Loading...
2019-05-01 ITD IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 • Boise, ID 83707-2028 (208) 334-8300 • itd.idaho.gov May 1, 2019 C.Jay Coles City of Meridian 33 E. Broadway Avenue Meridian, Idaho 83642 VIA EMAIL Development Application H-2019-0035 AZ, CPAM Project Name WAGNER FARMS Project Location 3420 West Chinden Boulevard, north of US-20/26 milepost 36.24 Project Description  Amendment to Comprehensive Plan Future Land Use Map: change land use designation from Low Density Residential to Commercial  Annexation and Zoning: rezone from RUT (Rural to Urban Transit) zoning district to a C-C (Community Business) zoning district for future addition of a convenience store and fuel sales facility to the existing farmers market. Applicant PD Larson & Co. The Idaho Transportation Department (ITD) reviewed the referenced comprehensive plan amendment, annexation, and rezone applications and has the following comments: 1. This project abuts the State highway system. 2. ITD has received an approach permit application from the applicant and is currently processing their application. The proposed access aligns with the current US-20/26 and North Ten Mile intersection as required by ITD and proposes the removal of the western existing approach. 3. ITD has received a traffic analysis for the Wagner Farms development. The traffic analysis is scheduled May 24, 2019 for review by the Technical Engineer. ITD cannot determine what mitigation is necessary without reviewing the provided traffic analysis. Once accepted, the traffic analysis will identify what mitigation, if any, the applicant will be required to install to mitigate for traffic impacts from their development. 4. Idaho Code 40-1910 does not allow advertising within the right-of-way of any State highway. IDAHO TRANSPORTATION DEPARTMENT P.O. Box 8028 • Boise, ID 83707-2028 (208) 334-8300 • itd.idaho.gov 5. The Idaho Administrative Procedures Act (IDAPA) 39.03.60 governs advertising along the State highway system. The applicant may contact Justin Pond, Right-of-Way Section Program Manager, at (208) 334-8832 for more information. 6. The City is reminded that the US-20/26 corridor is already congested. This project will increase the number of vehicle trips in the corridor. As the City continues to add additional trips to the corridor through development, the congestion will worsen until the roadway system is ultimately overloaded and fails. 7. Provided the necessary traffic mitigation has been installed and the appropriate ITD permit has been obtained, ITD does not object to the proposed application as presented. If you have any questions, you may contact Ken Couch at (208) 332-7190 or me at (208) 334-8338. Sincerely, Sarah Arjona Development Services Coordinator Sarah.Arjona@itd.idaho.gov