Loading...
PZ - Preliminary Landscape Details111 L 11 J I G 0 0 F 00 0 a a� u� E 0 0 0 a 2 0 D _0 W Q 0 U co U 0 T C E C � o_. N S" 0 cu 0 Q r0 B� cr) c 0 if U Lo a` 0 AN U a� 0 s_ Q_ I 6i 1 2 3 4 11 ■ NOT TO SCALE A = LENGTH, AS SPECIFIED OR PER PLANT SGHEDULE B = 855Y OF 'A' FINISH GRADE PER PLANS EDGING, PER PLANS AND DETAILS 6ROUNDGOVER PLANTING PER PLANTING PLAN MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER GROWNS OF PLANTS SPLIT ALL ROOT BOUND ROOTS WITH 3 EQUAL SPACED VERTICAL GUTS. TILL SOIL TO A DEPTH OF 12", BAGKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SPEGIFIED. DEWITT PRO 5 WEED BARRIER FABRIC, OR APPROVED EQUAL NOTES: 5UB6RADE 1. ALL GROUNDGOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL 6ROUNDGOVER BEDS. PERENNIAL & GROUNDCOVER PLANTING NOT -, " -PTH OF MULCH AT FER BEDS APPROVED TOPSOIL AND SOIL FINISH GRADE, AMENDMENTS AS SPECIFIED PER PLANS GUT EDGE 3 PLANTER BED CUT EDGE (TYPICAL AT TREES IN TURF AREAS) 5 0 7 NOT TO SCALE 0 WHEN PRESENT: BUD POINT (A MINOR ROOT FLARE/GOLLAR (SWELLING AT CROOK IN THE TRUNK SOIL LINE WHERE STEM TISSUE JUST ABOVE THE TRANSITIONS INTO ROOT TISSUE) TO SOIL LINE) TO BE BE AT SOIL LINE. APPROXIMATELY I Y2" ABOVE THE SOIL ROOT PROBE LINE SOIL LINE N o s G HIGHEST ROOT SHALL BE 2" MAXIMUM BELOW SOIL LINE. UTILIZE SOIL/ROOT �4 PROBE AROUND r TRUNK (APPROX 1"-2" AWAY FROM TRUNK) ROOTS.TO 0ATE HIGHEST _ n n / z af 0 Q O w 0 J U U � O z N Q in m ■ti PREVAILING WIND DIRECTION REMOVE DEAD/DAMAGED BRANGHE5 AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORIGULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARGHITEGT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN LEADERII RUBBER GINGH TIE 2"x 2" WOOD STAKE (LENGTH AS REQUIRED) -DO NOT PENETRATE ROOTBALL. SEE NOTE I. SET STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING W/ MULCH, AS SPECIFIED. 3" THICK MULCH LAYER, KEEP MULCH REMOVE BURLAP, 3" AWAY FROM TRUNK. TWINE, AND WIRE FINISH GRADE BASKET FROM TOP �w OF ROOTBALL, COMMERCIAL SLOW RELEASE REMOVE ALL NAILS, FERTILIZER TABLETS TIES, AND PLASTIC FROM ROOTBALL. IF N =III 1 / _ - SIDES OF HOLE ROUGH 4 UNEVEN SYNTHETIC BURLAP IS III /I =1 1= - .._: = - - BAGKFILL WITH APPROVED TOPSOIL UTILIZED TO WRAP AND SOIL AMENDMENTS AS THE ROOTBALL, IT III -i 1 -III- -III SHALL BE SPECIFIED. BAGKFILL IN 6" LIFTS, "' "' COMPLETELY WIDTH WIDTH WIDTH WIDTH WIDTH WATER EACH LAYER, TAMP REMOVED. ONLY OF BALL OF BALL OF BALL OF BALL OF BALL L16HTLY AS REQUIRED, BAGKFILL BIODEGRADABLE Ir 7 Ir 5' MIN. DIA. SOIL EVEN W/ TOP OF ROOTBALL, BURLAP SHALL BE TREE RING DO NOT OVER GOMPAGTII LEFT ON THE BOTTOM OF THE ROOTBALL. SET ROOTBALL ON NATIVE, NOTES: UNDISTURBED SOIL I. THE STAKING OF TREES IS TO BE THE GONTRAGTOR'5 OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR I YEAR AFTER SUBSTANTIAL COMPLETION WHIGHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARGHITEGT BEFORE PROGEEDIN6. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSGAPE ARGHITEGT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR F16URE EI6HT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SL I PPA6E. 5. WATER TREE TWIGE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARGHITEGT IMMEDIATELY. 7. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL A6ENGY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. DECIDUOUS TREE PLANTING 4 NOT TO SCALE IRRIGATION NOTES: I. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDER6ROUND SPRINKLER SYSTEM WHIGH INSURES COMPLETE GOVERA&E AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. 2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO -ZONES. 