Loading...
CC - Staff ReportSTAFF REPORT COMMUNITY DEVELOPMENT DEPARTMENT HEARING 10/15/2019 DATE: TO: Mayor and City Council FROM: Kevin Holmes, Associate Planner 208-884-5533 Bruce Freckleton, Development Services Manager 208-887-2211 SUBJECT: H-2019-0091 Victory Commons MDA LOCATION: 130 E. Victory Rd. and 3030 S. Meridian Rd., in the SW 1/4 of Section 19, Township 3N., Range IE C��fIEN DIANq-, I. PROJECT DESCRIPTION Request to modify the terms of the existing development agreement (instrument #106155843 & 104153422) for the purpose of updating ownership information and boundaries of the subject properties subject to the new terms, modifying and adding new provisions, and including a new conceptual site plan. II. SUMMARY OF REPORT A. Project Summary Description Details Acreage 16.74 Current Zoning C -G Neighborhood meeting date; # of 7/30/2019; 4 attendees attendees: History (previous approvals) AZ -03-038; PFP-03-007; CUP -03-071; MI -06-005; DA inst. # 104153422 and addendum inst. # 106155843 III. APPLICANT INFORMATION A. Applicant/Representative: BVA Development, LLC 2775 W. Navigator Dr., Suite 220 Meridian, ID 83642 Page 1 B. Owner: Kuna Victory, LLC 901 Pier View Drive, Suite #201 Idaho Falls, ID 83402 IV. NOTICING Newspaper Notification Radius notification mailed to properties within 300 feet Public hearing notice sign posted Nextdoor posting V. STAFF ANALYSIS City Council Posting Date 9/6/2019 7/2/2019 9/13/2019 7/2/2019 The applicant has applied for a development agreement modification (MDA) for the subject 16.74 acre property (parcels R5915720012 and R5915720020) from the existing development agreement and addendum (Inst. No. 106155843 & 104153422). These previous agreements were recorded in 2004 and 2006, respectively. The applicant is proposing to update the ownership and boundaries of the properties subject to the amended DA, modify and add new provisions and include a new conceptual site plan. Currently, the existing DAs governs a larger area owned by separate entities than the applicant's property. Modifying the existing DA for the subject property will facilitate the development of the property without obtaining consent from multiple owners. The applicant is requesting Council approval of a new site plan for the properties (Exhibit D) and the specific removal of the following building design and size requirements included with the addendum to the current DA: Principally permitted uses on the subject property shall be allowed without Conditional Use Permit approval, provided all future buildings have: sloped metal roofs with overhanging eaves that are supported by posts; are oriented toward the public street (Front door facing street); siding visible from the street containing at least a three-foot tall wainscoting constructed of stone, brick, or other similar materials; that each building will provide a variety of building materials and colors; and each building is generally consistent with the nine pictures submitted with MI -06-005 (attached to this addendum), as determined by the Planning Director. If a future proposed building is not consistent with the above-mentioned provisions, then the building and use shall be required to obtain Conditional Use Permit approval prior to construction and operation. 2. Future construction on the subject site shall be generally consistent with the Master Site Plan submitted with MI -06-005 (Exhibit C), as determined by the Planning Director. All buildings with frontage on Victory Road or Meridian Road will be limited to a maximum 11,000 square foot building footprint and no building on this site shall have a building footprint larger than 20,000 square feet. If a future proposed building is not consistent with the Master Site Plan, then the building shall be required to obtain Conditional Use Permit approval. The site plan and building designs submitted by the applicant do not comply with these two above requirements and would require Conditional Use Permits for each building on the site. Staff is Page 2 recommending they be removed from the agreement and replaced with the conditions listed in Section VIII below. In order to maintain the cohesive character of the development envisioned by the original DA, staff is recommending that some shared design features be included in all new buildings on the site. All new buildings should include architectural features