Loading...
CC - Applicant Email New CollectorChris Johnson From: Sonya Allen Sent: Monday, December 03, 2018 10:55 AM To: C.Jay Coles; Charlene Way; Chris Johnson Subject: Linder Village - New Collector Attachments: LTR to McKinney Huarte.2018.11.27.pdf Please include in the public record. Thanks! From: Dave McKinney [mailto:ldm@ctcweb.net] Sent: Friday, November 30, 2018 6:40 AM To: Sonya Allen Cc: 'Joe Huarte' Subject: FW: Linder Village - New Collector Hi Sonya. Good news! We received a confirmation letter from Brighton this week for the connection to Fox Run and should be good to go. I will start our work with ACHD on this. The letter from Brighton is attached for your reference. Please let me know if you have questions. Thanks for all your help and guidance. Best, Dave From: Jon Wardle[mailto:Iwardle@brightoncorp.com] Sent: Tuesday, November 27, 2018 3:32 PM To: Dave McKinney <Idm@ctcweb.net>; 'Joe Huarte' <loehuarte@gmail.com> Cc: David Turnbull <dturnbull@brightoncorp.com>; Amanda McCurry <amccurry@brightoncorp.com>; Mike Wardle <mwardle@brightoncorp.com> Subject: Linder Village - New Collector Dave and Joe, We are attaching our written confirmation of the New Collector Road from Linder to Fox Run. If you have any questions, please let us know. Jon Wardle President, Brighton Development, Inc. Brighton Corporation I www.brightoncorp.com 12601 W. Explorer, Suite 200 1 Boise, ID 83713 Office 208.378.4000 1 Direct 208.287.0518 1 Cell 208.871.9361 November 27, 2018 David McKinney DMG Real Estate Partners, LLC 2537 W State Street, Ste. 110 Boise, ID 83702 Dear David and Joe, BRIGHTON Joe Huarte High Desert Development 712 N. Troutner Way Boise, ID 83712 Thank you for providing us with details regarding the updated Linder Village plans (copy attached for reference) and the inclusion of a new collector road ("New Collector") that will connect North Linder Road to North Fox Run Way through our collective properties. At your request, Brighton is providing written confirmation regarding the alignment of the future New Collector road: 1. Brighton Investments, LLC, an affiliated entity of Brighton Corporation, is the owner of Parcel No. 50425120902, which is adjacent to North Fox Run Way and the Linder Village Development. 2. Brighton acknowledges that the New Collector provides a backage road connection that parallels Chinden Boulevard that will provide long-term benefit to the community, and that the New Collector will be constructed concurrent with Linder Village's Phase 1 improvements. 3. The right-of-way for the New Collector is undetermined but is generally understood to be between 60 and 70 feet to comply with ACHD design standards, excluding any required landscape buffer to existing residential properties. 4. Brighton agrees to work with ACHD on the alignment and right-of-way acquisition to facilitate the construction of the New Collector. The purchase price of the right-of-way is to be determined. The alignment of the new collector shall be coordinated so as not to interfere with the access to the Veranda and Cadence properties on the east side of Fox Run. S. The New Collector through Brighton's property will be adjacent to existing residential homes, and Brighton will require that a landscape buffer of the existing, mature vegetation be maintained in a horizontal dimension of 25 feet to 30 feet from back of future sidewalk. One additional matter to be addressed with the improvements to SH 20/26 and the New Collector connection to Fox Run Way is the Paramount community monuments at the intersection. We recognize that a fly -over monument as currently exists may not be practical with the expanded intersection and signal