3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS AND 18" AT PLANTER BEDS. 4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, PERENNIALS GROUND COVERS OR SHRUB MA55IN65 SHALL HAVE A POP-UP SPRAY SYSTEM. 5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS: a. PREGI5E INDIVIDUAL STATION TIMING b. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES c. AT LEAST ONE PR06RAM FOR EACH HYDROZONE d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE DE516NED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. 6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. 7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD GOVERA&E WITH TRIANGULAR 5PAGIN6. 8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVER5PRAY ONTO IMPERVIOUS 5URFAGE5 (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS). G. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE Q.G.V. LOCATIONS WITH LANDSGAPE ARGHITEGT. LANDSCAPE PLAN NOTES I. CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES PRIOR TO INITIATION OF ANY DEMOLITION OR GON5TRUGTION OPERATIONS. ANY DAMAGE TO EXISTING UTILITIES SHALL BE GONTRAGTOR'5 RESPONSIBILITY. 2. ALL PLAN MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN A550GIATION OF NURSERYMAN'S NATIONAL STANDARD SPECIFICATIONS. 3. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS AND CONTRACT 5PEGIFIGATION5. 4. CONTRACTOR SHALL COORDINATE PLANTING WITH IRRIGATION CONTRACTOR. 5. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARGHITEGT. 6. REFER TO MATERIALS PLAN FOR EXTENT OF SEEDING, SODDING, RIVER ROCK, AND BARK PLACEMENT. 7. REFER TO SHEET LI.00 FOR PROJECT PHASING, ALTERNATES, AND COORDINATION WITH WORK BY OTHERS. 5. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES AND SYMBOL NUMBERS. 6. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARGHITEGT IMMEDIATELY. 7. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL AGHD STORM DRAIN PIPE, STRUCTURES, OR FACILITIES. 8. SEEPAGE BEDS AND OTHER STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. 9 I 10 1 11 1 12 IGINAL SURVEY ON FILE AT IDAF-I TOPSOIL NOTES I. TOPSOIL REQUIREMENTS: ASTM D 5268, PH RANGE OF 5.5 TO -f, FOUR PERCENT OR6ANIG MATERIAL MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. 2. TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL SHALL BE FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, ORGANIC MATTER LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC, MATTER HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT. 3. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A REGO6NIZED GOMMERGIAL OR GOVERNMENT A6ENGY AND GOPIE5 OF THE TESTING A6EN6Y'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. ALL TOPSOIL SHALL BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIG REQUIREMENTS. RE -TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO TOPSOIL SHALL BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION. 4. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL DURING DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED FINISH GRADE, AS REQUIRED. 5. GOMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS: A. LAWN AREAS: cl INCHES MINIMUM OR AS NEGE55ARY TO ACHIEVE EVEN GRADES WITH SURROUNDING LAWN AREAS. B. PLANTER BEDS: 18 INCHES MINIMUM 6. FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFAGE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. FINISH GRADE OF TOPSOIL SHALL BE 2" BELOW FINISH GRADE OF PAVEMENTS AREAS FOR SOD AND I" FOR SEED. 7. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL PLAN. 8. