Loading...
PZ - Basement DetailsN. Basement Demolition Plan Scale: 1/8"= I -U' A Lower Level Demolition Plan Scale: 1/8" = 1'-0" General Notes I. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCING DEMOLITION WORK- 2. ORK 2. CONTRACTOR SHALL COORDINATE DEMOLITION SCHEDULE(S) WITH OWNER. 3. CONTRACTOR SHALL PROVIDE TEMPORARY INFILL, WEATHER PROTECTION, AND SECURITY PROVISIONS REQUIRED BETWEEN TIME OF DEMOLITION AND TIME NEW OR REPLACEMENT CONSTRUCTION. 4. SEE PLUMBING:, MECHANICAL, AND ELECTRICAL DRAWING=S FOR REQUIRED PLUMBING, MECHANICAL, AND ELECTRICAL DEMOLITION. Reference Notes OI REMOVE EXISTING: WOOD STUD WALL / PARTITION. O2 REMOVE EXISTING CONCRETE MASONRY UNIT WALL. O3 REMOVE EXISTING CONCRETE WALL. O4 REMOVE EXISTING WOOD DOOR(S) AND FRAME AS APPLICABLE. OREMOVE EXISTING STAIR AND LANDING. 6 REMOVE EXISTING WINDOW WELL, AND WINDOW AS APPLICABLE (PHASE 1). OREMOVE EXISTING: CONCRETE SLAB FLOOR. OREMOVE EX15TING WINDOW, AND FRAME AS APPLICABLE. 90 REMOVE EX16TING DRINKING FOUNTAIN. 10 REMOVE EXISTING CABINETRY.