PRELIMINARY PLAT
Boundary of the Plat:
The proposed boundary of the plat is not consistent with the existing boundary of the site.
The Applicant intends to apply for a property boundary adjustment in the County prior to
annexation ordinance approval by City Council if the subject application is approved. Final
Page 12
Meridian City Council Meeting Agenda October 22, 2019 — Page 186 of 793
approval of the property boundary adjustment will need to be obtained prior to annexation
ordinance approval.
Existing Structures/Site Improvements:
There is an existing home and accessory structures on this site that is unoccupied. These
structures are required to be removed prior to signature on the final plat by the City
Engineer.
Proposed Use Analysis:
The proposed single-family dwellings (attached & detached) are listed as a principal permitted
use; and the multi -family development is listed as a conditional use in the R-15 zoning district per
UDC Table 11-2A-2. Multi -family developments are subject to the specific use standards listed in
UDC 11-4-3-27; compliance with these standards will be evaluated in the future through the
conditional use permit process.
Dimensional Standards (UDC 11-2):
The proposed plat and subsequent development is required to comply with the minimum
dimensional standards listed in UDC Table 11-2A-7 for the R-15 district (see below). The front
lot dimension is missing on lots in Block 1 and should be included on a revised plat.
TABLE 11-2A-7
DIMENSIONAL STANDARDS FOR THE R-15 DISTRICT
Notes:.
1 _ Measured from back of sidewalk or property line where there is no adjacent sidewalk.
2. A reduction to the width of the buffer may be requested as set forth in subsection 11 -3B -7C1 c of this title.
Page 13
Meridian City Council Meeting Agenda October 22, 2019 — Page 187 of 793
R-15 Standard
Requirement
Minimum property size/dwelling unit (in square feet)
2,000
Minimum street frontage (in feet)
Street setback1 to garage (in feet):
Local
20
Collector
25
Alley
55
Street setback1 to living area (in feet):
Local
10
Collector
20
Alley
Interior side setback (in feet)
Rear setback (in feet)
12
Street landscape bufferz (in feet):
FCollector
20
Arterial
25
Entryway corridor
35
Interstate
50
Maximum building height (in feet)
40
Notes:.
1 _ Measured from back of sidewalk or property line where there is no adjacent sidewalk.
2. A reduction to the width of the buffer may be requested as set forth in subsection 11 -3B -7C1 c of this title.
Page 13
Meridian City Council Meeting Agenda October 22, 2019 — Page 187 of 793
Phasing Plan:
The subdivision is proposed to develop in 5 phases. The I't phase is dependent upon a Variance
being approved by Council for access via SH -69, the second phase will have access via W. Harris
St. followed by the 3rd phase at the corner of Harris/SH-69, and 4t' phase directly west of phase 1;
the 5th phase will be the multi -family development. Because the UDC prohibits access via SH -69,
Staff recommends the phasing plan is revised to reflect the first phase of development adjacent to
Harris St. for access purposes; if Council approves the requested Variance, the phasing plan does
not need to be revised.
Per the Applicant's narrative, the following improvements are proposed with each phase:
Phase 1: The SH -69/S. Meridian Rd. roadway improvements, 10 -foot wide multi -use
pathway and street buffer landscaping along the full length of the project boundary along SH -
69/S. Meridian Rd.
Phase 2: The W. Harris St. roadway improvements including curb, gutter and detached
sidewalk and street buffer landscaping along the full length of the project boundary along W.
Harris St.; and installation of the traffic signal at the W. Harris St./SH-69 intersection.
Prior to issuance of any Certificates of Occupancy in each of these phases the associated
improvements as proposed by the Appliant should be complete. If Council doesn't approve
the mor access via SH -69, the Harris St. improvements, including the traffic signal
at Harris/SH-69, should be completed with the first phase of development.
Access (UDC 11-3A-3. 11-3H-4)/Streets:
One full access is proposed via W. Harris St., a collector street; one full access is proposed via
SH -69, a state highway (although ITD has only tentatively approved a right-in/right-out/left-in
access); and a stub street is proposed to the south for future extension. The access via SH -69 is
prohibited per UDC 11 -3H -4B; (if the access isn't
approved, it should be removed from the plat and a secondary emergency access provided in
accord with IFC requirements).
Improvements are required to Harris St. per the ACHD report; and SH -69 per ITD's letter to the
City (see Section VIII).
ACHD is requiring bulb -outs to be constructed to reduce traffic speed and enhance pedestrian
safety at crossings where internal pathways intersect the street on Radiant Ridge Dr., W. Hydman
St. and at the intersection of Springfield Ave. and Broyhill St.
Common Driveways (UDC 11-6C-3)
All common driveways are required to comply with the standards listed in UDC 11 -6C -3D.
Several common driveways are proposed that comply with UDC standards. Common driveways
should be a maximum of 150' in length or less, unless otherwise approved by the Fire Dept.
An exhibit is required to be submitted with the final plat application that depicts the
setbacks, fencing, building envelope and orientation of the lots and structures. Driveways
for abutting properties that aren't taking access from the common driveway(s) should be
depicted on the opposite side of the shared property line away from the common driveway.
Solid fencing adjacent to common driveways is prohibited unless separated by a minimum
5 -foot wide landscaped buffer.
A perpetual ingress/egress easement for the common driveway(s) is required to be filed with
the Ada County Recorder, which shall include a requirement for maintenance of a paved
surface capable of supporting fire vehicles and equipment. A copy of the easement should
be submitted to the Planning Division prior to signature on the final plat.
Page 14
Meridian City Council Meeting Agenda October 22, 2019 — Page 188 of 793
Parking (UDC 11-30):
Parking for single-family detached/attached and multi -family dwellings is required based on the
number of bedrooms per unit. For 2-, 3- or 4 -bedroom single-family units, a minimum of 4 spaces
are required per unit with at least 2 of those in an enclosed garage, the other spaces may be
enclosed or a minimum 10' x 20' parking pad.
Because of the narrow lots (i.e. 32'+) for detached homes and associated driveways, there is not
adequate room for on -street parking in front of those lots for guest parking and in some areas
parking is quite a ways away. Where attached homes are proposed, there is room for
approximately one space per every 2 lots for on -street parking. On -street parking is also available
adjacent to common lots. The Applicant has submitted an exhibit included in Section VII.E that
demonstrates available on -street parking for the development which amounts to 109+/- spaces
available for guest parking (note: parking on the 27' wide street section adjacent to Lot 12, Block
2 can only be accommodated on one side per Fire Department standards).