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO 6RAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR TEMPORARILY PLACED IN PROPOSED LANDSCAPE AREAS TO PREVENT LANDSCAPE AREAS FROM BEING CONTAMINATED WITH ROCK MATERIALS. CONTRACTOR SHALL SUBMIT A DETAILED STOCKPILE PLAN TO LANDSCAPE ARGHITEGT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. LANDSCAPE AREA PREPARATION NOTES: I. LIMIT TURF 5UBORADE PREPARATION TO AREAS TO BE PLANTED. 2. NEWLY GRADED 5UB6RADE5: LOOSEN 5UB6RADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. A. SPREAD PLANTING SOIL TO A DEPTH OF 12 INCHES IN TURF AREAS AND 18 INCHES AT SHRUB BED AREAS BUT NOT LESS THAN REQUIRED TO MEET FINISH GRADES AFTER LIGHT ROLLING AND NATURAL SETTLEMENT. DO NOT SPREAD IF PLANTING SOIL OR SUB6RADE IS FROZEN, MUDDY, OR EXGE551VELY NET. B. SPREAD PLANTING 501L OVER LOOSENED 5UB6RADE. G. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THIGKNESS OF 500 OR SEED. 3. UNCHANGED 5UB6RADE5: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXGAVATIN6, 6RADIN6, OR SURFAGE-SOIL STRIPPING OPERATIONS, PREPARE SURFACE SOIL AS FOLLOWS: A. REMOVE EXI5TIN6 GRASS, VEGETATION, AND TURF. DO NOT MIX INTO SURFAGE SOIL. B. LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. PROVIDE WEED ABATEMENT PROCEDURE. APPLY SOIL AMENDMENTS AND FERTILIZERS AGGORDIN6 TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INCHES OF SOIL. TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. G. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. D. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, TRASH, AND OTHER EXTRANEOUS MATTER. E. LEGALLY DISPOSE OF WASTE MATERIAL, INGLUDIN6 GRASS, VEGETATION, AND TURF, OFF OWNER'S PROPERTY. 4. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. 6RADE TO WITHIN PLUS OR MINUS 1/2 INCH OF FINISH ELEVATION. ROLL AND RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH 6RADIN6 TO AREAS THAT GAN BE PLANTED IN THE IMMEDIATE FUTURE. 5. MOISTEN PREPARED AREA BEFORE PLANTING IF SOIL IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. 6. BEFORE PLANTING, OBTAIN LANDSGAPE ARGHITEGT'S ACCEPTANCE OF FINISH 6RADIN6; RESTORE PLANTING AREAS IF ERODED OR OTHERWISE DISTURBED AFTER FINISH 6RADIN6. 7. DO NOT SOW IMMEDIATELY FOLLOWING RAIN, OR WHEN GROUND 15 TOO DRY. TEMPERATURE SHALL BE BETWEEN 55 F AND C,5 F FOR A 24 HOUR PERIOD. WIND SHALL BE LESS THAN 5 MPH. TURF AREA PREPARATION NOTES: I. LIMIT TURF SUB&RADE PREPARATION TO AREAS TO BE PLANTED. 2. NEWLY GRADED 5UB6RADE5: LOOSEN 5UB6RADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. 3. SPREAD PLANTING SOIL OVER LOOSENED SUB6RADE. 4. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THIGKNESS OF SOD. 5. UNGHAN&ED 5UB6RADE5: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXGAVATIN6, 6RADIN6, OR SURFAGE-SOIL STRIPPING OPERATIONS, PREPARE SURFACE SOIL AS FOLLOWS: A. REMOVE EXI5TIN6 GRASS, VEGETATION, AND TURF. DO NOT MIX INTO SURFAGE SOIL. B. LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. APPLY SOIL AMENDMENTS AND FERTILIZERS AGGORDIN6 TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INCHES OF SOIL. TILL 501L TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. 6. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. A. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND 5TIGK5, ROOTS, TRASH, AND OTHER EXTRANEOUS MATTER. B. LEGALLY DISPOSE OF WASTE MATERIAL, INGLUDIN6 GRASS, VEGETATION, AND TURF, OFF OWNER'S PROPERTY. 7. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. 6RADE TO WITHIN PLUS OR MINUS 1/2 INCH OF FINISH ELEVATION. ROLL AND RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH GRADING TO AREAS THAT GAN BE PLANTED IN THE IMMEDIATE FUTURE. 8. MOISTEN PREPARED AREA BEFORE PLANTING IF 501L IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. 