2018-12-31 Boise Project Board of ControlRICHARD DURRANT
CHAIRMAN OF THE BOARD
CLINTON PLINE
VICE CHAIRMAN OF THE BOARD
ROBERT D. CARTER
PROJECT MANAGER
THOMAS RITTHALER
ASSISTANT PROJECT MANAGER
APRYL GARDNER
SECRETARY -TREASURER
MARY SUE CHASE
ASSISTANT SECRETARY -
TREASURER
City of Meridian
City Cleric's Office
33 E. Broadway Avenue,
Meridian, Idaho 83642
ITENTINIM
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
2465 OVERLAND ROAD
BOISE, IDAHO 83705-3155
31 December 2018
RE: Stapleton Sub
SW Corner S Meridian Rd and W. Harris St.
Boise- Kuna Irrigation District
Tumbler Lateral 21+10
Sec. 25, T3N, R1 W, B.M.
Jaycee Jones, City Cleric:
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
TEL: (208) 344-1141
FAX: (208) 344-1437
File NO. H-2018-0129 AZ PP VAR
1 4
The United States' Tumbler Lateral lies within the boundary of the above-mentioned location.
The easement for this lateral is held in the name of the United States through the Bureau of
Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert
this federal easement 20 feet East and 20 feet West of the lateral's centerline and 20 feet in all
directions from any concrete irrigation Structures. Whereas this area is for the operation and
maintenance of our facility, no activity should hinder our ability to do so.
The Boise Project does not approve landscaping including trees and/or shrubs (other than grass)
within its easements, as this will certainly increase our cost of maintenance. All easements must
remain a flat drivable surface.
Any fencing, as may be required, must be constructed off of any Boise Project Easements.
Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over
Project facility easements must be located outside of these easements.
Utilities planning to cross any project facility must do so in accordance with the master policies
now held between the Bureau of Reclamation and most of the utilities. In any case no work shall
take place within the easement before proper crossing agreements have been secured through
both the Bureau of Reclamation and the Boise Project Board of Control.
Storm Drainage and/or Street Runoff must be retained on site.
Local irrigation/drainage ditches that cross this property, in order to serve neighboring
properties, must remain unobstructed and protected by an appropriate easement.
Boise Project is also under the understanding that the Home Owners Association will own
and operate any pump station that is associated with this project.
This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a
copy of the irrigation and drainage plans.
If you have any further questions or comments regarding this matter, please do not hesitate to
contact me at (208) 344-1141.
Sin4R"
e�7
Th
itthaler
Assistant Project Manager
for/tr
cc: Clint McCormick Watermaster, Div; 2 BPBC
Lauren Boehlke Secretary -Treasurer, BKID
File