Loading...
2019-09-30 Boise ProjectOPERATING AGENCY FOR 167,000 CLINTON C. PLINE �i �y ACRES FOR THE FOLLOWING CHAIRMAN OF THE BOARD ®ISE PROJECT ®ARIA ®� CONTROL IRRIGATION DISTRICTS RON PLATT VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYLGARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER City Cleric's Office 33 E Broadway Avenue Meridian ID, 83642 (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-3155 27 September 2019 RE: Inglewood Place Sub 3250 E Victory Rd., Meridian Nampa -Meridian Irrigation District McDonald Lateral 41+70 Sec. 21, T3N, RIE, BM. NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX: (208) 344-1437 RE C" F T V 'I �-,D SEP 3 0 791 1 fly . HH -2019-0090 NM —1078, 1078V, 1078W, 1078U City Cleric: After reviewing the plans stamped and dated 8-27-19 by John G. Caenter rp y Pl P. with tE. he the Inglewood Place Subdivision, Boise Project approves of the prelim following being noted: The United States' McDonald Lateral lies within name ofdary of the United Statesughthe tioned location. The easement for this canal is held in the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and2l feet north and east the assert the federal easement 20 feet south andv canal's centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. The Boise Project does not approve landscaping including trees and/or shrubs (other than grass or gravel) within its easements, as this offwill cthe lnly edgesncreasof alleBoise P oje t our cost of maintenance. All fences and paths must be just easements and they mast remain a flat drivable surface. Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be approved by Boise Project Board of Control prior to construction. Project facilities and/or easements that parallel, and are within and/or intended to be within road right-of-ways due to any development of this property must be relocated outside of road right-of-ways. The easements of Boise Project facilities will remain the same unless agreed upon and/or approved with written permission from Boise Project Board of Control. The construction of any roadway crossings must be conducted only during the non- irrigation season when the canal is dewas ned. In any case no a osecured thrrk- shall lough the place within the easement before the proper crossing agreements have been Bureau of Reclamation and the Boise Project Board of Control. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case, no work shall take place within iproper he Boise Proe reements ct Board have been secured through both the Bureau of Reclamation and of Control. Crossing agreements must be secured and signed by all parties prior to March 1St of each year. A time schedule for the construction to be done during the non-irrigation season must be approved by Boise Project prior eme t boundarieswithin of the Boise Project Board construction will be allowed within the ea of Control facilities after March 15th of each year. However, on a case by case basis, overhead utilities and utilities boring underneath a Project facility may be allowed after March 15th if reviewed and approved by the Boise Project. The piping and relocation of any Lateral, Canal and/or Drain must be reviewed and approved by the Project and is (to include alleppon5 b s r Thestrur e tures) and must be warranted by the landowner for a pd of ( ) five-year Agreement must be secured prior to ANY t Bbaeau of Reclamation prior nce of that facility. A loctoa any agreement must also be procured through the construction within the above-mentioned easement. Boise Project Board of Control must approve any requests and/or relocation of delivery points prior to construction. Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into any live irrigation system is permitted. Local irrigation/drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement. Should there be any small (neighborhood) irrigation ditches on this site, the developers and/or landowners will be obligated to protect them and allow water to pass to downstream neighbors. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a copy of the irrigation and drainage plans. Whereas this property lies within the Nampa- Meridian Irrigation District it is important that representatives of this development contact NMID offices as soon as possible to discuss a pressure system prior to any costly design work. If applicable, the irrigation system will have to be built to specific specifications as set by the Districts / Project. Boise Project Board of Control must receive a written response from Nampa -Meridian Irrigation District as to who will own and operate te pressure Board irrigation Control. stem prior to is review and approval of an irrigation plan byProject Wording on the preliminary and final recorded plat needs to state that any proposed and/or future usage of the Boise Project Board of Control facilities are subject to Idaho Statues, Title 42-1209. Future preliminary and final plats must call out the Project easements and the plats must also note, which lots have surface irrigation water rights and which lots do not. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to review plans and require changes when our easements and/or facilities are affected by unknown factors. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Since ly, Thomas Ritthaler Assistant Project Manager, BPBC for/tr cc: Clint McCormick Watermaster, Div; 2 BPBC Greg Curtis Water Superintendent, NMID File