9. BEFORE PLANTING, OBTAIN LANDSGAPE ARGHITEGT'S ACCEPTANCE OF FINISH GRADING; RESTORE PLANTING AREAS IF ERODED OR OTHERWISE DISTURBED AFTER FINISH GRAD I N6. WEED ABATEMENT NOTES: I. ALL AREAS TO BE PLANTED OR HYDR05EEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO PLANTING OR HYDROSEEDIN6. 2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH ©ROUND-UPA (GONTAGT HERBICIDE) OR APPROVED EQUAL. 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. 4. CONTRACTOR SHALL OPERATE THE AUTOMATIG IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. 5. APPLY SECOND APPLICATION OF (DROUND-UPA TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE. 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. 7. AT THE TIME OF PLANTING AND HYDROSEEDIN6, ALL PLANTING AREAS SHALL BE WEED FRee. 13 1 14 1 15 1 16 RVEY GROUP PRELIMINARY NOT FOR CONSTRUCTION M o N a) cc C U r1^ jo u Cj C (� .2 C L•n +> L' ac'``6-' a ml0 om 0) E o a0n 3 0 C o .- C C L oE'-a, cc a CO aa) < m E a) c c [p � CD ,3 u� o r- = 2 .2 _ N lb N O U LU Q(V-0 -00 iv z > c o c .°' c 3 Cu c U�w`C� �-. 3 mL � `m Copyright © 2018 All rights reserved. Reproduction or use in any form or by any means without written permission of "eckon Land Design, Inc. is unlawful and subject to criminal prosecution. aLU�W 0, 0 ox W LOL. LS Nma0DOJ LL Z CA (9W3V� m>o>aom Nc aSZE ,<Do MW .J OX v REVISIONS Date Description PROJECT NO.: 17216 DRAWN BY: LID CHECKED BY: JB, MSD DATE: 2/08/18 SHEET NUMBER PP2.5 KEEP GROUND LINE SAME AS NURSERY LINE ///",-REMO\/E ANY PLASTIC, BURLAP, NAILS, OR OTHER MATERIALS FROM THE ROOTBALL WHIGH MAY LIMIT ROOT GROWTH CONSTRUCT 2" EARTH BERM TO FORM A WATER RETENTION BASIN, FILL BERM WITH MULCH, AS SPECIFIED MULGH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER GROWN5 OF PLANTS . PROVIDE DEWITT PRO 5 WEED BARRIER L : L FABRIC OR APPROVED EQUAL I;� III PROVIDE GOMMERGIAL FERTILIZER TABLETS AND BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB =III -III BAGKFILL WITH APPROVED TOPSOIL AND WIDTH OF SOIL AMENDMENTS, AS SPECIFIED. BAGKFILL 6" ROOTBALL 6'> IN b" LIFTS, WATER EACH LAYER, DO NOT TAMP OR OVER COMPACT. TE: GON5TRUGT 6" MOUND OF TOPSOIL WATER SHRUB TWIGE WITHIN FIRST 24 HOURS. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL 6ROUNDGOVER BEDS. \ SHRUB PLANTING NOT TO SCALE A = LENGTH, AS SPECIFIED OR PER PLANT SGHEDULE B = 855Y OF 'A' FINISH GRADE PER PLANS EDGING, PER PLANS AND DETAILS 6ROUNDGOVER PLANTING PER PLANTING PLAN MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER GROWNS OF PLANTS SPLIT ALL ROOT BOUND ROOTS WITH 3 EQUAL SPACED VERTICAL GUTS. TILL SOIL TO A DEPTH OF 12", BAGKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SPEGIFIED. DEWITT PRO 5 WEED BARRIER FABRIC, OR APPROVED EQUAL NOTES: 5UB6RADE 1. ALL GROUNDGOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL 6ROUNDGOVER BEDS. PERENNIAL & GROUNDCOVER PLANTING NOT -, " -PTH OF MULCH AT FER BEDS APPROVED TOPSOIL AND SOIL FINISH GRADE, AMENDMENTS AS SPECIFIED PER PLANS GUT EDGE 3 PLANTER BED CUT EDGE (TYPICAL AT TREES IN TURF AREAS) 5 0 7 NOT TO SCALE 0 WHEN PRESENT: BUD POINT (A MINOR ROOT FLARE/GOLLAR (SWELLING AT CROOK IN THE TRUNK SOIL LINE WHERE STEM TISSUE JUST ABOVE THE TRANSITIONS INTO ROOT TISSUE) TO SOIL LINE) TO BE BE AT SOIL LINE. APPROXIMATELY I Y2" ABOVE THE SOIL ROOT PROBE LINE SOIL LINE N o s G HIGHEST ROOT SHALL BE 2" MAXIMUM BELOW SOIL LINE. UTILIZE SOIL/ROOT �4 PROBE AROUND r TRUNK (APPROX 1"-2" AWAY FROM TRUNK) ROOTS.TO 0ATE HIGHEST _ n n / z af 0 Q O w 0 J U U � O z N Q in m ■ti PREVAILING WIND DIRECTION REMOVE DEAD/DAMAGED BRANGHE5 AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORIGULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARGHITEGT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN LEADERII RUBBER GINGH TIE 2"x 2" WOOD STAKE (LENGTH AS REQUIRED) -DO NOT PENETRATE ROOTBALL. SEE NOTE I. SET STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING W/ MULCH, AS SPECIFIED. 