For a 1 -bedroom multi -family unit, a minimum of 1.5 spaces per unit with an least 1 space in a
covered carport or garage; for 2- or 3 -bedroom multi -family units, a minimum of 2 spaces per
unit are required with at least 1 in a covered carport or garage. For greater number of bedrooms,
see UDC Table 11-3C-6 for more information.
Pathways (UDC 11-3A-8):
Pathways (micro -pathways and multi -use pathways) are required to be constructed in accord with
the standards listed in UDC 11-3A-8 with landscaping on either side of the pathway(s) in accord
with the standards listed in UDC 11 -3B -12C.
Several micro -pathways are proposed for pedestrian circulation within the development. A
segment of the City's multi -use pathway is proposed within the Northwest Pipeline corridor
across the southwest corner of the site in accord with the Pathways Master Plan; and within the
street buffer along SH -69 in accord with UDC 11 -3H -4C.3. Landscaping is required to be
installed along these pathways as set forth in UDC 11-313-12C. A public use easement is
required for the multi -use pathways; coordinate the details of the easement with Kim
Warren, Park's Department (208-888-3579).
Sidewalks (UDC 11-3A-1 :
Sidewalks are required to be constructed adjacent to public streets as set forth in UDC 11-3A-17.
Minimum 5 -foot wide detached sidewalks are required along all collector and arterial streets; and
minimum 5 -foot wide attached (or detached) sidewalks are required along local streets as
proposed.
Parkways (UDC 11-3A-17):
Parkways are required to be constructed and landscaped per the standards listed in UDC 11 -3A -
17E. Eight -foot wide parkways are proposed along collector streets and along certain local street
sections within the development in accord with UDC standards.
Landscaping (UDC 11-3B):
Street buffer landscaping is required to be provided within common lots in accord with the
standards listed in UDC 11 -3B -7C. Per UDC Table 11-2A-7, a 20 -foot wide buffer is required
adjacent to collector streets; a 35 -foot wide buffer is required adjacent to SH -69, an entryway
corridor; and no buffer is required along local streets. The landscape plan depicts the gravel
symbol within the street buffer along SH -69 and Harris St. where vegetative groundcover is
required; the symbol should be changed to grass.
Qualified Open Space (UDC 11-3G):
A minimum of 10% (3.57 acres) qualified open space is required to be provided within the
development per the standards listed in UDC 11 -3G -3B. A qualified open space exhibit was
Page 15
Meridian City Council Meeting Agenda October 22, 2019 — Page 189 of 793
submitted as shown in Section VILD that depicts 5.43 acres (or 15.2%) of open space; however,
there are several areas counted that Staff finds do not meet the requirements for qualified open
space and other space that is marginal (i.e. the landscaped area on Lot 30, Block 4 that is below
the dimensions of 50' x 100'; and the area at the northeast corner of the site where the topography
of the land slopes significantly down from the building lots toward the SH-69/Harris intersection
and although is accessible by all residents, will not likely provide much of a benefit to
homeowners. Staff requests a revised exhibit is submitted excluding certain non-qualified
areas as detailed in Section VILD prior to the Commission hearing to determine accurate
qualified open space calculations.
Qualified Site Amenities (UDC I1 -3G):
A minimum of (2) qualified site amenities are required to be provided for this development based
on the size of the development (i.e. 35.67 acres). The Applicant proposes a segment of the City's
multi -use pathway system within the Northwest Pipeline corridor at the southwest corner of the
site; a multi -use pathway within the street buffer along SH -69; a centrally located half -acre park
with children's play structures consisting of a 24' x 36' play structure, swings, climbing dome,
rock climbing boulders, basketball court, big wheel track, and seating area with 4' tall wrought
iron fencing with a gated entry surrounding the park for children's safety; and a dog park for
small dogs with seating areas. The proposed amenities comply with and exceed the minimum
standards. In order for the dog park to count as a "qualified" site amenity, it needs to
comply with the standards listed in UDC 11-3G-3C.lh which require a dog washing station
with drain to sanitary sewer system and trash receptacles and bags for dog waste disposal.
Waterways (UDC 11-3A-6):
The Carlson Lateral runs along the western boundary of this site and has been piped. An
irrigation ditch crosses the northeast corner of this site and if open, should be piped in
accord with UDC standards.
Northwest Gas Pipeline:
The Northwest gas pipeline runs across the southwest corner of this site witin a 75 -foot wide
easement contained in Lot 15, Block 3. All development within this easement should comply
with the Williams Pipeline Developer's Handbook.
Fencing (UDC I1 -3A -6,11-3A-7):
All fencing constructed on the site is required to comply with the standards listed in UDC 11-3A-
7. A mix of 6 -foot tall solid vinyl privacy fencing and 4 -foot tall black iron fence is proposed.
The developer is required to construct fencing abutting pathways and common open space
lots to distinguish common from private areas. Fences abutting all pathways and common
open space lots not entirely visible from a public street are required to be an open vision or
semi -private fence up to 6' in height; or 4' in height if closed vision fencing is used (an
additional 2' of open vision fencing may be provided at the top section of the fence). In
accord with these standards, fencing adjacent to Lot 15, Block 3 should be revised; fencing
should be added on Lot 23, Block 1 and at the rear of building lots adjacent to Lot 1, Block
1 on lots adjacent to Solaris Ave. and Lyra St. and Harris St.; and the beginning and end
points of the 6' concrete fence should be clearly delineated.
Because this site is adjacent to SH -69, the UDC requires noise abatement to be provided for
residential uses in the form of a berm or berm and wall combination a minimum of 10 feet higher
than the elevation at the centerline of the state highway parallel to the state highway per the
standards listed in UDC 11-3H-41). A 6 -foot tall concrete fence on top of a 4 -foot tall berm is
proposed; a detail of the berm and wall combination should be submitted with the first
phase final plat application that depicts the centerline of SH -69.
Page 16
Meridian City Council Meeting Agenda October 22, 2019 — Page 190 of 793
Utilities (UDC 11-3A-21):
Connection to City water and sewer services is proposed. Street lighting is required to be installed
in accord with the City's adopted standards, specifications and ordinances.
See Section VIII -B below for Public Works comments/conditions.
