Loading...
PZ - Preliminary Landscape Details RevisedL K J no G 0 N F 0 N 06- C c 0 E D_ 0 C) D CL rn 0_ U U 70 C 0 a C C � N T L C E T L 0 Q _v B _Q C 0 C) ILL0 0 AN U 0 L_ 0- I KEEP GROUND LINE SAME AS NURSERY LINE REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER MATERIALS FROM THE ROOTBALL WHIGH MAY LIMIT ROOT GROWTH CONSTRUCT 2" EARTH BERM TO FORM A WATER RETENTION BASIN, FILL BERM WITH MULCH, AS SPECIFIED MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER GROWN5 OF PLANTS PROVIDE DEWITT PRO 5 WEED BARRIER FABRIC OR APPROVED EQUAL PROVIDE GOMMERGIAL FERTILIZER TABLETS AND B105TIMULANT, AS SPECIFIED, FOR EACH SHRUB BAGKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SPECIFIED. BAGKFILL IN 6" LIFTS, WATER EACH LAYER, DO NOT TAMP OR OVER COMPACT. 114 v i L. CONSTRUCT 6" MOUND OF TOPSOI L I. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFAGTURER'5 RECOMMENDATIONS TO ALL GROUNDGOVER BEDS. �SHRUB PLANTING 'A' 'A' PLAN VIEW NOT TO SCAL E A = LENGTH, AS SPECIFIED OR PER PLANT 56HEOULE B = 85% OF 'A' FINISH GRADE PER PLANS EDGING, PER PLANS AND DETAILS GROUNDGOVER PLANTING PER PLANTING PLAN NOTES: I. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. 2. APPLY SPEG I F I ED PRE -EMERGENT PER MANUFAGTURER'5 REGOMMENDATI ONS TO ALL GROUNDCOVER BEDS. PERENNIAL & GROUNDCOVER PLANTING NOT -0 _)A_= PTH OF MULCH AT -ER BEDS APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED FINISH GRADE, \-GUT EDGE PER PLANS PLANTER BED CUT EDGE 3 (TYPICAL AT TREES IN TURF AREAS) HOT TO SGAL WHEN PRESENT: BUD POINT (A MINOR ROOT FLARE/COLLAR (SWELLING AT CROOK IN THE TRUNK SOIL LINE WHERE STEM TISSUE JUST ABOVE THE TRANSITIONS INTO ROOT TISSUE) TO SOIL LINE) TO BE BE AT SOIL LINE. APPROXIMATELY 0/2" ABOVE THE SOIL ROOT PROBE LINE SOIL LIN r u N s c HIGHEST ROOT SHALL BE 2" MAXIMUM BELOW SOIL LINE. UTILIZE SOIL/ROOT fig` PROBE AROUND TRUNK (APPROX 1"-2" AWAY FROM TRUNK) T0005 ATE HIGHEST n n / z Of Q 0 w � J U U 0 z V) Q ir) m oil PREVAILING WIND DIRECTION REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL 50GIETY OF ARBORIGULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLAGED. DO NOT REMOVE MAIN LEADERII RUBBER CINCH TIE 2"x 2" WOOD STAKE (LENGTH AS REQUIRED) -DO NOT PENETRATE ROOTBALL. SEE NOTE I. SET STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTEGTION, AFTER INSTALLATION CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING W/ MULCH, AS SPECIFIED. 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY FROM TRUNK. REMOVE BURLAP, TWINE, AND WIRE o FINISH GRADE BASKET FROM TOP w OF ROOTBALL, N �` \/j\//\////\// \ //� //\///// GOMMERGIAL SLOW RELEASE REMOVE ALL NAILS, Q w \\�/j�/j FERTILIZER TABLETS TIES, AND PLASTIC \ \ \ \\ \\/ // /��/\� FROM ROOTBALL. IF -III _ _ SIDES OF HOLE ROUGH $ UNEVEN SYNTHETIC BURLAP IS =I III- / -III= 1I UTILIZED TO WRAP BAGKFILL HITH -III-III AND SOIL AMENDMENTS AS TOPSOIL THE ROOTBALL, IT - SHALL BE , . .-. . ISPECIFIED. BACKFILL IN 6" LIFTS, = I I , , COMPLETELY WIDTH WIDTH WIDTH WIDTH WIDTH WATER EACH LAYER, TAMP REMOVED. ONLY OF BALL OF BALL OF BALL OF BALL OF BALL LIGHTLY AS REQUIRED, BAGKFILL BIODEGRADABLE 5' MIN. DIA. SOIL EVEN W/ TOP OF ROOTBALL, BURLAP SHALL BE TREE RING DO NOT OVER GOMPAGTII LEFT ON THE BOTTOM SET ROOTBALL ON NATIVE, OF THE ROOTBALL. NOTES: UNDISTURBED SOIL I. THE STAKING OF TREES IS TO BE THE GONTRAGTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR I YEAR AFTER SUBSTANTIAL COMPLETION WHIGHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSGAPE ARCHITECT BEFORE PROGEEDING. 