such as faux wood and metal panel accents and extra fenestration/windows. In addition, staff is recommending that all new buildings comply with the commercial standards of the Architectural Standards Manual. Staff has reviewed the proposed site plan and uses and found it to be in general compliance with Meridian City Code. The proposed site plan has fewer buildings, and with larger footprints, than what is currently shown in the existing DA. The applicant is proposing three of these larger buildings be multi -tenant flex space, a principally permitted use in the C -G zoning district in Table 11-2B-2. The three other buildings are proposed to be a mix of office, retail, and healthcare services. These uses are also all principally permitted in the current zoning. The proposed site plan moves the access drive to S. Meridian Rd. / SH -69 approximately 300 feet south of its current location. ITD has given their approval for this location as a right-in/right-out restricted access (see Exhibit F). UDC 11 -3H -4B restricts the establishment of new approaches on SH -69 unless approved by Council at the recommendation of the Idaho Transportation Department. Since ITD has given their tentative approval (Exhibit F) and the access shall be limited to a right- in/right-out only, staff is supportive of the relocation of this access point. Council approval is needed for the location of this approach as shown on the site plan (Exhibit D). The existing plat of Mussell Corner Subdivision established a cross access easement agreement throughout the subdivision, recorded under instrument number 105085931. Staff recommends that with any future subdivision the cross access locations between the subject properties and Lots 2 & 3, Block 1 of Mussell Corner Subdivision be retained. In addition, all newly created lots shall have cross access granted between them to facilitate site integration. Staff is also recommending that the existing cross access agreement in place with Jacks Place Sub to the north be retained. At this point in time, there is a daycare which limits the utilization of this agreement but it is in the interest of the City to maintain the option should the site redevelop in the future. To ensure the site develops as proposed, staff recommends replacing sections 4, 5, and 6 of the existing DA and Addendum (Inst. Nos. 104153422 & 106155843), with new provisions. Staff has included the DA provisions that should be incorporated in the new DA, included in Section VIII below. VI. DECISION A. Staff: Staff recommends approval of the proposed MDA per the provisions in Section VIII. — Page 3 VII. EXHIBITS A. Legal Description and Development Agreement Boundary 2775 W. Navigator 00ve. Butte 210 Atertdian, Idaho 83642 wwW.tdrucks.com Date: August 21, 2019 Project: ID -1402-1810 Page: 1 of 2 HORROCK �H- E N G I N E L• R PARCEL A Firclory Commons DA Modifaca#ion Boundary A parcel of land located in Government Lot 4 of Section 19, Township 3 north, lunge l east, Boise Meridian, being all of Lot 1, Block I and a portion of Lot 4, Block 1 of Mussell Comer Subdivision, filed in Book 95 cf Plats at pages 11624-11626, records of Ada county, Idaho, and as shown on Property Boundary Adjustment, Record of Survey No. 8699, recorded as Instrument No. 109137990, more particularly described as follows: BEGINNING at the northwesterly corner of said Mussell Comer; thence, along the north boundary of said Mussell Corner, 1) North 89°41'44" East, a distance of 162.00 feet to the northeast corner of said Mussell Comer and a point of curvature; thence along the east boundary of said Mussell Comer and a curve to the left, 2) Having a radius of 655.10 feet, an arc length of 438.43 feet, through a central angle of 38°21'05", and along chord which bears South 31'35'05" East a distance of 430.29 feet; thence continuing, 3) South 50°45'37" East, a distance of 558.77 feet; thence, 4) South 53°22'31" East, a distance of264.29 feet to the most northerly comer of Lot 5, Block 1 of said Mussell Corner;. thence along the northwesterly boundary of said Lot 5, 5) South 36°37'29" West, a distance of 32.14 feet to the most westerly corner of said Mussell Comer; thence along the southwesterly boundary of said Lot 5, 6) South 53°2231" East, a distance of 21.56 feet to the most southwesterly corner of said Lot 5; thence along the south boundary of said Lot 5, 7) South 