Pressurized Irrigation System (UDC 11-3A-1 :
An underground pressurized irrigation system is required to be provided for each lot within the
development.
Storm Drainage (UDC 11-3A-18:
An adequate storm drainage system is required in all developments in accord with the City's
adopted standards, specifications and ordinances. Design and construction shall follow best
management practice as adopted by the City as set forth in UDC 11-3A-18.
Building Elevations (UDC 11-3A-19 I Architectural Standards Manual):
Conceptual building elevations and photos were submitted for the proposed single-family
attached and detached units and the multi -family structures as shown in Section VII.F. Building
materials for the single-family homes consist of a mix of siding (horizontal and vertical lap siding
and board & batten) with stone veneer accents. Building materials for the multi -family structures
consist of horizontal and vertical siding with board and batten accents (see Exhibit F in Section
VII.)
The single-family attached and multi -family structures are required to comply with the design
standards in the Architectural Standards Manual; single-family detached structures are exempt
from this requirement.
Structures adjacent to W. Harris St. and SH -69 are proposed to all be a single -story in height
except for those on Lots 60 and 62, Block 1 which will be 2 -stories in height. To avoid
monotonous wall planes, the rear of structures visible from Harris St. and SH -69 should have
varied setbacks.
Page 17
Meridian City Council Meeting Agenda October 22, 2019 — Page 191 of 793
11111i
WIN Im
Page 17
Meridian City Council Meeting Agenda October 22, 2019 — Page 191 of 793
VI. DECISION
A. Staff:
Staff recommends approval of the proposed Annexation & Zoning and Preliminary Plat as it
complies with the mininimum UDC standards with the conditions included in Section VIILA per
the Findings in Section IX; and Eleni,,' of the p oa V afi nee Fe"est per the Findings in
Section IX.
B. Commission:
The Meridian Planning & Zoning Commission heard these items on January 17 and
February 21, 2019. At the public hearing on February 21St, the Commission moved to
recommend approval of the subject AZ and PP requests.
a. Summary of Commission Public Hearing:
i. In favor: Deb Nelson; Ronnie Wilks; Debbie Jeske; Dennis Green; Brandon
Whallon, Hawkins Companies; Andrew Newland; Randy Nelson; Will Dilmore;
Brittany Elliott; Carol Daily.
ii. In opposition: None
iii. Commenting: None
iv. Written testimony: Kimberly Porter, Evan & Analyn Frasure, Sandy & Randy
Nelson, Will Dilmore
v. Staff presenting application: Sonya Allen
vi. Other staff commenting on application: Bill Parsons
b. Key issue(s) of Public Testimony:
L Comments from happy homebuyers in other developments by the same
Applicant/builder;
iii. Need for housing options in the price point offered by this Developer.
c. Key Issues of Discussion by Commission:
L Timing for installation of a traffic signal at the Harris St./SH-69 intersection;
ii. Previous ITD approved accesses for the site via S. Meridian Rd./SH-69;
iii. The proposed variance for access via SH -69;
iv. The provision of a local stub street to the property to the west planned for multi-
family development as recommended by Staff and required by UDC 11-3A-3 (unless
otherwise waived by Council);
v. Revisions to the phasing plan if access via SH -69 isn't approved.
Page 18
Meridian City Council Meeting Agenda October 22, 2019 — Page 192 of 793
IN
a
-
-
VI. DECISION
A. Staff:
Staff recommends approval of the proposed Annexation & Zoning and Preliminary Plat as it
complies with the mininimum UDC standards with the conditions included in Section VIILA per
the Findings in Section IX; and Eleni,,' of the p oa V afi nee Fe"est per the Findings in
Section IX.
B. Commission:
The Meridian Planning & Zoning Commission heard these items on January 17 and
February 21, 2019. At the public hearing on February 21St, the Commission moved to
recommend approval of the subject AZ and PP requests.
a. Summary of Commission Public Hearing:
i. In favor: Deb Nelson; Ronnie Wilks; Debbie Jeske; Dennis Green; Brandon
Whallon, Hawkins Companies; Andrew Newland; Randy Nelson; Will Dilmore;
Brittany Elliott; Carol Daily.
ii. In opposition: None
iii. Commenting: None
iv. Written testimony: Kimberly Porter, Evan & Analyn Frasure, Sandy & Randy
Nelson, Will Dilmore
v. Staff presenting application: Sonya Allen
vi. Other staff commenting on application: Bill Parsons
b. Key issue(s) of Public Testimony:
L Comments from happy homebuyers in other developments by the same
Applicant/builder;
iii. Need for housing options in the price point offered by this Developer.
c. Key Issues of Discussion by Commission:
L Timing for installation of a traffic signal at the Harris St./SH-69 intersection;
ii. Previous ITD approved accesses for the site via S. Meridian Rd./SH-69;
iii. The proposed variance for access via SH -69;
iv. The provision of a local stub street to the property to the west planned for multi-
family development as recommended by Staff and required by UDC 11-3A-3 (unless
otherwise waived by Council);
v. Revisions to the phasing plan if access via SH -69 isn't approved.
Page 18
Meridian City Council Meeting Agenda October 22, 2019 — Page 192 of 793
vi. Fire Department's requirement for curbs to be painted red in addition to No Parking
signs installed where parking is only allowed on one side of the street.
d. Commission Change(s) to Staff Recommendation:
i. Strike the last sentence of condition #A.le in Section VIII, which requires the rear of
structures visible from Harris St. & SH -69 to have varied setbacks to avoid
monotonous wall planes;
ii. The Commission directed the Applicant to work with the Fire Dept. on whether or
not curbs need to be painted red in addition to No Parking signs being installed
where parking is only allowed on one side of the street. The Fire Dept. has changed
the requirement to only require No Parking signs and not curb paint (see Section
VIILA.9).
L. Outstanding Issue(s) for City Council:
The Applicant recluests ., [7.,r;.,nce to UDC 11 3H 4B which prohibits aecess via S14
69 to be allowed one /11 aeeess via S14 69 .,t th., 7/ ...;1..
ii Staff recommends conditions #A.2e and A.3g in Section VIII are amended to require
a local street connection (rather than just a vehicular connection) to the future multi-
family development/property to the west in accord with UDC 11-3A-3 unless
otherwise waived by City Council. (UDC 11-3A-3 states. "All subdivisions must provide
local street access to any use that currently takes direct access from an arterial or
collector street. ")
The Meridian City Council heard these items on May 7, 2019. At the public hearing. the
Council approved the subject AZ and PP requests and vacated the VAR request.