3. LANDSCAPE CONTRACTOR 15 TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER GINGH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWIGE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 7. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-O" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF GURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL AGENGY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. DELI DUOU�ST�R EE PLANTING4NOT TO SCALE IRRIGATION NOTES: I. ALL LAN05GAPED AREAS SHALL HAVE AN AUTOMATIC, UNDERGROUND SPRINKLER SYSTEM WHIGH INSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. 2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO -ZONES. 3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INGHES AT LAWN AREAS AND 18" AT PLANTER BEDS. 4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, PERENNIALS GROUND COVERS OR SHRUB MA55IN65 SHALL HAVE A POP-UP SPRAY SYSTEM. 5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS: a. PREGI5E INDIVIDUAL STATION TIMING b. RUN TIME GAPABILITIE5 FOR EXTREMES IN PRECIPITATION RATES c. AT LEAST ONE PROGRAM FOR EACH HYDROZONE d. SUFFIGIENT MULTIPLE GYGLE5 TO AVOID WATER RUN-OFF e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. 6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. 7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD GOVERAGE WITH TRIANGULAR 5PAGING. 8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVER5PRAY ONTO IMPERVIOUS SURFACES (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS). q. PROVIDE MINIMUM (1) QUIGK COUPLER VALVE PER EACH ((b) AUTOMATIC VALVE ZONES. APPROVE Q.G.V. LOCATIONS WITH LANDSCAPE ARCHITECT. LANDSCAPE PLAN NOTES 1. GONTRAGTOR TO VERIFY LOCATION OF ALL UTILITIES PRIOR TO INITIATION OF ANY DEMOLITION OR CONSTRUCTION OPERATIONS. ANY DAMAGE TO EXISTING UTILITIES SHALL BE CONTRACTOR'S RESPONSIBILITY. 2. ALL PLAN MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN ASSOCIATION OF NURSERYMAN'S NATIONAL STANDARD SPECIFICATIONS. 3. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS AND CONTRACT SPECIFICATIONS. 4. CONTRACTOR SHALL COORDINATE PLANTING WITH IRRIGATION CONTRACTOR. 5. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. 6. REFER TO MATERIALS PLAN FOR EXTENT OF SEEDING, SODDING, RIVER ROCK, AND BARK PLACEMENT. 7. REFER TO SHEET LLOO FOR PROJECT PHASING, ALTERNATES, AND COORDINATION WITH WORK BY OTHERS. 5. IN THE EVENT OF A PLANT COUNT 0156REPANGY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES AND SYMBOL NUMBERS. 6. IN THE EVENT OF A DISGREPANGY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 7. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL AGHD STORM DRAIN PIPE, STRUCTURES, OR FACILITIES. 8. SEEPAGE BEDS AND OTHER STORM DRAINAGE FAGILITIE5 MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE GON5TRU6TION AND INSTALLATION OF THE LANDSGAPE IRRIGATION SYSTEM. 1 1 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 1 11 1 12 RIOINAL SURVEY ON FILE AT IDAHO SURVEY TOPSOIL NOTES I. TOPSOIL REQUIREMENTS: ASTM D 5268, PH RANGE OF 5.5 TO 7, FOUR PERCENT ORGANIG MATERIAL MINIMUM, FREE OF STONES 1/2 INGH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. 2. TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL SHALL BE FERTILE, FRIABLE, NATURAL LOAM, SURFAGE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, ORGANIC, MATTER LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC, MATTER HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE 5GREENED TO ACHIEVE THIS REQUIREMENT. 3. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A REGOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND GOPIE5 OF THE TESTING AGENGY'5 FINDINGS AND RECOMMENDATION5 SHALL BE FURNISHED TO THE ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. ALL TOPSOIL SHALL BE AMENDED TO ACHIEVE SPEGIFIED PH AND ORGANIG REQUIREMENTS. RE -TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO TOPSOIL SHALL BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION. 4. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL DURING DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED FINISH GRADE, AS REQUIRED. 5. GOMPAGTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS: A. LAWN AREAS: q INCHES MINIMUM OR AS NECESSARY TO ACHIEVE EVEN GRADES WITH SURROUNDING LAWN AREAS. B. PLANTER BEDS: IS INCHES MINIMUM 6. FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. FINISH GRADE OF TOPSOIL SHALL BE 2" BELOW FINISH GRADE OF PAVEMENTS AREAS FOR SOD AND I" FOR SEED. 7. TOPSOIL 5TOGKPILE LOCATIONS TO BE GOVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL PLAN. 8. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR TEMPORARILY PLACED IN PROPOSED LANDSCAPE AREAS TO PREVENT LANDSGAPE AREAS FROM BEING CONTAMINATED WITH ROCK MATERIALS. CONTRACTOR SHALL SUBMIT A DETAILED STOCKPILE PLAN TO LANDSCAPE ARGHITEGT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. LANDSCAPE AREA PREPARATION NOTES: I. LIMIT TURF SUBGRADE PREPARATION TO AREAS TO BE PLANTED. 2. NEWLY GRADED 5UB6RA0E5: LOOSEN SUBGRADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. A. SPREAD PLANTING SOIL TO A DEPTH OF 12 INGHES IN TURF AREAS AND 15 INGHES AT SHRUB BED AREAS BUT NOT LESS THAN REQUIRED TO MEET FINISH GRADES AFTER LIGHT ROLLING AND NATURAL SETTLEMENT. DO NOT SPREAD IF PLANTING SOIL OR SUBGRADE IS FROZEN, MUDDY, OR EXCESSIVELY NET. B. SPREAD PLANTING SOIL OVER LOOSENED SUBGRADE. G. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THIGKNESS OF SOD OR SEED. 3. UNCHANGED 5UB6RADE5: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXGAVATING, GRADING, OR SURFACE -SOIL STRIPPING OPERATIONS, PREPARE SURFACE SOIL AS FOLLOWS: A. REMOVE EXISTING GRASS, VEGETATION, AND TURF. DO NOT MIX INTO SURFACE SOIL. B. LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. PROVIDE WEED ABATEMENT PROCEDURE. APPLY SOIL AMENDMENTS AND FERTILIZERS AGGORDING TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INCHES OF SOIL. TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. G. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. D. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, TRASH, AND OTHER EXTRANEOUS MATTER. E. LEGALLY DISPOSE OF WASTE MATERIAL, INCLUDING GRASS, VEGETATION, AND TURF, OFF OWNER'S PROPERTY. 4. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. GRADE TO WITHIN PLUS OR MINUS 1/2 INCH OF FINISH ELEVATION. ROLL AND RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH GRADING TO AREAS THAT CAN BE PLANTED IN THE IMMEDIATE FUTURE. 