Loading...
PZ - Updated Elevation DrawingsSheet No. Project No. Client Approval: Design Phase: Document Phase: Architect Stamp Issue Date: Drawn By: Checked By: CONSULTANT Revision ID ChID Issue Name Date BUILDING PERSPECTIVES A3.11THIS DRAWING DEPICTS IDEAS, DESIGNS, PLANS, AND DET AILS WHICH ARE PROPRIETARY TO SLICHTER|UGRIN ARCHITECTUR E. THEY WERE CREATED, DESIGNED, AND DEVELOPED FOR USE SOLE LY IN CONNECTION WITH THE PROJECT SHOWN ON THIS DRAWING A ND MAY BE USED ONLY WITH THE PERMISSION OF SLICHTER|UG RIN ARCHITECTURE. NO TRANSFER OF ANY RIGHTS THERETO IS INTENDED OR GRANTED BY DELIVERY HEREOF, AND EXCEPT UPON THE WRITTEN PERMISSION OF SLICHTER|UGRIN ARCHITECTURE. THIS DR AWING IS NOT TO BE DISCLOSED IN ANY WAY FOR PROJECTS OTHER T HAN THE SPECIFIED PROJECT. COPYRIGHT © 2018 SLICHTER|UGRIN ARCHITECTURE 18050 CONDITIONAL USE Print Date: Thursday, September 6, 2018 #Drawn By #Checked By #Issue Date 551 SW 5TH AVE MERIDIAN IDAHO 83642 .EEG OFFICE BLDG SCALE: 1:0.54 1 18 0 5 0 E E G O f f i c e V 5 s c e n e 1 SCALE: 1:0.55 2 18 0 5 0 E E G O f f i c e V 5 s c e n e 2 SCALE: 1:0.46 3 18 0 5 0 E E G O f f i c e V 5 s c e n e 5 AR C H I T E C T U R A L ME T A L W A L L P A N E L AL U M I N U M S T O R E F R O N T FR A M E D W I N D O W S CAST-IN-PLACE ARCHITECTURAL CONCRETE ALUMINUM STOREFRONT ENTRANCE ME T A L R E V E A L T R I M CA S T - I N - P L A C E AR C H I T E C T U R A L CO N C R E T E ARCHITECTURAL METAL WALL PANEL METAL REVEAL TRIM AR C H I T E C T U R A L ME T A L W A L L P A N E L ME T A L R E V E A L T R I M AL U M I N U M S T O R E F R O N T FR A M E D W I N D O W S ME T A L S U N S H A D E ME T A L S U N S H A D E