11 -3H -3 -
HL Strike the portion of condition #A.ld in Section VIII that requires the traffic signal
at W. Harris St./SH-69 to be installed with the second phase of development.
Page 19
Meridian City Council Meeting Agenda October 22, 2019 — Page 193 of 793
Summary of City Council Public
Hearing:
L
In favor: Deb Nelson, Givens
Purslev: Will
Dilmore (also representing
others in favor
as follows: Dennis Green,
Debbie
Jeske,
Ronnie Winks. and Randy Nelson);
Brandon
hallon. Hawkins Companies:
ii,
In opposition: None
iii.
Commenting,: Denise LaFever
iy-
Written testimony: None
Staff presenting application:
Sonya Alle
vi.
Other staff commenting
on application:
Joe Bongiorno
b.
Key
issue(s) of Public Testimony:
L
None
KevIssues
of Discussion by
Council:
i.
Provision of a local street
connection to
the property to the west:
ii,
Timing for construction
of the
traffic signal
at the intersection of Harris
St. & SH -
iii.
69 and associated safety
Anticipated future land
concerns:
uses
on the property
to the south.
dL
Key
Council Changes to Commission
Recommendation
L
City Council approved
a waiver
to UDC
11 -3A -3A.3 to not require
a local street
connection to the property
to the west
that only has access via a collector
street -
modifv condition #A.2e
and
#A.3g in
Section VIII to only require
an emergency
ii.,
vehicular connection to
City Council approved a
the
modification
west:
to UDC 11 -3H -4B.2 and vacated
the Variance
r guest due to ITD's approval
of the proposed
access via SH -69 jn accord
with UDC
11 -3H -3 -
HL Strike the portion of condition #A.ld in Section VIII that requires the traffic signal
at W. Harris St./SH-69 to be installed with the second phase of development.
Page 19
Meridian City Council Meeting Agenda October 22, 2019 — Page 193 of 793
VII. EXHIBITS
A. Annexation & Zoning Legal Description and Exhibit Map
aawtooth Land 5urvcyinq, LLC
°✓ 2030 S. 4Ms5hsigtem +M1:uc. 10'44 Narthw&g Stud., 51: c; 141 J" :Amur- r-a9t
Emmett, 10 &2(3 fi 7 Coeur al'Alana, 10 535 14 1�sromB, 1[) 83338
P. (2= 398-8104 i': �, 6) 714-4544 P: (2081329-5303
F: (?0,5) 398 F, (20D) 292-4453 F: (205)324-362r
August 27, 2018
Annexation Description
The BASIS OF BEARINGS for this description is North 0'3248 East from an illegible
alurninum cap marking the Southeast corner of Section 25 and an illegible aluminum cap
marking the East 114 corner cf Section 25, both in T. 3 N,, R. 1 WSJ,, B.M., oda County, Idaho.
A parcel of land being a portion of the SEI/4 of Section 25, T. 3 N., R. I W., Ada County,
Idaho more particularly described as follows;
BEGINNING at an illegihlp. ali9minirrn rap marking the Fast 1/4 corner of Sectbn 25;
Thence South 0032'48°' West, coincident with said east line of the SE 1/4 of Section 25, a
distance of 1384,69 feet;
Thence leaving said east line of the .SE1 f 4 of SeckiGn 25, North 89027'12" West;, 238.27 feet to
the beginning of a tangent curve to the left;
Thence 88,88 feet coincident with the arc of said curve, having a centlraI angle of 16115E+3m"r
having a radius of 300.00 feet, subtended by a chard which bears, Sam 82003'33" West,
88.56 feet to the beginning of a reverse curse;
Thence 89.63 feet coincident wlth the arc of said curve, having a central angle of 17°07'04", a
radius of 300.00 feet, subtended by a chord which bears South 82007'50" West, 89.30 feet,
Thence North 81418313" West, 144,01 feet;
Thence North 0113.2'48" East, ,parallel with said east line of the SE1/4 of Section 25, a distance
of 79.82 to the south line of the NE1}4 of the SE 1/4;
Thence North 89°17'55" West, coincident with said south lime of the NEI/4 of the SEL/4, a
distance of 354.02 feet;
Thence North 50°3845" West, 232.30 feet, -
Thence North 6037"00" East, 605.78 feet to a 1/2" rebar with no cap,
Thence North 581150'44" West, 529,17 feet to a 112° rebar with no cap;
P:12Q18U8154-CMC STAPLE'fOrfigLi vey�priawirrgsl)�escrlptlons318154 ANNEX.docx
Page 11
Page 20
Meridian City Council Meeting Agenda October 22, 2019 — Page 194 of 793
Them North 36°4743" West, 352.23 Feet to said north line of the SE1/4 of Section 25,
Thence South 89°24'05" East, coincident with said north line of the SEI/4 of Section 25, a
distance of 403.18 feet to a 5/8„ rebar, PLS 11118 marking the CEI/16 corner of said
Section 25;
Thence South 89°29'?,1"East, coincident with said north line of the SE 1/4 of :Section 25+ a
distence of 1320.16 to the POINT OF BEGINNING.
The above described parcel contains 38.15 acres, more or less.
P,y201&8154-CMG STAPIL ETON%Sv rveyQravvings0cscdpdions418154 ANNEX. dacx
Page 12
Page 21
Meridian City Council Meeting Agenda October 22, 2019 — Page 195 of 793
C 114 CcRNEF S 89°24479" E 1320,60'
N 00"3249' E NB9°2P12` W
SEil10N 23
nrw-mrr=Cpp S .8 W HARRrSST. 589°14VP E_
S89`2321'F 1320.16'
P.0.6.
E114 CORNER
-- _ — — —"T...