89°31'31" East, a distance of 18.52 feet to the southeasterly boundary of said Lot 5;; thence, along the easterly boundary of said Mussell Corner, HAD 1402 Victory Com msl roject Dcar04 SurueyM,02 Descriptions7DA Mad. 082219 Page 4 Date: August 21, 2019 Project: ID -1402-1810 Page: 2 of 2 8) South 00°29'16" West„ a distance of 361.15 feet to the southeast corner of said Mussell Corner; thence, along the south boundary of said Mussell Comer, 9) South 89°42'22" West, a distance of 633.35 feet; thence, leaving said south boundary, 10) North 00°00'00" East, a distance of 159.16 feet thence, 11) North 89°0423" West a distance of 104.01 feet; thence, 12) North 00°55'37" East a distance of 110.06 feet; thence, 13) North 89°04'23" West a distance of 51.53 feet; thence parallel with the west boundary of said Mussell Comer, 14) North 003828" East a distance of 169.52 feet; thence parallel with the south boundary of said Mussell Comer, 15) South 89'°42'22" West a distance of 270.044 feet to the west boundary of said Mussell Comer; thence along said west boundary, 16) North 0013828" East a distance of 840.22 feet to the POINT OF BEGINNING. Containing 729,415 square feet (16.745 acres), more or less. HAD 1402 Victory CommonsTroject DaraiO4 Survey14.02 DescriptionslDA Mod. 082219 Page 5 114 OA�71' 24 19�NGPP 191"MWUML U00 414.11 Nf C ft uuS5Ea LRDP0.66 , r rst va IY— ra� SCALE i'=2116' .. Curve Table C.0k". I ae�e cNo'C piregw t71uE Lsrvtl- I \ Ct 430AT 1 03W 36'7r'�'. p-1.-- --- SITUATED IN A PORTION OF GOVERNMENT LOT d, SECTION 19, TOWNSHIP 3 NORTH, RANGE 1 EAST, B.M., ADA COUNTY, IDAHO o PARCEL ArE OF ¢ � 729,415 S.Q. FT. °�•�r�' cc 16.745 AC. Z t sm 1722W p i � zToa L, NBM'23 W PST Lz L] NO.m5 rro.w NS3"pl'29.w IN Dr• � it IIl m N f 2 S# fdri. W€SElL SVSG S88°IZtx'W k'I3.iS _ �_, 2418 Z�JW LP[c rl ""' VICTORY ROAD anpcesert LEGEND Line Table HOR1 ROCKS Z N t A+ 6 C R a nsw.n VIGATo I)R.II TEx1 MERMIAN.10& 2 — — �— BOUNDARY LINE ADJACENT LOT LINE — SECTION LINE �J SECTION MONUMENT G CALCULATED POINT PARCEL A EXHIBIT B VICTORY COMMONS DA MODIFICATION BOUNDARY Page 6 L -a L -Nm I Dlrecbon 1 ` kA ,s' S36'9x•3Yw I.x x1 ear sss•ars+g L3 ,asx see•yrs,>E t'�G INFO -II-III.. w.•g oe�zr+,e �.� 1..fw AE . E B B. Current Development Agreement Provisions (Inst. Nos. 104153422 & 106155843) USES PERMITTED BY TIUS AGREEMENT: 4.1 The uses 31lowed pursuant to this Agreement are only those uses allowed under "City's" Zoning Ordinance codified at Meridian City Code Section l t-7-2 if which are herein specified as follows: a) Construction and developmeart of a commercial subdivision that includes u combination feed'store and gasleanvmience station in u proposed C Grone, Ail fidure uses on proposed totes or parcels within the annexation area .shuff be approved througk the Conditional Use Permit pro cess. 4.2 No change in the uses specified in this Agreement shall be allowed without modification of this Agreement. 5. DEVELOPMENT IN CONDITIONAL USE; "OWNER/DEVELOPER" has submitted to "City" an application for conditional use permit, and shall be required to obtain the "City's" approval thereof, in accordance to the City's Zoning & Development Ordinance criteria, therein, provided, prior to, and as a condition of, the commencement of construction of any buildings or improvements on the "Property" that require a conditional use permit. 6. CONDITIONS GOVERNING DEVELOPMENT OF SUBJECT PROPERTY: 6.71. "developer" shall develop the "Property„ in accordance with the following special conditions: B, Adopt the Recommendations of the Planning. and Zoning Department as follows: 1. Prior to annexation ordinance approval, a Development Agreement shall be entered into between the City of Meridian and the property owner(s). The Development Agreement shall require that: a) All future uses on proposed lots or parcels within the annexation area shall be approved through the Conditional Use Permit process. la) Business hours for uses on this property shall presently have no restriction on hours of operation. However, if in the future the "no restriction" can hours becomes a problem or hindrance to the surrounding area, then the City shall have the opportunity to re- evaluate the hours of operation, and at that time possibly place hours of restriction upon the businesses. Additionally, horns of fuel delivery, any potential for refrigerated truck oreration, and other noise generated at the site shalt comply with the .tferidian City Code Noise Ordinance. (Per action ofthe City Council taken at their July 6, 2004 meeting.) 