CC - Costco Roads ImprovementsCMNOL
CMNOL
R-8
R1
R-8
R-4
R-4
C-C
R-8R-8
L-O
R-4
C-G
L-O
RUT
L-O
L-O
L-O
C-C
R-15
R-8
C-N
C-C
R-8
C-G
C-C
R-2
R-8
R-4
R-15 R-4
R1
R-4
C-G
M1
R-8
RUT
R-15R-15
R-8
RUT
RUT
RUT
R-8
C-N
R-15
R-2
RUT
C-N
R-15
L-O
C-N
R-4
L I N D E
R
MC MI L LA N
H W Y 1 6
CHI N D E N
T E N M
I
L E
M C D E R M O T T
B L A C
K C A
T
Costco Road way Impr ovements [
Legend
Parc els
Road Im provements
Required, widen to 4/5 lanes prior to any C.O.
CMNOL Required, signalize intersection prior to any C.O.
Pledge, widen to 4 lanes (see note)
0 10.5 Miles
The information shown on this map is compiled from varioussources and is subject to constant revision. The City of Meridianmakes no warranty or guarantee as to the content, accuracy,timeliness, or completeness of any of the data provided, andassumes no legal responsibility for the information contained
Print Date: 3/28/2018User: bmcc lure
Note:If within two(2) years of issuance of theCertificate of Occ upancy for the Costco building, ITDhas obtained necessary right-of-way, SH20-26/WChinden Blvd will be widend to four (4) lanes from N.Tree Farm Way to SH-16.