— —
_ _ _
_ IL
LEVE 5
CF 1/16 : aymR
30
NTS
ILLEGIBLE
2 SECTION 25
`c RS 11118
RrRtVELVAHe
2030 S. WASHINGTON AVE
�
GMC
EMMETT, I0 83617
18154 -IX
�
P: (208 398-8104
x
NO CAP
I8154
I FL --
1OFI
08/27/18
Q
e
NO CAP
I vi
ANNEXATION PARCEL
v
k
38.15 AC :k
r
�r
ps
as
I ay
o Vi
PRGUR T:
STAPLETON ANNEXATION
EXHIS17
SEC. 25, T.3N., R.4Vv', B.M.,
AOA COUNTY, IDAHO
Page 22
79.82' 238.2T
N 00"3249' E NB9°2P12` W
N X1898• w
144.x1•
ry
AM1.ry R02s
---
30
NTS
36131
RrRtVELVAHe
2030 S. WASHINGTON AVE
�
GMC
EMMETT, I0 83617
18154 -IX
RRa=,*
P: (208 398-8104
{208j398-8105
I8154
�5u eylgLLG WWW.SAWTOOTHLS.COM
1OFI
08/27/18
Meridian City Council Meeting Agenda October 22, 2019 — Page 196 of 793
B. Preliminary Plat (date: 1/29/2019) & Phasing Plan
PRELIMINARY PLAT FOR
STAPLETON SUBDIVISION
LOcn•FE3r1 133E NE114CFFHEsEI/40-0 2s
101VNSHIP 3 NON1H, NRNCE i war, e.N.
MFR4QIRN, ADR COUNtt, IDAHO
2o1a
SNEU INM LEGEND
�xX I f
4 ly
6i �N
- - I
�'�Nmnr,zw
33' ttPICAL SFRE_R SECTION
Page 23
Meridian City Council Meeting Agenda October 22, 2019 — Page 197 of 793
VaKS]
LOT61 1LOT 51 T PICALHCTIONP
SFREEFSEGFION AT ENTRANCE
�xX I f
4 ly
6i �N
- - I
�'�Nmnr,zw
33' ttPICAL SFRE_R SECTION
Page 23
Meridian City Council Meeting Agenda October 22, 2019 — Page 197 of 793
VaKS]
g� J_
Shp r
` �:
Jo
JA
4
@ dio
0
MATCHLI NESSE S HEFT PPI 2 1 it J
¢=s
r LI'
MATCHHNE SEE SHEET PPl 1 4
§�=°R..
vs�6'l,�
Page 24
Meridian City Council Meeting Agenda October 22, 2019 — Page 198 of 793
PP1.1
u - y
JW6
YFQ �
umi $a ppe
PP1-2
C. Landscape Plan (date: 1/29/2019)
PI°VVL-OPMtNT DATA
==NNW
IMENSE
F ���mmmmmm ��� �,�
��mm 't d
Page 25
PLANT FAI-=r�
MIA --
M
\107r=S
Z
LANnSCAFE CALGULATI ONS
M=1
JANUARY 29, 2019 JEWENBELTS
Meridian City Council Meeting Agenda October 22, 2019 — Page 199 of 793
C`iE1/C[-0FMENT DATA
STAPLETON SUBDIVISION
fp�J, jANun x z9, xo l9 E E 6d h6
MERIDIAN, IDAHO PRELIMINARY PLAT LANDSCAPE PLAN„
c
J
��`'e� 6LOC14
�f
PANT PALO-TTE
KEY MAP
- _ .0:1
_J
' M TCHLINE LS 11111-7
Page 26
Meridian City Council Meeting Agenda October 22, 2019 — Page 200 of 793
J E 6Ti
Z z
O a
a
w
� U
Lo Z
: a
Z a
O a
W aJ
L IT z
Q w
w
CC
LANUS�GAPE
Ll
PLAN
�� /BLOCK ,
I"I .<M1i PALETTE
-4jj_
!
I � T
iii
iXw
yra
Tri
I _ i
I �
I 1 ;MATGWLINE L2 '1 BLOCB
�!�
MAT -INE LS
MATCHLINE LI I
MATCHLPNE L2
Page 27
®'
P4,�M1r F' wl I I I f=.
i
0 Z z
Q d
J
a
❑W
NOTES
m0
Z ~
d
4111— a
W a
J CL Z
Q j
F w
KEY MAP (n 3
L1z 9
f, ill LANDSCAPE
t PUN
4
L2
KEY MAP
o
Meridian City Council Meeting Agenda October 22, 2019 — Page 201 of 793
f9
Z z
fl_ d
a
N_ W
> a
❑ w
m Z
N
J
Z
O a
H }
W a
J Z
a �
Q J
F W
d
C
LANU9CpPE
PLAN
L3
I"I .<M1i PALETTE
iii
iXw
yra
Tri
KEY MAP
o
Meridian City Council Meeting Agenda October 22, 2019 — Page 201 of 793
f9
Z z
fl_ d
a
N_ W
> a
❑ w
m Z
N
J
Z
O a
H }
W a
J Z
a �
Q J
F W
d
C
LANU9CpPE
PLAN
L3
I If - I I -''IHT IN6
IRON FENCE
c�%c-REqE N.JI,L 'I II11111TIVLL
PLANTER CJT BED LD r=
Hlir (A MERIDIAN PD D) LING''C./,IIL LILIH-Lk
Page 28
LAN175r,Af'F- rALCULATIONS
Z;15-VEL01"Mr-NT DATA
Meridian City Council Meeting Agenda October 22, 2019 — Page 202 of 793
A"
'qa
z
0
CO)
m
D
co
z
0
I --
LU
—i
CL
C0
LANDSCAPE'
PLAN
D. Qualified Open Space Exhibit Revised & Site Amenities
Page 29
Meridian City Council Meeting Agenda October 22, 2019 — Page 203 of 793
STAPLETON SUBDIVISION
OPEN SPACE EXHIBIT
S€TE AREA =±35 67 ACRES
- uurnc rxx =ass �c Iia.eA.l
Propo-sed Amon-rtiiE�s:
c. Large Half -Acre Park -The half -acre park
wiII contaln the followinlg recreatlon
facilities:
- Enclosed Fencing for Child Safety
- Basketball court
- Playstructures
Swings
ClIrnbing Rocks and a borne Structure
Rig Whf4 Track
Scenic: viewing area wf bench seating
Attractive landscaping and pedestrian
pathways
o Drag Park
Fully Fenced
Double Protection Gate
Seating Areas
D,M,5UreAtt
COURT
35
z4",C 3' PGhj'
STRUCTURE —
CUTAOIWG
DOME
o Pathway - A 10' regional pathway will be provided at the
southwest corner of the project area. Th s pathway will
connect to proposed pathways in other previously
approved developments to the west, And will provide a
regional connection the retail and commercial components
of the Mixed-use Development. Along Meridian 'Road
nearly 1,2DO If of 10' Regional Pathway will also be
provided the full length of the project from Harris Street to
the southern boundary of the project.