3" THICK MULCH LAYER, KEEP MULCH REMOVE BURLAP, 3" AWAY FROM TRUNK. TWINE, AND WIRE FINISH GRADE BASKET FROM TOP �w OF ROOTBALL, COMMERCIAL SLOW RELEASE REMOVE ALL NAILS, FERTILIZER TABLETS TIES, AND PLASTIC FROM ROOTBALL. IF N =III 1 / _ - SIDES OF HOLE ROUGH 4 UNEVEN SYNTHETIC BURLAP IS III /I =1 1= - .._: = - - BAGKFILL WITH APPROVED TOPSOIL UTILIZED TO WRAP AND SOIL AMENDMENTS AS THE ROOTBALL, IT III -i 1 -III- -III SHALL BE SPECIFIED. BAGKFILL IN 6" LIFTS, "' "' COMPLETELY WIDTH WIDTH WIDTH WIDTH WIDTH WATER EACH LAYER, TAMP REMOVED. ONLY OF BALL OF BALL OF BALL OF BALL OF BALL L16HTLY AS REQUIRED, BAGKFILL BIODEGRADABLE Ir 7 Ir 5' MIN. DIA. SOIL EVEN W/ TOP OF ROOTBALL, BURLAP SHALL BE TREE RING DO NOT OVER GOMPAGTII LEFT ON THE BOTTOM OF THE ROOTBALL. SET ROOTBALL ON NATIVE, NOTES: UNDISTURBED SOIL I. THE STAKING OF TREES IS TO BE THE GONTRAGTOR'5 OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR I YEAR AFTER SUBSTANTIAL COMPLETION WHIGHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARGHITEGT BEFORE PROGEEDIN6. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSGAPE ARGHITEGT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR F16URE EI6HT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SL I PPA6E. 5. WATER TREE TWIGE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARGHITEGT IMMEDIATELY. 7. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL A6ENGY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. DECIDUOUS TREE PLANTING 4 NOT TO SCALE IRRIGATION NOTES: I. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDER6ROUND SPRINKLER SYSTEM WHIGH INSURES COMPLETE GOVERA&E AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. 2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO -ZONES. 3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS AND 18" AT PLANTER BEDS. 4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, PERENNIALS GROUND COVERS OR SHRUB MA55IN65 SHALL HAVE A POP-UP SPRAY SYSTEM. 5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS: a. PREGI5E INDIVIDUAL STATION TIMING b. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES c. AT LEAST ONE PR06RAM FOR EACH HYDROZONE d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE DE516NED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. 6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. 7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD GOVERA&E WITH TRIANGULAR 5PAGIN6. 8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVER5PRAY ONTO IMPERVIOUS 5URFAGE5 (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS). G. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE Q.G.V. LOCATIONS WITH LANDSGAPE ARGHITEGT. LANDSCAPE PLAN NOTES I. CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES PRIOR TO INITIATION OF ANY DEMOLITION OR GON5TRUGTION OPERATIONS. ANY DAMAGE TO EXISTING UTILITIES SHALL BE GONTRAGTOR'5 RESPONSIBILITY. 2. ALL PLAN MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN A550GIATION OF NURSERYMAN'S NATIONAL STANDARD SPECIFICATIONS. 3. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS AND CONTRACT 5PEGIFIGATION5. 4. CONTRACTOR SHALL COORDINATE PLANTING WITH IRRIGATION CONTRACTOR. 5. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARGHITEGT. 