5. MOISTEN PREPARED AREA BEFORE PLANTING IF SOIL IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. 6. BEFORE PLANTING, OBTAIN LANDSCAPE ARGHITEGT'S ACCEPTANCE OF FINISH GRADING; RESTORE PLANTING AREAS IF ERODED OR OTHERWISE DISTURBED AFTER FINISH GRADING. 7. DO NOT SOW IMMEDIATELY FOLLOWING RAIN, OR WHEN GROUND IS TOO DRY. TEMPERATURE SHALL BE BETWEEN 55 F AND q5 F FOR A 24 HOUR PERIOD. WIND SHALL BE LESS THAN 5 MPH. TURF AREA PREPARATION NOTES: I. LIMIT TURF SUBGRADE PREPARATION TO AREAS TO BE PLANTED. 2. NEWLY GRADED SUBGRADES: LOOSEN SUBGRADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES LARGER THAN I INGH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. 3. SPREAD PLANTING SOIL OVER LOOSENED SUBGRADE. 4. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THICKNESS OF SOD. 5. UNCHANGED SUBGRADE5: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXGAVATING, GRADING, OR 5URFAGE-50IL STRIPPING OPERATIONS, PREPARE SURFACE SOIL AS FOLLOWS: A. REMOVE EXISTING GRASS, VEGETATION, AND TURF. DO NOT MIX INTO SURFACE SOIL. B. LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. APPLY SOIL AMENDMENTS AND FERTILIZERS AGGORDING TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INGHES OF SOIL. TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. 6. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. A. REMOVE STONES LARGER THAN I INGH IN ANY DIMENSION AND STICKS, ROOTS, TRASH, AND OTHER EXTRANEOUS MATTER. B. LEGALLY DISPOSE OF WASTE MATERIAL, INCLUDING GRASS, VEGETATION, AND TURF, OFF OWNER'S PROPERTY. 7. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFAGE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. GRADE TO WITHIN PLUS OR MINUS 1/2 INGH OF FINISH ELEVATION. ROLL AND RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH GRADING TO AREAS THAT GAN BE PLANTED IN THE IMMEDIATE FUTURE. 8. MOISTEN PREPARED AREA BEFORE PLANTING IF SOIL IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. q. BEFORE PLANTING, OBTAIN LANDSGAPE ARCHITECT'S AGGEPTANGE OF FINISH GRADING; RESTORE PLANTING AREAS IF ERODED OR OTHERWISE DISTURBED AFTER FINISH GRADING. WEED ABATEMENT NOTES: I. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO PLANTING OR HYDR05EEDIN6. 2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEE05 WITH GROUND -UP& (GONTAGT HERBICIDE) OR APPROVED EQUAL. 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. 5. APPLY SECOND APPLICATION OF ®ROUND -UP& TO ALL EXPOSED WEEDS. APPLY IN 5TRIGT CONFORMANCE WITH MANUFACTURER'S 5PE6IFIGATION5 AND IN5TRUGTION5. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE. 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. 7. AT THE TIME OF PLANTING AND HYDR05EEDIN6, ALL PLANTING AREAS SHALL BE WEED FRee. 13 1 14 1 15 1 16 P PRELIMINARY NOT FOR CONSTRUCTION o N 2 0 0 ir Q N to L) '6 E 'cDCO �) c L a>QoE(D� m QC,' oo�e 0r, r a Cb cu LU .co 6 N o ca 0 z C 0 N UJ W Ur J 3 cc -r- rD1 CL CIE [LO Copyright © 2018 All rights reserved. Reproduction or use in any form or by any means without written permission of Breckon Land Design, Inc. is unlawful and subject to criminal prosecution. D i WOC=W fA Q�'W yma000� \ aZ y 5;Uz0W-wow AIA/ = �z 1�wLU �\//1111//I/ m;