Page 30
4' IRP H
FUGLOSEE)
FENCE
RK Fr,K
D176EY
ROCK ILIMDER
DOULVER15
Meridian City Council Meeting Agenda October 22, 2019 — Page 204 of 793
E. On -Street Parking Exhibit
Page 31
Meridian City Council Meeting Agenda October 22, 2019 — Page 205 of 793
F. Conceptual Building Elevations (Single -Family Attached/Detached and Multi -Family)
6�1� •iA
Page 32
Meridian City Council Meeting Agenda October 22, 2019 — Page 206 of 793
zc% -
G. Conceptual Development Plan for Off -Site Portion of MU -R Designated Area
Mixed Use Regional
Bubble Diagram"
Regional Pathway
(T
Harris Street
.. II
4
Multi -Family
28 Units
Stapleton Neighborhood
R-15 Zone
212 Single Family Hames
V
i
Office.,multi-Family \�
Residential - 120 to 140,
\ Not A Fort
units
\
1
1
s 1
r �
Hawkins Company Properties-.
i�
?�
Parking Area
Office'Fletail
13.000 5gft
Retail
- --- � 3-500 sgft�" _ 1
Amity Road
Page 34
Meridian City Council Meeting Agenda October 22, 2019 — Page 208 of 793
A. PLANNING DIVISION
Prior to annexation ordinance approval, the Applicant shall obtain final approval of a
property boundary adjustment in Ada County and submit a copy of the associated
recorded Record of Survey that coincides with the boundary of the preliminary plat.
A Development Agreement (DA) is required as a provision of annexation of this property.
Prior to approval of the annexation ordinance, a DA shall be entered into between the City of
Meridian, the property owner(s) at the time of annexation ordinance adoption, and the
developer.
Currently, a fee of $303.00 shall be paid by the Applicant to the Planning Division
prior to commencement of the DA. The DA shall be signed by the property owner
and returned to the Planning Division within six (6) months of the City Council
granting the annexation. The DA shall, at minimum, incorporate the following
provisions:
a. Future development of this site shall be generally consistent with the preliminary plat,
phasing plan, landscape plan and building elevations included in Section VII and the
provisions contained herein.
b. The building lots along the perimeter of the development that are adjacent to W. Harris
St. and SH -69/S. Meridian Rd., except for Lots 60 and 62, Block 1, shall be restricted to a
single -story in height as proposed by the Developer.
c. Prior to issuance of any Certificates of Occupancy within the first phase of development,
the SH -69/S. Meridian Rd. roadway improvements, 10 -foot wide multi -use pathway and
street buffer landscaping shall be constructed along the full length of the project
boundary along SH -69/S. Meridian Rd.
d. Prior to issuance of any Certificates of Occupancy within the second phase of
development, the W. Harris St. roadway improvements including curb, gutter and
detached sidewalk and street buffer landscaping along the full length of the project
boundary along W. Harris St. shall be constructed; a -ad the tFaf e signal at W 14afr4^
St.414 14 69 shall be insta va
e. All single-family attached and multi -family structures shall comply with the design
standards listed in the Architectural Standards Manual. An application for Design Review
shall be submitted and approved for all attached dwellings prior to submittal of building
permit applications. An application for Design Review and Certificate of Zoning
Compliance shall be submitted and approved for all multi -family structures prior to
submittal of building permit applications. To a-vaid m otono s wall planes the r -ear- o
f. Provide an emergencv vehicular connection between this site and the planned multi-
family development to the west for interconnectivity.
g. Site amenities shall be provided within the development per those described in Section
VII.D; comparable amenities as determined by Staff may be considered as substitutions.
h. All development within the Northwest gas pipeline easement shall comply with the
Williams Gas Pipeline Developer's Handbook.
Page 35
Meridian City Council Meeting Agenda October 22, 2019 — Page 209 of 793
i. A Conditional Use Permit is required to be submitted and approved for the multi -family
development prior to application for Certificate of Zoning Compliance and Design
Review.
2. The preliminary plat included in Section VII.B, shall be revised as follows:
a. Include the front lot dimension on lots in Block 1 that is missing.
b. Revise the phasing plan so that the first phase of development is adjacent to Harris
St. for access purposes because access via SH -69 is prohibited per UDC 11 -3H -4B.2.
If Council approves the access, the phasing plan does
not need to be revised.
c. Remove the access via SH -69 as access is prohibited per UDC 11 -3H -4B.2, unless
otherwise approved by City Council.
d. Provide a secondary emergency access that meets Fire Department requirements (IFC
Section D104.3) and remove the access via SH -69 unless Council approves a
Variance for a public street access via SH -69.
e. Depict cv vehicular connection between this site and the planned multi-
family development to the west.
3. The landscape plan included in Section VII.0 shall be revised as follows:
a. Include a symbol for the 6' concrete fence in the legend and the beginning and end
points of the fence along SH -69.
b. Include a detail of the 6 -foot tall concrete fence on top of a 4 -foot tall berm as
proposed along SH -69 that depicts the centerline of SH -69 that demonstrates
compliance with the standards listed in UDC 11 -3H -4D with the first phase final plat
application.
c. Depict fencing adjacent to Lot 15, Block 3 in accord with the standards listed in UDC
11-3A-7A.7b.
d. Depict fencing on Lot 23, Block 1 in accord with the standards listed in UDC 11 -3A -
7A.7.
e. Depict fencing at the rear of building lots adjacent to Lot 1, Block 1 on lots adjacent
to Solaris Ave., Lyra St. and Harris St.
£ Depict landscaping along all pathways per the standards listed in UDC 11 -3B -12C.
g. Depict an emergency vehicular connection between this site and the planned multi-
family development to the west.
h. Depict landscaping along the pathway on Lot 26, Block 3 in accord with the
standards listed in UDC 11 -3B -12C ifthis lot is counted toward the qualified open
space as currently shown on the open space exhibit in Section VII.D.
i. Replace the gravel symbol and replace it with the lawn symbol within the street
buffer along SH -69 in accord with UDC 11-3B-7C.3a.
Page 36
Meridian City Council Meeting Agenda October 22, 2019 — Page 210 of 793
4. A 14 -foot wide public pedestrian easement is required to be submitted to the Planning
Division for the multi -use pathway within the street buffer along SH -69 and within the
Northwest Pipeline corridor prior to City Engineer signature on the final plat for the phase in
which it is located; coordinate the details of the easement with Kim Warren, Park's
Department.
