Loading...
PZ - Revised STORAGE CUP70 C D d WINDSONG SUBDIVISION NO. 2 ZONED R-8 N I N U N � 25' v o 0 230' 40.00' aIli Ly! N 290 n 277' 25' '25- N_ 302' 0 SH N 303' 0 � 76 25' N - - �� CGGY�"SA•� o J N 307N Oo H Z C ' L I N D E R DEVELOPMENT DATA 1. DOMESTIC WATER WILL BE PROVIDED BY THE CITY OF MERIDIAN BY EXTENSION OF EXISTING SYSTEM. 2. SEWAGE DISPOSAL SHALL BE PROVIDED BY THE CITY OF MERIDIAN MUNICIPAL SEWER SYSTEM. 3. ALL STORM WATER RUNOFF WILL BE RETAINED ON SITE USING GRASS SWALES AND PROPERLY SIZED AND ENGINEERED UNDERGROUND SEEPAGE BEDS. 4. PRESSURE IRRIGATION SHALL BE UNDERGROUND SPRINKLER SYSTEMS WITH WATER PROVIDED BY NAMPA -MERIDIAN IRRIGATION DISTRICT.. 5. CURRENT ZONE IS C -C. THIS PROJECT INCLUDES PARCEL NO, SO435449705. THERE WILL BE APPROXIMATELY 425 EXTERIOR STORAGE UNITS WITH ADDITIONAL INTERIOR CLIMATE CONTROLLED UNITS IN THIS PROJECT, THE TRAFFIC ACCESS DRIVES WILL BE 25 FEET WIDE, WITH REMAINING ACCESS DRIVES BEING 20 FEET WIDE. SIDEWALKS AROUND THE COMMERCIAL/RETAIL BUILDINGS WILL BE 6 FEET WIDE. THE EXISTING SIDEWALK ALONG WEST USTICK ROAD WILL BE REPLACED WITH A 10 FOOT WIDE SIDEWALK. 6. TOTAL AREA OF PROPOSED DEVELOPMENT IS 200,811SF OR 4.61 ACRES. STORAGE UNITS 154,464 SF ) AAS D N 41 m m A m 0 30' o _ PARKING CALCULATIONS 5760 —2rMG 12 REQUIRED SPACES PROVIDED — 12 9x20 SPACES + 1 HANDICAP SPACE NO. BY JDATEIDESCRIPTION DEVELOPER: 0 w 1m 120 xJ SITE PLAN FOR CUP ENVISION 360 INC. ADERA STORAGE C 12790 W TELMARK ST SCALL' 1• - 40' BOISE, ID 83713 SEY4 SES SECTION 35, T.4 N., R.1 W., B.M., ADA CO., ID. 0 208-921-5252 USTICK &LINDER ROADS, CITY OF MERIDIAN PROJECT NO DRAWING NOME DESIGNEp BY CHECKED BY RAWN BY DATE: SHEET NUMBER VL JAI 9001 LSEN-ADERA.DWG C 01 -SEN J AUSTIN SEPT 21, 2019 1 of c u v �D z z 3 I of 8 Am z 8 Dm B.c ql v I N 307N Oo H Z C ' L I N D E R DEVELOPMENT DATA 1. DOMESTIC WATER WILL BE PROVIDED BY THE CITY OF MERIDIAN BY EXTENSION OF EXISTING SYSTEM. 2. SEWAGE DISPOSAL SHALL BE PROVIDED BY THE CITY OF MERIDIAN MUNICIPAL SEWER SYSTEM. 3. ALL STORM WATER RUNOFF WILL BE RETAINED ON SITE USING GRASS SWALES AND PROPERLY SIZED AND ENGINEERED UNDERGROUND SEEPAGE BEDS. 4. PRESSURE IRRIGATION SHALL BE UNDERGROUND SPRINKLER SYSTEMS WITH WATER PROVIDED BY NAMPA -MERIDIAN IRRIGATION DISTRICT.. 5. CURRENT ZONE IS C -C. THIS PROJECT INCLUDES PARCEL NO, SO435449705. THERE WILL BE APPROXIMATELY 425 EXTERIOR STORAGE UNITS WITH ADDITIONAL INTERIOR CLIMATE CONTROLLED UNITS IN THIS PROJECT, THE TRAFFIC ACCESS DRIVES WILL BE 25 FEET WIDE, WITH REMAINING ACCESS DRIVES BEING 20 FEET WIDE. SIDEWALKS AROUND THE COMMERCIAL/RETAIL BUILDINGS WILL BE 6 FEET WIDE. THE EXISTING SIDEWALK ALONG WEST USTICK ROAD WILL BE REPLACED WITH A 10 FOOT WIDE SIDEWALK. 6. TOTAL AREA OF PROPOSED DEVELOPMENT IS 200,811SF OR 4.61 ACRES. STORAGE UNITS 154,464 SF ) AAS D N 41 m m A m 0 30' o _ PARKING CALCULATIONS 5760 —2rMG 12 REQUIRED SPACES PROVIDED — 12 9x20 SPACES + 1 HANDICAP SPACE NO. BY JDATEIDESCRIPTION DEVELOPER: 0 w 1m 120 xJ SITE PLAN FOR CUP ENVISION 360 INC. ADERA STORAGE C 12790 W TELMARK ST SCALL' 1• - 40' BOISE, ID 83713 SEY4 SES SECTION 35, T.4 N., R.1 W., B.M., ADA CO., ID. 0 208-921-5252 USTICK &LINDER ROADS, CITY OF MERIDIAN PROJECT NO DRAWING NOME DESIGNEp BY CHECKED BY RAWN BY DATE: SHEET NUMBER VL JAI 9001 LSEN-ADERA.DWG C 01 -SEN J AUSTIN SEPT 21, 2019 1 of