design. However, it is important that the entry monument be replaced or reconstructed in a manner consistent with the general character of the existing monuments so that the community's identity is maintained. Please detail for us your plans on how this will be accomplished concurrent with the roadway improvements. Sinc ely, avi W. Turnbull 12601 W. Explorer Drive Suite 200 Boise, Idaho 83713 www.brightoncorp.com p.208-378-4000 f.208-377-8962 COLLECTOR ROAD PLAN SCALE: Y is 100' 1„ z=.T ano r z 0 Q U O LL D w 0 cn Z a o U Mo & € yyg W x o�y z a oi oil x � m�= w� 0� z a m �a w� z a U W U PROJECT DATE 07142 DRAWN CHECKED AMB CAS REVISED 11/19/2018 SHEET TITLE PRELIMINARY SITE PLAN SHEET pol ORIGINAL SHEET SIZE 24' x 36' Lllluct vllluyc .ncna Access B (Option 1) ✓ �� J :t �j 4 i II August 2018 • . Unsignalized Right-Inl Meridan Road to US 20/26 Section Line Secion B - Looking East _ • + G Locust Grove Road 70' Ultimate ROW per US 20/26 Corridor Study ESMT** p �. Right -Out v� Existing 40' R,/4".' _I Varies W. Existing RoadwGyL=] � 8' to Ultimate South Edge of Pavement •' • • to be Retained per the US 20/26 Corridor Study < 2:�. ' - t Linder AM AM NCayuse Creek Access C: Shoulder 12' 12' 12' 12' 12' `Shoulder 10' Detached Utility Strip Z; Varies Travel Travel Turn Travel Travel Varies Sidewalk & Varies ` Lane Lane Lane Lane Lane 71 Curb , • •Widths and locations to be determined during preliminary design + Buffer . ..Easement or R/W (fee simple) TBD via property owner negotiations Right-In/Right-Out • . Unsignalized Right-Inl ...�..'. e., ` . `j _ • + G 2" ♦ .. '� �`^ `. i. p- .� r�4.i '`f, �.. q - • Linder • Right -Out J ACHD Project i f �, a .� v •' • • FO > . y �3 d Linder Rd: NCayuse Creek Access C: '�►! . . Chinclen tt \ Q F Unsignalized New Collector, , • - Right-In/Right-Out Q o eft n to Qx �turi: . _ • _ • _ .. _ - Westborough Noise Wall11 , E Q New Collector Road* v 2) j Access D: Unsignalized " Full Access PROPOSED a • ' , -�, i R `' • ,,' h (Phase - = A -> • w 1 tirse # y •5 »4a 1 s• r: - ,..._^,-__ «w._. v J ACHD Project i FO Linder Rd: NCayuse Creek to Chinclen tt \ @ , • • 1 1(+ Section C - Looking East E Qnstruction) -- New Collector Road* v a;• iir,c,' Linder Road t0 FOX Run Way Q ,._ Linder Road to US 20/26 Section Line Section A - Looking E-ast a 70' Ultimate ROW 30' ESMT** Mieridan Road 60-70' A c Existing 40' R/W m ROW v i=rieting Roadway 58' to Ultimate South Edge of Pavement o c to be Re.ained per the US 20/26 Corridor Study �, rr �• R ai MIL ( 6' 6.5' Bike Travel Turn Travel Bike Buffer 1 c Shoulder 12' 12' 12' 12' 12' *Shoulder J_ 11 Varies ' Drainage 10' Detached Buffer Lane Lane Lane Lane Lane S, /Curb tTBD� /Curb S, Varies Travel Travel Turn Travel Travel & Clearzone Sidewalk & Varies 4' Buffer/ Sidewalk Sidewalk S ;cUtiliY Lane Lane Lane Lane Lane Strip y P kr 'Per ACHD Policy Man -al U 'Widths and locafions to be determined during pre/iminary design " Easement or R/W (Fee Simple) TSD via property owner negotiations ;:° ��L._ O__- ry.. ha,>. •�;«. __.- _.__ ..:. .: -.a rlf"S' � .�... _. - ILC- .._ _. ..._ — ? Meridian Costco Improvements (Not Included) ­♦ Existing Lane or Lane by Others STAR Phase 1 Conditional Improvements (Optional) New Traffic Signal p A Signal modification Linder Village Deve�oprnent STAR Phase 1 Lane (Conditional on Signal Warrant Evaluation) epiCtj(� of � G°�C�efi e�� ts _ ACHD Improvements STAR Phase 2 Improvements STAR Phase 1 Conditional Lane N (Not Included 2019 Construction) * Not required with Access B Option 2 p New Traffic Signal ® � �l erid� an, G aho STAR Phase 1 Improvements - ITD Improvements (Not included - 2021 Construction) Not required with Fox Run conditional improvements Exhibit