2. Remove any existing domestic wells and/or septic systems within this project from their domestic service, per City Ordinance Set ['on 5-7- 517, when services are available from the City n keridian. Wells may be used for non-domestic purposes such as I u dscape irrigation. 3. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the parcel shall be tiled per City Ordinance 12-4-13. Plans will need Page 7 to be approved by the appropriate inigationldrainage district, or lateral users association (ditch owners), with written approval or non - approval submitted to the Public Works Department. If lateral users association approval can't be obtained, plans will be reviewed and approved by the Meridian City Engineer prior to final plat signature. Any fuMm subdivision, uses and construction on this property shall comply with the: City of Meridian ordinances in effect at the time. ADDENDUM Inst. No 106155843 Provisions: OV4NEWDEVE.LOPER agrees to be bound by the terms of the original Development .Agreement (instrument # 104153422), approved on November 23, 2004 on the land described in Exhibit "A", except as specifically regarding the following items: 1. The parties hereto agree that the development of the property described in Exhibit "A" shall be in accordance with the terms of the above described Development Agreement, exlribit "$", or those City ordinanmi in effect at the time any subsequent conditional use application is filed, whIchever are more restrictive. That the Original Development Agreement, hlstrurnent # 104153422, approved on November 23, 2004, and recorded on December 3, 2OD4, be amended by modifying the following: • Section 4.1— eurmntly states: "The uses allowed pursuant to this Agreement are only those uses allowed under "City's" Zoning Ordinance cndified at Meridian Code Section.11-7- 2(K) which are herein specified as follows: a) Construction and development of a commercial subdivision that includes a feed store and gas/convenience station in a proposed C -G zone. All future uses on proposed lots or parcels within the annexation area shall he approved through the Conditional Use permit process-" This Suction 4.1 shall be replaced with the following language: ""The uses allowed pursuant to this Agreement are only those uses allowed under City's Unwed Development Code codified in'rable 11-211-2 and herein specified as follows, a) Principally permitted uses on the subject property shall be allowed without Conditional Use Permit approval, provided all future buildings have: sloped metal roofs with overhanging eaves that are supported by posts; are oriented toward the public street (Front door facing street); siding visible from the street containing at least a three-foot tall wainscoting constructed of stone, brick, dr other similar materials; that each building will provide a variety of building materials and colors; and each building is generally consistent with the nine picrures submitted with 1x11-06-ilil5 (attached to this addendum), as determined by the Planning Director. If a future proposed building is not consistent with the above-mentioned provisions, then the building and use shall be required to obtain Conditional Use Permit approval prior to construction and operation. Page 8 b) Future: construcLion on the subject site shall be generally consistent with the Master Site Plant submitted with NEI -06-005 (attached to this addendum), as determined by the Planning Director. All buildings with frontage on Victory road or Meridian Road will be fin-ited to a maximum 11,000 square foot building footprint and no building on this site shall have a building footprint larger than 20,000 square feat. If a future proposed building is not consistent with the Master Site Plan, then the building shall be required to obtain Conditional Use Permit approval. c) That all future buildings on the subject property will be required to submit a Certificate of ming Compliance (CZC) application prior to construction, And all future buildings adjacent to Meridian Road will be required to obtain Resign Review approval prior to construction. Section 6 — Conditiatts Governing Mrelapment of Subject Property sets forth additional conditions and restrictions for the property_ Section 6.Bla currently states: "a) All future uses on proposed lots or parcels within the annexation area shall be approved through the Conditional Use Permit process-" This :Section 6.131a shall be replaced with the following language: "a) All future uses on proposed lots or parcels within the annexation area shall be required to comply with the amended Section & of the Development Agreement and the Unified Development Code." Page 9 C. Original Concept Plan Page 10 Ali M 7 Ir y I D. Proposed Conceptual Site Plan (dated: 08/07/2019) VICTORY COMMONS/ SITE PLAN / DEVELOPMENT AGREEMENT MODIFICATION i Page 11 E. Conceptual Building Renderings (not approved) Page 12 F. Idaho Transportation Department Letter V24, Your Safety • Your Mobility IDAHO TRANSPORTATION DEPARTMENT P.C. Box 9028 • Boise, ID a3707-2028 Your Economic Opportunity J208)33a-a3Do • Itd.id.gwabo June 19, 2019 Chhang Ream CR Engineering 181 East 501h St. Garden City, ID 83714 Via Email RE: Victory Commons -ITD Traffic Impact Study Acceptance Letter Dear Mr. Ream, The Idaho Transportation Department ill has completed our review of the Victory Commons Traffic Impact Study (T15) dated May 6, 2019. The proposed Victory Commons development is located on the northeast corner of SH -59 and Victory Read. The development is proposing a direct access onto SH -69 at approximately milepoint 8.32, right. ITD is willing to consider a right in, right -out only approach. The following mitigation improvements need to be Installed on SH -69 priorto the development's PHASE 1 occupancy. Existing Approach located approximately 1,300ft north of Victory Road . The existing approach will need to be removed. Proposed Approach located approximately 1,300ft north of Victory Road • Install a northbound right turn lane designed to ITD standards for a 55MPH Speed zone. See Figure 3B-4 of the ITD traffic Manual for details. . Dedicate 12ft of right-of-wayto ITD forthe entire length ofthe right turn lane. • I nstall a concrete keyed in traffic separator Type 1 that will restrict the approach to right -in, right -out. The traffic separator shall start at Maestra Street and extend approximately S50ft south. See conceptual image below. Page 1 of 2 If the developer 'a in agreement with addressing the items as outlined above then ITD finds the Victory Commons TI5 to be acceptable from a state highway access, safety and mobility standpoint. You may proceed with stamped engineered drawings to address the required corridor improvements. This letter only acknowledges rl acceptance of the 7I5, final approval of the approach and improvements is determined once all documentation has been provided and the permit is signed. Maintaining safety and mobility for Idaho's motorists Is of t he utmost importance to ITI7. Ill have any questions please do not hesitate to contact me at erika bowenmeltd.1ci ltov or 206-265-4312 extension #7. Sincerely, Erika R. Bowen, P.E. ITD District 3 Traffic Technical Engineer CC. Mindy Wallace, ACRD Sonya Aller, City of Meridian Page 13 G. Parks Department Conditions of Approval C �(EP,IDIAN, Reviewer: Kim Warren / Pathways Project Manager Parks and Recreation Planner Assigned: Kevin Holmes Project Name: Victory Commons File No: H-2019-0091 Date: 10.10.19 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. The project developer shall design and construct multi -use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3) and as listed below. Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to final approval, the applicant shall dedicate public access easements for two multi -use pathways, along with additional easement width for a future (third) multi -use pathway segment. These are: 2.1 A micropath connecting the micropath that extends from the cul-de-sac at E Lake Creek/ E Observation Drive across the Kennedy Lateral Easement to pedestrian facilities at Meridian Road. Width of this easement shall equal the width of the existing pathway, plus 2' each side. 2.2 A 10' multi -use pathway along Meridian Road to connect the existing sidewalk east of Meridian Road to the 10' pathway north of the property. Coordinate with adjacent owner to north as necessary to achieve this connection. Multi -use pathway easements shall be a minimum of 14' wide (10' pathway + 2' shoulder each side). 