For lots accessed by common driveways, an exhibit is required to be submitted with the final
plat application that depicts the setbacks, fencing, building envelope and orientation of the
lots and structures. Driveways for abutting properties that aren't taking access from the
common driveway(s) should be depicted on the opposite side of the shared property line
away from the common driveway. Solid fencing adjacent to common driveways is prohibited
unless separated by a minimum 5 -foot wide landscaped buffer.
6. Signage for addressing needs to be provided for homes accessed by the common driveways
on Lots 10 & 61, Block 1; Lots 23 & 29, Block 2; and Lot 28, Block 3 for emergency
wayfinding purposes.
7. A perpetual ingress/egress easement is required to be filed with the Ada County Recorder for
all common driveways, which shall include a requirement for maintenance of a paved surface
capable of supporting fire vehicles and equipment. A copy of the recorded easement should
be submitted to the Planning Division prior to signature on the final plat by the City Engineer.
8. All existing structures on the site shall be removed prior to City Engineer signature on the
final plat in which they are located.
9. Parking is restricted to only one side of the 27 -foot wide street section for W. Broyhill St.; the
eu4 shall be -painted red a signage shall be installed prohibiting parking on one side of the
street to ensure emergency access can be provided.
B. PUBLIC WORKS
1. Site Specific Conditions of Approval
1.1 A street light plan will need to be included in the final plat application. Street light plan
requirements are listed in section 6-7 of the City's Design Standards. A copy of the
standards can be found at http://www.meridiancity.orKIpublic_works.aspx?id=272
1.2 Each phase must be modeled as developed to ensure adequate fire flow.
1.3 A water main connection to the west (proposed Graycliff Apartments) is needed, and can
be co -located within a common driveway/pathway. Coordinate design location with the
Meridian Development Analyst during construction plan review.
2 General Conditions of Approval
2.1 Applicant shall coordinate water and sewer main size and routing with the Public Works
Department, and execute standard forms of easements for any mains that are required to
provide service outside of a public right-of-way. Minimum cover over sewer mains is
three feet, if cover from top of pipe to sub -grade is less than three feet than alternate
materials shall be used in conformance of City of Meridian Public Works Departments
Standard Specifications.
2.2 Per Meridian City Code (MCC), the applicant shall be responsible to install sewer and
water mains to and through this development. Applicant may be eligible for a
reimbursement agreement for infrastructure enhancement per MCC 8-6-5.
Page 37
Meridian City Council Meeting Agenda October 22, 2019 — Page 211 of 793
2.3 The applicant shall provide easement(s) for all public water/sewer mains outside of
public right of way (include all water services and hydrants). The easement widths shall
be 20 -feet wide for a single utility, or 30 -feet wide for two. The easements shall not be
dedicated via the plat, but rather dedicated outside the plat process using the City of
Meridian's standard forms. The easement shall be graphically depicted on the plat for
reference purposes. Submit an executed easement (on the form available from Public
Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor,
which must include the area of the easement (marked EXHIBIT A) and an 81/2" x 11"
map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be
sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a
note to the plat referencing this document. All easements must be submitted, reviewed,
and approved prior to development plan approval.
2.4 The City of Meridian requires that pressurized irrigation systems be supplied by a year-
round source of water (MCC 12-13-8.3). The applicant should be required to use any
existing surface or well water for the primary source. If a surface or well source is not
available, a single -point connection to the culinary water system shall be required. If a
single -point connection is utilized, the developer will be responsible for the payment of
assessments for the common areas prior to prior to receiving development plan approval.
2.5 All existing structures that are required to be removed shall be prior to signature on the
final plat by the City Engineer. Any structures that are allowed to remain shall be subject
to evaluation and possible reassignment of street addressing to be in compliance with
MCC.
2.6 All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways,
intersecting, crossing or laying adjacent and contiguous to the area being subdivided shall
be addressed per UDC 11-3A-6. In performing such work, the applicant shall comply
with Idaho Code 42-1207 and any other applicable law or regulation.
2.7 Any existing domestic well system within this project shall be removed from domestic
service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian
Engineering Department at (208)898-5500 for inspections of disconnection of services.
Wells may be used for non-domestic purposes such as landscape irrigation if approved by
Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190.
2.8 Any existing septic systems within this project shall be removed from service per City
Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment
procedures and inspections (208)375-5211.
2.9 Street signs are to be in place, sanitary sewer and water system shall be approved and
activated, road base approved by the Ada County Highway District and the Final Plat for
this subdivision shall be recorded, prior to applying for building permits.
2.10 A letter of credit or cash surety in the amount of 110% will be required for all
uncompleted fencing, landscaping, amenities, etc., prior to signature on the final plat.
2.11 All improvements related to public life, safety and health shall be completed prior to
occupancy of the structures. Where approved by the City Engineer, an owner may post a
performance surety for such improvements in order to obtain City Engineer signature on
the final plat as set forth in UDC 11 -5C -3B.
2.12 Applicant shall be required to pay Public Works development plan review, and
construction inspection fees, as determined during the plan review process, prior to the
issuance of a plan approval letter.
Page 38
Meridian City Council Meeting Agenda October 22, 2019 — Page 212 of 793
2.13 It shall be the responsibility of the applicant to ensure that all development features
comply with the Americans with Disabilities Act and the Fair Housing Act.
2.14 Applicant shall be responsible for application and compliance with any Section 404
Permitting that may be required by the Army Corps of Engineers.
2.15 Developer shall coordinate mailbox locations with the Meridian Post Office.
2.16 All grading of the site shall be performed in conformance with MCC 11-12-3H.
2.17 Compaction test results shall be submitted to the Meridian Building Department for all
building pads receiving engineered backfill, where footing would sit atop fill material.
2.18 The design engineer shall be required to certify that the street centerline elevations are set
a minimum of 3 -feet above the highest established peak groundwater elevation. This is
to ensure that the bottom elevation of the crawl spaces of homes is at least 1 -foot above.
2.19 The applicants design engineer shall be responsible for inspection of all irrigation and/or
drainage facility within this project that do not fall under the jurisdiction of an irrigation
district or ACHD. The design engineer shall provide certification that the facilities have
been installed in accordance with the approved design plans. This certification will be
required before a certificate of occupancy is issued for any structures within the project.