6. REFER TO MATERIALS PLAN FOR EXTENT OF SEEDING, SODDING, RIVER ROCK, AND BARK PLACEMENT. 7. REFER TO SHEET LI.00 FOR PROJECT PHASING, ALTERNATES, AND COORDINATION WITH WORK BY OTHERS. 5. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES AND SYMBOL NUMBERS. 6. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARGHITEGT IMMEDIATELY. 7. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL AGHD STORM DRAIN PIPE, STRUCTURES, OR FACILITIES. 8. SEEPAGE BEDS AND OTHER STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. 9 I 10 1 11 1 12 IGINAL SURVEY ON FILE AT IDAF-I TOPSOIL NOTES I. TOPSOIL REQUIREMENTS: ASTM D 5268, PH RANGE OF 5.5 TO -f, FOUR PERCENT OR6ANIG MATERIAL MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. 2. TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL SHALL BE FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, ORGANIC MATTER LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC, MATTER HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT. 3. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A REGO6NIZED GOMMERGIAL OR GOVERNMENT A6ENGY AND GOPIE5 OF THE TESTING A6EN6Y'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. ALL TOPSOIL SHALL BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIG REQUIREMENTS. RE -TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO TOPSOIL SHALL BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION. 4. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL DURING DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED FINISH GRADE, AS REQUIRED. 5. GOMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS: A. LAWN AREAS: cl INCHES MINIMUM OR AS NEGE55ARY TO ACHIEVE EVEN GRADES WITH SURROUNDING LAWN AREAS. B. PLANTER BEDS: 18 INCHES MINIMUM 6. FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFAGE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. FINISH GRADE OF TOPSOIL SHALL BE 2" BELOW FINISH GRADE OF PAVEMENTS AREAS FOR SOD AND I" FOR SEED. 7. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL PLAN. 8. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO 6RAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR TEMPORARILY PLACED IN PROPOSED LANDSCAPE AREAS TO PREVENT LANDSCAPE AREAS FROM BEING CONTAMINATED WITH ROCK MATERIALS. CONTRACTOR SHALL SUBMIT A DETAILED STOCKPILE PLAN TO LANDSCAPE ARGHITEGT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. LANDSCAPE AREA PREPARATION NOTES: I. LIMIT TURF 5UBORADE PREPARATION TO AREAS TO BE PLANTED. 2. NEWLY GRADED 5UB6RADE5: LOOSEN 5UB6RADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. A. SPREAD PLANTING SOIL TO A DEPTH OF 12 INCHES IN TURF AREAS AND 18 INCHES AT SHRUB BED AREAS BUT NOT LESS THAN REQUIRED TO MEET FINISH GRADES AFTER LIGHT ROLLING AND NATURAL SETTLEMENT. DO NOT SPREAD IF PLANTING SOIL OR SUB6RADE IS FROZEN, MUDDY, OR EXGE551VELY NET. B. SPREAD PLANTING 501L OVER LOOSENED 5UB6RADE. G. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THIGKNESS OF 500 OR SEED. 3. UNCHANGED 5UB6RADE5: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXGAVATIN6, 6RADIN6, OR SURFAGE-SOIL STRIPPING OPERATIONS, PREPARE SURFACE SOIL AS FOLLOWS: A. REMOVE EXI5TIN6 GRASS, VEGETATION, AND TURF. DO NOT MIX INTO SURFAGE SOIL. B. LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. PROVIDE WEED ABATEMENT PROCEDURE. APPLY SOIL AMENDMENTS AND FERTILIZERS AGGORDIN6 TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INCHES OF SOIL. TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. G. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. D. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, TRASH, AND OTHER EXTRANEOUS MATTER. E. LEGALLY DISPOSE OF WASTE MATERIAL, INGLUDIN6 GRASS, VEGETATION, AND TURF, OFF OWNER'S PROPERTY. 4. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. 6RADE TO WITHIN PLUS OR MINUS 1/2 INCH OF FINISH ELEVATION. ROLL AND RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH 6RADIN6 TO AREAS THAT GAN BE PLANTED IN THE IMMEDIATE FUTURE. 5. MOISTEN PREPARED AREA BEFORE PLANTING IF SOIL IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. 6. BEFORE PLANTING, OBTAIN LANDSGAPE ARGHITEGT'S ACCEPTANCE OF FINISH 6RADIN6; RESTORE PLANTING AREAS IF ERODED OR OTHERWISE DISTURBED AFTER FINISH 6RADIN6. 7. DO NOT SOW IMMEDIATELY FOLLOWING RAIN, OR WHEN GROUND 15 TOO DRY. TEMPERATURE SHALL BE BETWEEN 55 F AND C,5 F FOR A 24 HOUR PERIOD. WIND SHALL BE LESS THAN 5 MPH. TURF AREA PREPARATION NOTES: I. LIMIT TURF SUB&RADE PREPARATION TO AREAS TO BE PLANTED. 2. NEWLY GRADED 5UB6RADE5: LOOSEN 5UB6RADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. 3. SPREAD PLANTING SOIL OVER LOOSENED SUB6RADE. 4. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THIGKNESS OF SOD. 5. UNGHAN&ED 5UB6RADE5: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXGAVATIN6, 6RADIN6, OR SURFAGE-SOIL STRIPPING OPERATIONS, PREPARE SURFACE SOIL AS FOLLOWS: A. REMOVE EXI5TIN6 GRASS, VEGETATION, AND TURF. DO NOT MIX INTO SURFAGE SOIL. B. LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. APPLY SOIL AMENDMENTS AND FERTILIZERS AGGORDIN6 TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INCHES OF SOIL. TILL 501L TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. 6. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. A. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND 5TIGK5, ROOTS, TRASH, AND OTHER EXTRANEOUS MATTER. B. LEGALLY DISPOSE OF WASTE MATERIAL, INGLUDIN6 GRASS, VEGETATION, AND TURF, OFF OWNER'S PROPERTY. 7. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. 6RADE TO WITHIN PLUS OR MINUS 1/2 INCH OF FINISH ELEVATION. ROLL AND RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH GRADING TO AREAS THAT GAN BE PLANTED IN THE IMMEDIATE FUTURE. 8. MOISTEN PREPARED AREA BEFORE PLANTING IF 501L IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. 9. BEFORE PLANTING, OBTAIN LANDSGAPE ARGHITEGT'S ACCEPTANCE OF FINISH GRADING; RESTORE PLANTING AREAS IF ERODED OR OTHERWISE DISTURBED AFTER FINISH GRAD I N6. WEED ABATEMENT NOTES: I. ALL AREAS TO BE PLANTED OR HYDR05EEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO PLANTING OR HYDROSEEDIN6. 2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH ©ROUND-UPA (GONTAGT HERBICIDE) OR APPROVED EQUAL. 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. 4. CONTRACTOR SHALL OPERATE THE AUTOMATIG IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. 5. APPLY SECOND APPLICATION OF (DROUND-UPA TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE. 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. 7. AT THE TIME OF PLANTING AND HYDROSEEDIN6, ALL PLANTING AREAS SHALL BE WEED FRee. 13 1 14 1 15 1 16 RVEY GROUP PRELIMINARY NOT FOR CONSTRUCTION M o N a) cc C U r1^ jo u Cj C (� .2 C L•n +> L' ac'``6-' a ml0 om 0) E o a0n 3 0 C o .- C C L oE'-a, cc a CO aa) < m E a) c c [p � CD ,3 u� o r- = 2 .2 _ N lb N O U LU Q(V-0 -00 iv z > c o c .°' c 3 Cu c U�w`C� �-. 3 mL � `m Copyright © 2018 All rights reserved. Reproduction or use in any form or by any means without written permission of "eckon Land Design, Inc. is unlawful and subject to criminal prosecution. aLU�W 0, 0 ox W LOL. LS Nma0DOJ LL Z CA (9W3V� m>o>aom Nc aSZE ,<Do MW .J OX v REVISIONS Date Description PROJECT NO.: 17216 DRAWN BY: LID CHECKED BY: JB, MSD DATE: 2/08/18 SHEET NUMBER PP2.5