2.3 If in good condition, the existing sidewalk along Meridian Road may remain. It is the City's intent to ultimately achieve a 10' detached multi -use pathway along the length of this parcel. If applicant chooses not to replace existing sidewalk, applicant shall dedicate any additional easement width necessary to provide for a future 10' detached multi -use pathway. Submit easement documents to the Planning Division for Council approval and subsequent recordation. Use standard City template for public access easement. Easement checklist must accompany all easement submittals. 3. Construct multi -use pathways per typical paving section(s) shown in the Meridian Pathways Master Plan Chapter 3. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi -use pathways. 5. Project developer shall be responsible for procuring any easements necessary to complete the pathway connection between Meridian Road and the end of the existing micro -path. 6. Project developer shall be responsible for obtaining license agreement and other permission(s) as required for constructing within irrigation district easements. Page 14 Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall not (nor are they intended to) override those of the irrigation district having jurisdiction over the project area. VIII. CITY/AGENCY COMMENTS & CONDITIONS Recommended Development Agreement Provisions: USES PERMITTED BY THIS AGREEMENT: 4.1 The uses allowed pursuant to this Agreement are only those uses allowed under City's Zoning Ordinance codified at Meridian Unified Development Code § 11- 2B. CONDITIONS COVERING DEVELOPMENT OF SUBJECT PROPERTY: 5.1. Owner/Developer shall develop the Property in accordance with the following special conditions: Future development of this site shall comply with the design standards listed in UDC 11-3A-19 and the guidelines contained in the Architectural Standards Manual. In addition, new buildings shall include the following architectural features: faux wood and metal panel accents and extra fenestration/windows. 2. All future development of the subject property shall comply with City of Meridian ordinances in effect at the time of development. 3. Certificate of Zoning Compliance and Administrative Design Review applications are required to be submitted to the Planning Division for approval of all future buildings/uses on the site, prior to applying for building permit. 4. Direct cross access shall be provided between Lots 2 and 3, Block 1 of Mussel Corner Subdivision. 5. Applicant shall provide a recorded cross agreements between the subject properties and with parcels R5915720030, R5915720042, and R6242270030 in accord with UDC 11-3A-3. The recorded agreement shall be submitted to the Planning Division prior to obtaining occupancy of the first structure. 6. The existing access to S. Meridian Rd. at the north end of the property shall be closed as required by ITD and new approach constructed per ITD standards. The applicant shall install a detached sidewalk and landscape the area with a 25 -foot wide street buffer to match the adjacent sidewalk and landscaping and in accord with UDC 11 -3B -7C. 7. The required landscape buffer along S. Meridian Rd. and E. Victory Rd. shall meet the standards listed in UDC 11-3B-7 prior to the issuance of Certificate of Occupancy for any new construction. 8. The required 25 -foot wide land use buffer to the residential uses to the north and east shall be constructed to the standards of UDC 11-3B-9. If the Page 15 planting of vegetation be restricted by any easement, the required buffer materials shall be planted outside of said easement to comply with the standards listed above. 9. All future and existing uses on the property shall comply with the outdoor storage as an accessory use standards of UDC 11-3A-14. 10. The open pond shall have recirculated water and shall be maintained such that it does not become a mosquito breeding ground. 11. Prior to any Certificate of Zoning Compliance approvals for the area marked "Future development commercial retail storage" on the submitted site plan, the pond area shall be improved as an amenity with pedestrian walking paths and an outdoor seating area. 12. Comply with the Parks Department Conditions of Approval included in Exhibit G of the staff report dated October 15, 2019. 13. The development of the property shall substantially comply with the conceptual site plan included in Exhibit D of the staff report dated October 15, 2019. Page 16