2.20 At the completion of the project, the applicant shall be responsible to submit record
drawings per the City of Meridian AutoCAD standards. These record drawings must be
received and approved prior to the issuance of a certification of occupancy for any
structures within the project.
2.21 A street light plan will need to be included in the civil construction plans. Street light
plan requirements are listed in section 6-5 of the Improvement Standards for Street
Lighting. A copy of the standards can be found at
http://www.meridiancity.org/public_works.aspx?id=272.
2.22 The City of Meridian requires that the owner post to the City a performance surety in the
amount of 125% of the total construction cost for all incomplete sewer, water and reuse
infrastructure prior to final plat signature. This surety will be verified by a line item cost
estimate provided by the owner to the City. The surety can be posted in the form of an
irrevocable letter of credit, cash deposit or bond. Applicant must file an application for
surety, which can be found on the Community Development Department website. Please
contact Land Development Service for more information at 887-2211.
2.23 The City of Meridian requires that the owner post to the City a warranty surety in the
amount of 20% of the total construction cost for all completed sewer, water and reuse
infrastructure for duration of two years. This surety will be verified by a line item cost
estimate provided by the owner to the City. The surety can be posted in the form of an
irrevocable letter of credit, cash deposit or bond. Applicant must file an application for
surety, which can be found on the Community Development Department website. Please
contact Land Development Service for more information at 887-2211.
C. FIRE DEPARTMENT
http://weblink.meridiancity.org/weblink8/0/doc/160245/Pa e�spx
D. POLICE DEPARTMENT
http://weblink.meridiancily.org wweblink8/0/doc/160225/Pagel.aspx
Page 39
Meridian City Council Meeting Agenda October 22, 2019 — Page 213 of 793
E. COMMUNITY PLANNING ASSOCIATION OF SOUTHWEST IDAHO (COMPASS)
http://web lin k.meridianciN.org/weblink8/0/doc/160222/Pa eg 1. aspx
F. BOISE PROJECT BOARD OF CONTROL
http: //weblink. meridianci(y. org/WebLink8/DocView. aspx?id=160052&dbid= 0
G. CENTRAL DISTRICT HEALTH DEPARTMENT
http: //weblink. meridiancity.org/WebLink8/DocView. aspx?id=159845&dbid= 0
H. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ)
http: //weblink. m eridia n c i ty. org/weblink8/0/doc/1598801Page1. aspx
I. WEST ADA SCHOOL DISTRICT (WASD)
http: //weblin k. m eridia n c i ty. org/weblink8/0/doc/160498/Pagel. aspx
J. ADA COUNTY HIGHWAY DISTRICT (ACRD)
http: //weblink. meridiancitE. org/WebLink8/Doc View. gyp x?id=161671 &dbid= 0
K. IDAHO TRANSPORTATION DEPARTMENT (ITD)
http: //weblink. meridiancity. org/weblink8/browse. aspx?dbid= 0
L. VALLEY REGIONAL TRANSIT (VRT)
http: //weblink. meridianciU. org/weblink8/0/doc/160309/Pagel. aspx
IX. FINDINGS
A. Annexation and/or Rezone (UDC 11 -5B -3E)
Required Findings: Upon recommendation from the commission, the council shall make a full
investigation and shall, at the public hearing, review the application. In order to grant an
annexation and/or rezone, the council shall make the following findings:
1. The map amendment complies with the applicable provisions of the comprehensive plan;
The City Council finds the proposed annexation of the subject 35.67 acre property with R-15
zoning and proposed development is consistent with the MU -R designation. (See section V
above for more information)
2. The map amendment complies with the regulations outlined for the proposed district,
specifically the purpose statement;
The City Council finds the proposed map amendment and development complies with the
purpose statement of the residential districts in that it will provide for a range of housing
opportunities consistent with the Comprehensive Plan.
3. The map amendment shall not be materially detrimental to the public health, safety, and
welfare;
The City Council finds the proposed map amendment should not be detrimental to the public
health, safety and welfare as the proposed residential use should be compatible with adjacent
existing and future residential uses in the area.
Page 40
Meridian City Council Meeting Agenda October 22, 2019 — Page 214 of 793
4. The map amendment shall not result in an adverse impact upon the delivery of services by
any political subdivision providing public services within the city including, but not limited
to, school districts; and
The City Council finds that City services are available to be provided to this development.
The School District has submitted comments, included in Section VIII.I, that currently show
student enrollment is below capacity; however, the proposed development may cause area
schools to be over capacity depending on the age of school children enrolled.
5. The annexation (as applicable) is in the best interest of city.
The City Council finds the proposed annexation is in the best interest of the City.
B. Preliminary Plat (UDC 11-6B-6)
In consideration of a preliminary plat, combined preliminary and final plat, or short plat, the
decision making body shall make the following findings: (Ord. 05-1170, 8-30-2005, eff. 9-15-
2005)
1. The plat is in conformance with the comprehensive plan and is consistent with this unified
development code; (Ord. 08-1372, 7-8-2008, eff. 7-8-2008)
The City Council finds the proposed plat is generally in conformance with the UDC if the
Applicant complies with the conditions of approval in Section VIII.
Public services are available or can be made available ad are adequate to accommodate the
proposed development;
The City Council finds public services can be made available to the subject property and will
be adequate to accomoate the proposed development.
3. The plat is in conformance with scheduled public improvements in accord with the city's
capital improvement program;
The City Council finds the proposed plat is in conformance with scheduled public
improvements in accord with the City's CIP.
4. There is public financial capability of supporting services for the proposed development;
The City Council finds there is public financial capability of supporting services for the
proposed development.
5. The development will not be detrimental to the public health, safety or general welfare; and
The City Council finds the proposed development will not be detrimental to the public health,
safety or general welfare.
6. The development preserves significant natural, scenic or historic features. (Ord. 05-1170, 8-
30-2005, eff. 9-15-2005)
The City Council is unaware of any significant natural, scenic or historic features that need
to be preserved with this development.
Page 41
Meridian City Council Meeting Agenda October 22, 2019 — Page 215 of 793
!r_a�r�s��s:�� .!ss�s!�ese�es�rnssstis�s!rsssr!*e�nt�rr:�rer.�:ee±ss�nMUM
Page 42
Meridian City Council Meeting Agenda October 22, 2019 — Page 216 of 793